MONTHYEARL-99-035, Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld1999-10-18018 October 1999 Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld ML20217G0801999-10-0707 October 1999 Informs That on 990930,staff Conducted mid-cycle PPR of Farley & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Will Conduct Regional Insps Associated with SG Removal & Installation ML20217P0661999-10-0606 October 1999 Requests Withholding of Proprietary Rept NSD-SAE-ESI-99-389, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217B1891999-10-0404 October 1999 Submits Clarification Re Development of Basis for Determining Limiting Internal Pressure Loads Re Review of NRC SE for Cycle 16 Extension Request.Util Intends to Use Guidelines When Evaluating SG Tube Structural Integrity ML20212J8391999-09-30030 September 1999 Forwards RAI Re Request for Amends to Ts.Addl Info Needed to Complete Review to Verify That Proposed TS Are Consistent with & Validate Design Basis Analysis.Request Discussed with H Mahan on 990930.Info Needed within 10 Days of This Ltr ML20212J8801999-09-30030 September 1999 Discusses GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps. Util 980731,990607 & 03 Ltrs Provided Requested Info in Subj Gl.Nrc Considers Subj GL to Be Closed for Unit 1 L-99-032, Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 21999-09-23023 September 1999 Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 2 L-99-034, Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 21999-09-23023 September 1999 Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 2 ML20212F8861999-09-23023 September 1999 Forwards Revised Relief Request Number 32 for NRC Approval. Approval Requested by 991231 to Support Activities to Be Performed During Unit 1 Refueling Outage Scheduled for Spring of 2000 ML20212E7031999-09-23023 September 1999 Responds to GL 98-01, Year 2000 Readiness of Computer Sys at Npps. Util Requested to Submit Plans & Schedules for Resolving Y2K-related Issues ML20212F1111999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals ML20212C2351999-09-16016 September 1999 Submits Corrected Info Concerning Snoc Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20212D0101999-09-15015 September 1999 Informs That Submittal of clean-typed Copy of ITS & ITS Bases Will Be Delayed.Delay Due to Need for Resolution of Two Issues Raised by NRC staff.Clean-typed Copy of ITS Will Be Submitted within 4 Wks Following Resolution of Issues ML20212C4641999-09-13013 September 1999 Forwards Info Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams L-99-031, Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed1999-09-13013 September 1999 Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed ML20212C8041999-09-10010 September 1999 Responds to to D Rathbun Requesting Review of J Sherman Re Y2K Compliance.Latest NRC Status Rept on Y2K Activities Encl ML20212D4581999-09-10010 September 1999 Responds to to D Rathbun,Requesting Review of J Sherman Expressing Concerns That Plant & Other Nuclear Plants Not Yet Y2K Compliant ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211N8041999-09-0808 September 1999 Informs That on 990930 NRC Issued GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Condition, to Holders of Nuclear Plant Operating Licenses ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20212C0071999-09-0202 September 1999 Forwards Insp Repts 50-348/99-05 & 50-364/99-05 on 990627- 0807.No Violations Noted.Licensee Conduct of Activities at Farley Plant Facilities Generally Characterized by safety-conscious Operations & Sound Engineering ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211K2131999-08-31031 August 1999 Informs That Snoc Has Conducted Review of Reactor Vessel Integrity Database,Version 2 (RVID2) & Conclude That Latest Data Submitted for Farley Units Has Not Been Incorporated Into RVID2 ML20211K4101999-08-31031 August 1999 Resubmits Relief Requests Q1P16-RR-V-5 & Q2P16-RR-V-5 That Seek to Group V661 Valves from Each Unit Into Sample Disassembly & Insp Group,Per 990525 Telcon with NRC L-99-030, Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS1999-08-30030 August 1999 Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS ML20211G6851999-08-26026 August 1999 Informs That During Insp,Technical Issues Associated with Design,Installation & fire-resistive Performance of Kaowool Raceway fire-barriers Installed at Farley Nuclear Plant Were Identified L-99-029, Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 07271999-08-19019 August 1999 Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 0727 ML20211B9431999-08-17017 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting Period 990101-990630,IAW 10CFR26.71(d).Rept Covers Employees at Jm Farley Nuclear Plant & Southern Nuclear Corporate Headquarters ML20211B9211999-08-17017 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-348/99-09 & 50-364/99-09.Corrective Actions:Security Response Plan Was Revised to Address Vulnerabilities Identified During NRC Insp ML20210R5101999-08-12012 August 1999 Forwards Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16 Only,Based on risk- Informed Approach for Evaluation of SG Tube Structural Integrity,As Result of Staff Comments ML20212C8141999-08-0909 August 1999 Forwards Correspondence Received from Jm Sherman.Requests Review of Info Re Established Policies & Procedures ML20210T2021999-08-0606 August 1999 Forwards Draft SE Accepting Licensee Proposed Conversion of Plant,Units 1 & 2 Current TSs to Its.Its Based on Listed Documents ML20210Q4641999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr to La Reyes,As Listed,With List of Individuals to Take exam,30 Days Before Exam Date ML20210J8341999-07-30030 July 1999 Forwards Second Request for Addl Info Re Util 990430 Amend Request to Allow Util to Operate Unit 1,for Cycle 16 Based on risk-informed Probability of SG Tube Rupture & Nominal accident-induced primary-to-second Leakage ML20210G4901999-07-30030 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, Issued 990603.Ltr Contains NRC License Commitment to Utilize ASTM D3803-1989 with Efficiency Acceptance Criteria Utilizing Safety Factor of 2 L-99-028, Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines1999-07-30030 July 1999 Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines L-99-027, Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.51999-07-27027 July 1999 Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.5 ML20210G8181999-07-26026 July 1999 Forwards Insp Repts 50-348/99-04 & 50-364/99-04 on 990516- 0626.One Violation Identified & Being Treated as Noncited Violation IR 05000348/19990091999-07-23023 July 1999 Discusses Insp Repts 50-348/99-09 & 50-364/99-09 on 990308- 10 & Forwards Notice of Violation Re Failure to Intercept Adversary During Drills,Contrary to 10CFR73 & Physical Security Plan Requirements ML20210E4071999-07-22022 July 1999 Responds to NRC 990702 RAI Re Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described in NEI 97-06, SG Program Guidelines L-99-026, Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments1999-07-19019 July 1999 Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments L-99-264, Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 20011999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20209H4721999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20196J6191999-07-0202 July 1999 Forwards Final Dam Audit Rept of 981008 of Category 1 Cooling Water Storage Pond Dam.Requests Response within 120 Days of Date of Ltr 05000364/LER-1999-001, Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed1999-07-0202 July 1999 Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed ML20196J7471999-07-0202 July 1999 Forwards RAI Re Cycle 16 Extension Request.Response Requested within 30 Days of Date of Ltr ML20196J5781999-07-0202 July 1999 Forwards RAI Re 981201 & s Requesting Amend to TS Associated with Replacing Existing Westinghouse Model 51 SG with Westinghouse Model 54F Generators.Respond within 30 Days of Ltr Date ML20196J6571999-07-0202 July 1999 Discusses Closure to TAC MA0543 & MA0544 Re GL 92-01 Rev 1, Suppl 1,RV Structural Integrity.Nrc Has Revised Rvid & Releasing It as Rvid,Version 2 as Result of Review of Responses ML20196J3591999-06-30030 June 1999 Forwards SE of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217G0801999-10-0707 October 1999 Informs That on 990930,staff Conducted mid-cycle PPR of Farley & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Will Conduct Regional Insps Associated with SG Removal & Installation ML20212J8801999-09-30030 September 1999 Discusses GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps. Util 980731,990607 & 03 Ltrs Provided Requested Info in Subj Gl.Nrc Considers Subj GL to Be Closed for Unit 1 ML20212J8391999-09-30030 September 1999 Forwards RAI Re Request for Amends to Ts.Addl Info Needed to Complete Review to Verify That Proposed TS Are Consistent with & Validate Design Basis Analysis.Request Discussed with H Mahan on 990930.Info Needed within 10 Days of This Ltr ML20212E7031999-09-23023 September 1999 Responds to GL 98-01, Year 2000 Readiness of Computer Sys at Npps. Util Requested to Submit Plans & Schedules for Resolving Y2K-related Issues ML20212F1111999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals ML20212C8041999-09-10010 September 1999 Responds to to D Rathbun Requesting Review of J Sherman Re Y2K Compliance.Latest NRC Status Rept on Y2K Activities Encl ML20212D4581999-09-10010 September 1999 Responds to to D Rathbun,Requesting Review of J Sherman Expressing Concerns That Plant & Other Nuclear Plants Not Yet Y2K Compliant ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211N8041999-09-0808 September 1999 Informs That on 990930 NRC Issued GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Condition, to Holders of Nuclear Plant Operating Licenses ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20212C0071999-09-0202 September 1999 Forwards Insp Repts 50-348/99-05 & 50-364/99-05 on 990627- 0807.No Violations Noted.Licensee Conduct of Activities at Farley Plant Facilities Generally Characterized by safety-conscious Operations & Sound Engineering ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211G6851999-08-26026 August 1999 Informs That During Insp,Technical Issues Associated with Design,Installation & fire-resistive Performance of Kaowool Raceway fire-barriers Installed at Farley Nuclear Plant Were Identified ML20210T2021999-08-0606 August 1999 Forwards Draft SE Accepting Licensee Proposed Conversion of Plant,Units 1 & 2 Current TSs to Its.Its Based on Listed Documents ML20210Q4641999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr to La Reyes,As Listed,With List of Individuals to Take exam,30 Days Before Exam Date ML20210J8341999-07-30030 July 1999 Forwards Second Request for Addl Info Re Util 990430 Amend Request to Allow Util to Operate Unit 1,for Cycle 16 Based on risk-informed Probability of SG Tube Rupture & Nominal accident-induced primary-to-second Leakage ML20210G8181999-07-26026 July 1999 Forwards Insp Repts 50-348/99-04 & 50-364/99-04 on 990516- 0626.One Violation Identified & Being Treated as Noncited Violation IR 05000348/19990091999-07-23023 July 1999 Discusses Insp Repts 50-348/99-09 & 50-364/99-09 on 990308- 10 & Forwards Notice of Violation Re Failure to Intercept Adversary During Drills,Contrary to 10CFR73 & Physical Security Plan Requirements ML20196J5781999-07-0202 July 1999 Forwards RAI Re 981201 & s Requesting Amend to TS Associated with Replacing Existing Westinghouse Model 51 SG with Westinghouse Model 54F Generators.Respond within 30 Days of Ltr Date ML20196J6571999-07-0202 July 1999 Discusses Closure to TAC MA0543 & MA0544 Re GL 92-01 Rev 1, Suppl 1,RV Structural Integrity.Nrc Has Revised Rvid & Releasing It as Rvid,Version 2 as Result of Review of Responses ML20196J6191999-07-0202 July 1999 Forwards Final Dam Audit Rept of 981008 of Category 1 Cooling Water Storage Pond Dam.Requests Response within 120 Days of Date of Ltr ML20196J7471999-07-0202 July 1999 Forwards RAI Re Cycle 16 Extension Request.Response Requested within 30 Days of Date of Ltr ML20196J3591999-06-30030 June 1999 Forwards SE of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs ML20196D1931999-06-22022 June 1999 Discusses Requesting Approval & Issuance of Plant Units 1 & 2 ITS by 990930.New Target Date Agrees with Requested Date ML20196H9801999-06-10010 June 1999 Submits Two RAI Re ITS Section 4.0 That Were Never Sent. Reply to RAI Via e-mail ML20196A3401999-06-10010 June 1999 Forwards Insp Repts 50-348/99-03 & 50-364/99-03 on 990404-0515.No Violations Noted ML20206R4741999-05-13013 May 1999 Informs That Staff Reviewed Draft Operation Insp Rept for Farley Nuclear Station Cooling Water Pond Dam & Concurs with FERC Findings.Any Significant Changes Made Prior to Issuance of Final Rept Should Be Discussed with NRC ML20206M2321999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Mgt Created ML20206G7341999-05-0404 May 1999 Forwards Safety Evaluation Re Completion of GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20206G2411999-04-30030 April 1999 Forwards Revised RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, Program at Farley.Requests to Be Notified of Rev to Original Target Date of 990521 ML20206R2031999-04-29029 April 1999 Forwards Insp Repts 50-348/99-02 & 50-364/99-02 on 990221-0403.No Violations Noted ML20205T1931999-04-0909 April 1999 Informs That on 990316,J Deavers & Ho Christensen Confirmed Initial Operator Licensing Exam Schedule for Farley NPP for Y2K.Initial Exam Dates Are Wks of 000508 & 22 for Approx 12 Candidates.Chief Examiner Will Be C Ernstes ML20205Q1541999-04-0606 April 1999 Forwards Insp Repts 50-348/99-09 & 50-364/99-09 on 990308-10.One non-cited Violation Identified ML20205M2831999-04-0202 April 1999 Forwards Errata Ltr for Farley Nuclear Power Plant FEMA Exercise Rept.Page 19 of Original Rept Should Be Replaced with Encl Corrected Page 19 ML20196K4881999-03-19019 March 1999 Forwards Insp Repts 50-348/99-01 & 50-364/99-01 on 990110- 0220.One Violation of NRC Requirements Occurred.Violation Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20205A2611999-03-19019 March 1999 Advises of NRC Planned Insp Effort Resulting from Farley Plant Performance Review on 980202.Historical Listing of Plant Issues & Details of NRC Insp Plan for Next 8 Months Encl ML20204C9561999-03-17017 March 1999 Forwards RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, Program at Plant,Units 1 & 2.Response Requested by 990521 ML20204E6601999-03-11011 March 1999 Discusses Ofc of Investigation Rept 2-1998-024 Re Contract Worker Terminated by General Technical Svc Supervisor for Engaging in Protected Activity.Evidence Did Not Substantiate Allegation & No Further Action Planned ML20207M2181999-03-11011 March 1999 Advises That Info Contained in 990125 Application CAW-99-1318 & Affidavit Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20207M1991999-03-0808 March 1999 Partially Withheld Info Re Meeting Held on 990129 at Region II Ofc in Atlanta,Ga to Discuss Physical Protection Measure for Svc Water Intake Structure Located at Facility (Ref 10CFR73.21).List of Attendees Encl ML20206U1831999-02-0909 February 1999 Responds to Encl Ltrs, & 1223 Re Generic Implication of part-length CRDM Housing Leak.Review Under TAC Numbers MA1380 & MA1381 Considered Closed ML20203G5541999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 940407. Representative of Facility Must Submit Either Ltr Indicating No Candidates or Listing of Candidates for Exam ML20203G3921999-02-0202 February 1999 Forwards Insp Repts 50-348/98-08 & 50-364/98-08 on 981129- 990109 ML20199L4451999-01-25025 January 1999 Forwards for Review & Comment Revised Draft Info Notice Re Inservice Testing of A-4 Multimatic Deluge Valve for Farley NPP Units 1 & 2.Informs That Comments Submitted on 981120 Were Reviewed & Incorporated Where Appropriate ML20199K7351999-01-21021 January 1999 Responds to 981123 Request by Providing Copy of Latest Draft of Info Notice Being Prepared Which Discusses Failure of Several Preaction Sprinker Sys Deluge Valves.Requests Submittal of Comments by 981120 ML20199K7231999-01-20020 January 1999 Confirms 990119 Telcon Re Informational Meeting Scheduled for 990129 to Be Held in Atlanta,Ga to Discuss Security Related Issues at Plant.Meeting Will Be Closed to Public,Due to Sensitive Nature of Issues ML20199K1381999-01-12012 January 1999 Informs That on 990117,Region II Implemented Staff Reorganization as Part of agency-wide Streamlining Effort, Due to Staffing Reductions in FY99 Budget.Organization Charts Encl ML20199D8541999-01-12012 January 1999 Forwards SE Accepting Relief Request for Inservice Insp Program for Plant,Units 1 & 2 ML20199C9361999-01-0808 January 1999 Forwards Insp Repts 50-348/98-14 & 50-364/98-14 on 981207- 10.No Violations Noted 1999-09-09
[Table view] |
Inspection Report - Farley - 1997014 |
---|
|
|
Text
_ __. _
_ - - _ _ _ __ _ _________ __ _-__ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ - _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ - - _ __-_
, ,
,
o August 12, 1998 EA 97-571 EA 98-407 Southern Nuclear Operating Company, Inc.
ATTN: Mr. D. Vice President P. O. Box 1295 Birmingham. AL 35201 SUBJECT: NRC INSPECTION REPORT NOS. 50-348/97-14 AND 50-364/97-14
Dear Mr. Morey:
Thank you for your res3onse of January 23. 1998, to our Notice of Violation (NOV), issued on Decem]er 29, 1997, concerning activities conducted at your Farley Nuclear Plant. We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. Your response included the denial of Violation B. Our evaluation of your response has been completed. A summary of the response is provided by enclosure to this letter.
You denied Violation B of the NOV on the basis that tornado missile protection of the turbine-driven auxiliary feedwater pump (TDAFW) turbine exhaust was not included in the original plant design because of the two motor-driven auxiliary feedwater pumps that are protected from tornado missiles by being located in the Category I Auxiliary Building. You indicated that this design was consistent with Section 3.5.4 of the Updated Final Safety Analysis Report (UFSAR) in that a loss of the TDAFW pump due to tornado generated missiles ;
will not cause a failure of the two motor-driven auxiliary feedwater pumps. j After reviewing your letter, we have determined that Violation B of the l December 29, 1997, NOV did not constitute a violation. Although there was no '
violation, we do not agree with the statements in your January letter that the Farley design and licensing basis does not require the postulation of a single I active failure in conjunction with consequential failures which are the direct I result of a design basis tornado. However, because of the remaining i
'
redundancy of the two motor-driven auxiliary feedwater pumps following a loss of the TDAFW pump due to tornado induced failures. we have also concluded that ,
the TDATW pump turbine exhaust stack does not need to be protected from I tornado generated missiles. Accordingly, we will adjust our records to reflect that no violation of regulatory requirements occurred with respect to item No. B. ;
'
9008180211 980812 PDR ADOCK 05000348 G PDR i
a . _ _ . _ _ . _
.7d / '
- _ ___ - -_ -_-_ _ _ - _ _ _ _ - _ - _
-
,
,
.-
SNOPC0 2 We appreciate your cooperation in this matter.
Sincerely
.
Original' signed by Loren R. Plisco Loren R. Plisco, Director Division of Reactor Projects Enclosure: Task Interface Agreement Response cc w/ encl:
M. J. Ajluni. Licensing Services Manager, B-031'
Southern Nuclear Operating Company, Inc.
42 Inverness Center Parkway Birmingham, AL 35201-1295 M. Stinson General Manager, Farley Plant Southern Nuclear Operating Company, Inc.
P. O. Box 1295 Birmingham, AL 35201-1295 J. D. Woodard
' Executive Vice President Southern Nuclear Operating Company, Inc.
P. O. Box 1295 Birmingham, AL 35201-1295 State Health Officer Alabama Department of Public Health 434 Monroe Street Montgomery, AL 36130-1701 M. Stanford Blanton
,
Balch and Bingham Law Firm P. O. Box 306
, ~1710 Sixth Avenue North l Birmingham, AL 35201 l
Chairman Houston County Commission P. O. Box 6406 Dothan. AL 36302 l
- _ _ - - - - _ - - - - - - _ - - - - - - - - - - - - -
--- _ _ _ . - . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ - _ - - _ _ - _ . _ _ . ___ - . _ _ _ _ - - - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - - _
-
.
t
,
SN0PC0 3 Distribution w/ encl:
L. Plisco. RII P. Skinner. RII B. Holbrook. RII J. Zimmerman. NRR J. Lieberman. OE B. Summers. OE PUBLIC NRC Resident Inspector U. S. Nuclear Regulatory Commission 7388 N. State Highway 95 Columbia. AL 36319
.
O \
0FFICE
- For previous concurrence see attached page Ril:DRS* All:DRS* All:DRS, RII:DRP* RM@
,
y/ NRR ,Mj
/_
SamRE m ay b W rgy AJA MAfE 150erriweether:pd KLandis BMet tet't i PSKinner '%lhi u hjerk&w '"
DATE 7/ /96 7/ /96 $ dry /96 7/ /96 klO /98T 7/ \\ /96 7/ /96
'
(2FYY YES ~10 0 YES IID 'YES 10 0 YES ND kEl 10 0 3 YES [ 110 3 YES 10 0 0FFICIAL RECORD (X1PY DOCUMENT IIAME: S:\DRS\EB\97-14.lDDI
__ _-_.
__ _ _ _ - _ __ . _ _ - _ _ _ _ _ - - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ -- _ _ _ _ __. - . __
.
.
i
,
-
\
SNOPC0 3 Distribution w/ enc 1:
L. Plisco, RII.
P. Skinner, RII B,ti0lbak-R. Carrion, RII J. Zimmerman, NPsR J. Lieberman. OE B. Summers, OE PUBLIC NRC Resident Inspector U. S. Nuclear Regulatory mmission 7388 N. State Highway 9 Columbia. AL 36319 i
n v . %
OFFICE Ell:DRS @ V RII;p $ RII:DRS Elli$[' RII:EICS NRR I SI M TLIRE ff{ghd% MM/ (,( ff\
NAE d(Islerr'iweether:pd KLayi) BMettett PStirner , ABotand H8erkow DATE // fM/ /98 7/ M /98 7/ /98 7A S T /98 7/ /98 7/ /98 7/ /98 12FY? ( YER 11 0 ['EEST 11 0 YES NO /IEs i NO YES NO YES 10 0 YES NO OFFid1All RECORD COPY V 00GMNT IIAE: S:\DR Bk97-14.NMM
!
l L
_ . - . _. _ . _ _ - _ - _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _
. .
Enclosure
.
'
.
l TASK INTERFACE AGREEMENT RESPONSE BY THE OFFICE OF NUCLEAR REACTOR REGULATION TORNADO PROTECTION OF TURBINE DRIVEN AUXILIARY FEEDWATER PUMP TURBINE VENT STACK (TAC NOS. MA1067 AND MA1068)
SOUTHERN NUCLEAR OPERATING COMPANY. INC.
JOSEPH M. FARLEY NUCLEAR PLANT. UNITS 1 AND 2 DOCKET NOS. 50-348 AND 50-364 1.0 INTRODUCTION By letter dated February 24,1998, you requested NRR's technical assistance in evaluating whether the Farley design and licensing basis requires the licensee to assume a single active failure of a design basis tomado, and if so, whether the turbine driven auxiliary feedwater (TDAFW) pump turbine exhaust must be protected from tomado missiles to meet the single failure criterion.
2.0 EVALUATION Region'll issued a Notice of Violation 54348,364/97-14-05 (dated December 29, 1997) regarding the lack of missile protection and various statements in the Updated Final Safety Analysis Report (UFSAR) that indicated the AFW system and its piping are either housed in Seismic Category I structures or buried underg"ound. By letter dated January 23,1998, the licensee denied the violation on the be. sis that missile protection of the TDAFW pump turbine vent was not required bect,use of the two motor-driven (MD) AFW pumps that are tornado missile protected.
In that denial, the licensee stated that they are not committed to Regulatory Guide (RG) 1.117, " Tornado Design Classification," dated 1978, and are not required to assume a single active failure in conjunction with the consequential failures, which are the direct result of the tornado generated missile. In defense of this position (no
'
single failure), the licensee has provided the following quote from a June 1,1977, internal memo .
l Both (meaning the NRC Accident Analysis Branch Chief and the Auxiliary l Systems Branch Chief) confirmed that the NRC is not applying the single failure criterion in determining the acceptability of plant designs to cope with tornado 3 missiles. Their rationale lies in the low probability cf occurrence associated with
! the design basis tornado characteristics (Regulatory Guide 1.76) and the ;
existence of missiles defined in SRP 3.5.1.4. j The licensee discusses that the above discussion and quote occurred prior to the issuance of RG 1.117 and, therefore, supports the claim that single active random failures, concurrent with a tornado, were not considered by the staff during that
a_-________.
.
.
i licensing time frame for Farley. However, RG 1.117 was issued for comment in June 1976,. and reflects the staff's tornado missile protection philosophy of the early and mid 1970s. It is relatively clear from the appendix to the draft RG that the staff did not consider it acceptable to protect only one train of safe shutdown equipment from tornado generated missiles. The subsequent RG 1.117 issued in April 1978, clarified specifically that single failures should be assumed in conjunction with tornaoo missile damage. While the discussion quoted by the licensee may have taken place in some form, we cannot be sure as to !
the exact wording or of subsequent phone calls that may have corrected any incorrect '
or misunderstood statements. Unless there is documented evidence to the contrary, it is our belief, and hence our position, that single active failures were considered by the staff in conjunction with direct tornado induced failures during the licensing of Farley, Units 1 and 2.
With respect to the protection of the TDAFW pump turbine vent, it is possible that the staff (Auxiliary and Power Conversion Systems Branch) was aware of the vulnerability but considered it acceptabla based on the redundancy afforded by the two MDAFW pumps. There are a number of three pump plants where the TDAFW pump may not be completely seismic, or completely tornado missile protected, or both. At these plants, a single MDAFW pump is adequate to remove heat following either of these natural phenomena. Farley is one of these plants as shown by Section 6.5.1 of the UFSAR where it is stated that each of the MDAFW pumps is sized to supply 100
'
percent of the required feedwater flow for a normal safe cooldown of the reactor coolant system. This has been reaffirmed by the staff in NUREG 0611, " Generic Evaluation of Feedwater Transients and Small Break Loss of-Coolant Accidents in !
Westinghouse-Designed Operating Plants." In NUREG-0611,Section X.3, the staff's criterion for success of the Farley AFW system is the operation of any one AFW pump for all the loss of feedwater events considered.
Based on the uncertainties in the depth of the staff's review for tornado missile )
protection during the Farley licensing process, and the known capabilities of the J Westinghouse three-pump plants, the design appears to meet the staff's criteria for l protection against tornado generated missiles. Although there may be no violation, the licensee's basis for the denial of the violation is not acceptable because we believe single active failures are part of the design basis and should be considered coincident with a tornado. However, the UFSAR does not appear to accurately portray the actual plant design (UFSAR implics all of AFW system is tornado missile protected) and should be clarified in this regard.
3.0 CONCLUSION The staff concludes that the design and licensing basis does require the postulation of a single active failure in conjunction with consequential failures, which are the direct result of a design basis tornado. However, because of the remaining redundancy of the two motor-driven auxiliary feedwater pumps following a loss of the TDAFW pump ,
l due to tornado induced failures, we have also concluded that the TDAFW pump l
'
l turbine exhaust stack does not need to be protected from tornado generated missiles.