TAC:44673
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Request for: Open | |
Initiation
Questions Answers Results
Other: ML20062A475, ML20204G206, ML20263D240, ML20263D295, ML20263D298, ML20263D301, ML20263D420, ML20263D425, ML20263D429, ML20263D430, ML20263D432, ML20263D440, ML20263D449, ML20263D456, ML20263D459, ML20263D463, ML20263D483, ML20263D494, ML20263D879, ML20263D883, ML20263D885, ML20263D888, ML20263D892, ML20263D894, ML20263D898, ML20263D901, ML20263D905, ML20263D908, ML20263D911, ML20263D913, ML20263D916, ML20263D918, ML20263D921, ML20263D924, ML20263D927, ML20263D930, ML20263D934, ML20263D938, ML20263D941, ML20263D944, ML20263D948, ML20263D951, ML20263D955, ML20263D957, ML20263D961, ML20263D965, ML20263D967, ML20263J056, ML20263J059, ML20263J062... further results | |
From | |
MONTHYEARML20263J0711972-07-10010 July 1972
[table view]Schematic Diagram:Bistable Trip String,Module Interlock, Test Trip Subassembly D (48 of 50), as-built ML20263J0731972-07-10010 July 1972 Schematic Diagram:Bistable Trip String,Module Interlock, Test Trip Subassembly a, as-built ML20263J0781972-07-10010 July 1972 Schematic Diagram:Bistable Trip String,Module Interlock, Test Trip Subassembly C ML20263J0751972-07-18018 July 1972 Schematic Diagram:Bistable Trip String,Module Interlock, Test Trip Subassembly B (46 of 50), as-built ML20263J0831979-06-0606 June 1979 Piping & Instrument Diagram HP & Auxiliary Turbines System. Sheet 1 of 3.Revision Date Illegible ML20263J0911980-04-21021 April 1980 Turbine Building Arfa II Conduit & Tray Arrangement Plan at Ground & Mezzanine Floor. Sheet 2 of 2 ML20263J0951980-04-21021 April 1980 Plant Areas Conduit Arrangement Plan at Turbine Deck. Sheet 2 of 2 ML20263J0991980-04-21021 April 1980 Turbine Building Area Conduit & Tray Arrangement Plan at Mezzanine Floor. Sheet 2 of 2 ML20263J1011980-04-21021 April 1980 Turbine Building Area Conduit & Tray Arrangement Plan at Ground Floor. Sheet 1 of 1 ML20263J1041980-04-21021 April 1980 Auxiliary Building Area - B Class II Conduits & Class I & II Tray Arrangement - Plan at Turbine Deck. Sheet 1 of 1 ML20263J0631980-04-25025 April 1980 885-NI/RPS - Schematic Turbine Trip Subassembly C ML20263J1081980-08-10010 August 1980 Cm&D Equipment OTSG Level Sensing ML20263J0861980-08-20020 August 1980 Figure 3.1-1 Auxiliary Feedwater System P&Jid ML20263J0801980-09-0808 September 1980 Piping & Instrument Diagram HP & Auxiliary Turbines System. Revision Illegible ML20263J0681980-09-10010 September 1980 885-NI/RPS - Schematic Main Feed Water Pump Trip Subassembly a ML20263J0661980-09-10010 September 1980 885-NI/RPS - Schematic Turbine Trip Subassembly B ML20263J0621980-09-10010 September 1980 885-NI/RPS - Schematic Turbine Trip Subassembly E ML20263J0591980-09-10010 September 1980 885-NI/RPS - Schematic Turbine Trip Subassembly C ML20263J0561980-09-10010 September 1980 885-NI/RPS - Schematic Turbine Trip Sub Assembly ML20263J1101981-02-20020 February 1981 EFIC Logic 1 Steam Generator a Level Input ML20263J1141981-02-20020 February 1981 EFIC Logic 2 Steam Generator B Level Input ML20263J1181981-02-20020 February 1981 EFIC Logic 3 Steam Generator Pressure ML20263J1211981-02-20020 February 1981 Trip Logic ML20263J1241981-02-20020 February 1981 EFIC Logic 6 Vector Logic ML20263J1261981-02-20020 February 1981 EFIC Logic 12 Steam Generator Control ML20263J1291981-02-20020 February 1981 EFIC Logic 5 Initiate Logic ML20263J1321981-02-20020 February 1981 EFIC Trip Test Philosophy ML20263J1421981-02-20020 February 1981 EFIC Symbology ML20263J0881981-09-0808 September 1981 Anticipatory Reactor Trip System Instrument Installation. Sheet 1 of 2 ML20263J1481981-09-0808 September 1981 One Line Diagram 4160 Volt System. Sheet 7.No Revision Date ML20263J1531981-09-0808 September 1981 One Line Diagram 4160 Volt System. Sheet 6.No Revision Date ML20062A4751982-07-27027 July 1982 Responds to NRC 820711 Telcon Re Annunciation of Manual Bypass of Auxiliary Feedwater Auto Initiation.New Control Sys Will Annunciate in Control Room When Auxiliary Feedwater Auto Initiator Is Bypassed ML20058G7731982-07-27027 July 1982 Responds to NRC 820721 Request for Addl Info Re TMI Action Item II.E.1.2 Concerning Auxiliary Feedwater Sys Flow Indication.Currently Installed Indicator Will Be Replaced W/Safety Grade Differential Pressure Flow Indicator ML20263D9651982-09-0101 September 1982 B&W Emergency Feedwater Initiation and Control System (EFIC) Wiring Diagram. Sheet 6 of 7.Consists of 3 Aperture Cards ML20263D9611982-09-0101 September 1982 B&W Emergency Feedwater Initiation & Control System (EFIC) Wiring Diagram. Sheet 5 of 7.Consists of 2 Aperture Cards ML20263D9571982-09-0101 September 1982 B&W Emergency Feedwater Initiation & Control System (EFIC) Wiring Diagram. Sheet 4 of 7.Consists of 2 Aperture Cards ML20263D9671982-09-0101 September 1982 B&W Emergency Feedwater Initiation & Control System (EFIC) Wiring Diagram. Sheet 7 of 7.Consists of 2 Aperture Cards ML20263D9511982-09-0202 September 1982 B&W Emergency Feedwater Initiation and Control System (EFIC) Wiring Diagram. Sheet 2 of 7.Consists of 2 Aperture Cards ML20263D9481982-09-0202 September 1982 B&W Emergency Feedwater Initiation & Control System (EFIC) Wiring Diagram. Sheet 1 of 7.Consists of 2 Aperture Cards ML20263D9551982-09-0606 September 1982 B&W Emergency Feedwater Initiation & Control System (EFIC) Wiring Diagram. Sheet 3 of 7.Consists of 2 Aperture Cards ML20263D8831982-12-23023 December 1982 Marked-up Elem Diag Efic Matrix a Cont and EFW Act a, Interim Drawing.Sheet EF-15.No Revision Date ML20263D8791982-12-23023 December 1982 Marked-up Elem Diag Mot Drvn Emg Fd Wtr PP3A (EFP-1) Auto Ckt, Interim Drawing.Sheet EF-14.No Revision Date ML20263D4941982-12-23023 December 1982 Marked-up Elem Diag Mot Drvn Emg Fd PP3A(EFP-1) 416OV Es Swgr 3A & 3A3, Interim Drawing.Sheet EF-01B.No Revision Date. Actual Drawing Number Is B-208-026/EF-01B ML20263D4831982-12-23023 December 1982 Marked-up Elem Diag Motor Driven Emerg Feed-PP3A, Interim Drawing.Sheet EF-01A.No Revision Date. Actual Drawing Number Is B-208-026/EF-01A ML20263D4631982-12-23023 December 1982 Marked-up Elem Diag-Index Emergency Feedwater Sys, Interim Drawing.Sheet EF-00.No Revision Date ML20263D4591982-12-23023 December 1982 Marked-up Alarm Point List Emergency Feedwater Sys, Interim Drawing.No Revision Date ML20263D4561982-12-23023 December 1982 Marked-up Elem Diag Turb Driven Emer Feed Pp Inlet Iso Vlv ASV-5, Interim Drawing.Sheet AS-01.No Revision Date ML20263D4491982-12-23023 December 1982 Marked-up Alarm Pt List Aux Steam Sys (As), Interim Drawing.No Revision Date ML20263D4401982-12-23023 December 1982 Marked-up Elem Diag Main St Line Rupture Press Matrix Select I, Interim Drawing.Sheet FW-47.No Revision Date ML20263D4321982-12-23023 December 1982 Marked-up Elem Diag Efic Matrices Stm Gen A/Act 1 Mn Stm and Mn Feedwater Isol, Interim Drawing.Sheet FW-58.No Revision Date 1980-09-10 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:44673&oldid=3215348"