TAC:56565
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Request for: Approved, Closed | |
Initiation
| |
From | |
MONTHYEARML20205F0471986-08-0808 August 1986
[table view]Calculation of DBA-1 Pcrv Penetration Leak Rate ML20205F0381986-08-13013 August 1986 Discusses Revs to Facility FSAR Description of Helium Leak Rate from Pcrv. Calculation of DBA-1 Pcrv Penetration Leak Rate & Updated FSAR Pages Encl ML20206P2001986-08-22022 August 1986 Ack Receipt of Transmitting Rept Entitled, Parameter Trending Test Program. Data from Rept Will Be Incorporated Into Listed Ongoing Licensing Actions ML20213D6651986-11-0404 November 1986 Ack Receipt of Util Re Leak Rates for Prestressed Concrete Reactor Vessel.Staff Does Not Intend to Review Revised Calculations Unless Requested.Util Must Continue to Utilize FSAR Leakage of 0.2% Per Day ML20215J9031987-05-0606 May 1987 Forwards Requests for Addl Info Re Nov 1985 Draft Tech Spec Section 3/4.8 Re Electrical Sys.Encl 1 Deals w/831230 & 840626 Proposed Tech Spec Change Requests.Encl 2 Encompasses Upgrade to Sts.Response Requested within 90 Days ML20235F3361987-07-0202 July 1987 Forwards Request for Addl Info Re Tech Spec Upgrade Program, Including Addition of Calibr Requirement for Seismic Instruments Determined to Be Out of Calibr Following Seismic Event ML20236C4861987-07-21021 July 1987 Notification of 870806-07 Meetings W/Util,Ornl & Inel in Platteville,Co to Discuss Tech Spec Upgrade Program ML20237J6871987-08-14014 August 1987 Notification of 870825 & 26 Meetings W/Util,Inel & ORNL Onsite to Discuss Tech Spec Upgrade Program ML20196K0581988-03-0707 March 1988 Forwards NRC Position Re Tech Spec Upgrade Program,Per 870825,26,1202 & 03 Meetings.Items Discussed Include Diesel Generator Start Time,Load Tests,Battery Equalizing Charges & Battery Interrack Connection Resistance ML20151M1481988-07-21021 July 1988 Forwards Safety Evaluation Re Requirements for Redundancy in Responding to Rapid Depressurization Accident.Proposals for Redundancy Requirement to Respond to DBA 2 Acceptable ML20245D1891989-04-19019 April 1989 Forwards Integrated Technical Evaluation Rept for Review of Fort St Vrain Tech Spec Upgrade Program, to Aid in Developing Suitable Set of Defueling Tech Specs 1987-07-02 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:56565&oldid=3219937"