ML20216G341
ML20216G341 | |
Person / Time | |
---|---|
Issue date: | 09/20/1999 |
From: | Combs F NRC OFFICE OF STATE PROGRAMS (OSP) |
To: | Kane W, Lohaus P, Paperiello C NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), NRC OFFICE OF STATE PROGRAMS (OSP) |
Shared Package | |
ML20216G347 | List: |
References | |
NUDOCS 9910010020 | |
Download: ML20216G341 (4) | |
Text
-
N 2 0 1999 l MEMORANDUM TO: Carl J. Paperiello, Deputy Executive Director for Materials, Research and State Programs Paul H. Lohaus, Director Office of State Programs William F. Kane, Director Office of Nuclear Material Safety l and Safeguards Karen D. Cyr, General Counsel FROM: Frederick C. Combs, Deputy Director Original signed by:
Office of State Programs Frederick C. Combs
SUBJECT:
INTEGRATED MATERIALS PERFORNANCE EVALUATION PROGRAM (IMPEP) REVIEW OF SOUTH CAROLINA RADIATION CONTROL PROGRAM J This memorandum transmits to the Management Review Board (MRB) a proposed final report (Attachment 1) documenting the IMPEP review of the South Carolina Rad;ation Control Program. The review of the South Carolina program was conducted by an interoffice team during the period of July 12-16,1999. The team issued a draft report to South Carolina on August 11,1999, for factual comment. South Carolina sent factual comments by letter dated August 31,1999 from Douglas E. Bryant, Commissioner, South Carolina Department of Health and Environmental Control (Attachment to proposed final report).
Based on the findings, the review team recommends to the MRB that the State be found satisfactory for all eight performance indicators. Additionally, the team recommends that South Carolina's program, as a whole, be considered adequate to protect public health and safety and '
compatible with NRC's regulatory program.
The MRB meeting to consider the South Carolina report is scheduled for Wednesday, !
October 6,1999 from 1:00 - 3:00 p.m. In Two White Flint North, Room 2 B-5. In accordance with Management Directive 5.6, the meeting is open to the public. The agenda for that meeting is attached (Attachment 2).
If you have any questions prior to the meeting, please contact me at (301) 415-3340 or James Lynch at (630) 829-9661.
Attachments:
As stated cc: See next page. \
\
Distribution: See next page.
DOCUMENT NAME: G:\lMPEP\SC99MRBMEM.WPD T9 receive e cop r of this document, ind6cate in the bor: *C' = Copy without attachment /enclodre G:\lMPE{\SCIMP99.PFN
^* Copu
= with attachment / enclosure "N" = No copy OFFICE Rill:RSAO/Aj OSP R QS(:)D ) l l NAME JLynch:kk Jfr KNSchneider C/ FC(orrn /
DATE 09/l&/99 09/110/99 Dd/hp/T9 Y 9910010020 990920 OSP FILE CODE: SP-AG-25 PDR $k. fkh
cc: Douglas E. Bryant, Commissioner 2 0 1993 South Carolina Department of Health and Environmental Control.
Virgil R. Autry, Director Division of Radioactive Waste Management Bureau of Land and Waste Management .
Department of Health and Environmental Control T. Pearce O'Kelley, Chief Radiological Health Branch Department of Health and Environmental Control David Snellings, Organization of Agreement States Liaison to MRB i
Distribution:
- DIR RF RWoodruff, Ril - DCD (SP01) . . j SDroggitis Babu-Eld, NMSS - PDR (YES_f__ NO ) )
DPiskura, Rlli RTrojanowski, Ril !
LRakovan RFunderburg, CA GDeegan, NMSS JGreeves, NMSS DCool, NMSS HNewsome,, OGC ,
STreby, OGC DCollins, Ril j South Carolina File i
e 9
paaarg
.' p t UNITED STATES s* NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30086 4 001
% y,,, September f0, 1999 MEMORANDUM TO: Carl J. Paperiello, Deputy Executive Director for Materials, Research and State Programs Paul H. Lohaus, Director Office of State Programs William F. Kane, Director Office of Nuclear Material Safety and Safeguards Karen D. Cyr, General Counsel ,
g FROM: Frederick C. Combs, Deputy r y Office of State Programs /f
SUBJECT:
INTEGRATED MATERIALS PERFORMANCE EVALUATION PROGRAM (IMPEP) REVIEW OF SOUTH CAROLINA RADIATION CONTROL PROGRAM This memorandum transmits to the Management Review Board (MRB) a proposed final report (Attachment 1) documenting the IMPEP review of the South Carolina Radiation Control Program. The review of the South Carolina program was conducted by an interoffice team during the period of July 1216,1999. The team issued a draft report to South Carolina on August 11,1999, for f actual comment. South Carolina sent factual comments by letter dated August 31,1999 from Douglas E. Bryant, Commissioner, South Carolina Department of Health and Environmental Control (Attachment to proposed final report).
Based on the findings, the review team recommends to the MRB that the State be found satisfactory for all eight performance indicators. Additionally, the team recommends that South Carolina's program, as a whole, be considered adequate to protect public health and safety and compatible with NRC's regulatory program.
The MRd aeeting to consider the South Carolina report is scheduled for Wednesday, October 6,1999 from 1:00 - 3:00 p.m. In Two White Flint North, Room 2-B-5. In accordance with Management Directive 5.6, the meeting is open to the public. The agenda for that meeting is attached (Attachment 2).
If you have any questions prior to the meeting, please contact me at (301) 415-3340 or James Lynch at (630) 829-9661.
Attachments:
As stated cc: See next page.
j
7 ...
'f t-MRB Members SEP ? 0 2 cc: ' Douglas E. Bryant, Commissioner South Carolina Department of Health and Environmental Control Virgil R. Autry, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Department of Health and Environmental Control T. Pearce O'Kelley, Chief Radiological Health Branch Department of Health and Environmental Control David Snellings, Organization of.
Agreement States Liaison to MRB l
l I
i l
l