MONTHYEARML20217K3301999-10-19019 October 1999 Safety Evaluation Supporting Amend 195 to License DPR-61 ML20206C8761999-04-28028 April 1999 Safety Evaluation Supporting Amend 194 to License DPR-61 ML20238F2131998-08-28028 August 1998 SER Accepting Defueled Emergency Plan for Emergency Planning for Connecticut Yankee Atomic Power Co ML20202D1621998-06-30030 June 1998 Safety Evaluation Supporting Amend 193 to License DPR-61 ML20217K2101998-03-27027 March 1998 Safety Evaluation Supporting Amend 192 to License DPR-61 ML20198M8101997-10-14014 October 1997 SER Accepting Proposed Revs to Util Quality Assurance Program at Facility ML20141K4201997-05-22022 May 1997 Safety Evaluation Supporting Amend 191 to License DPR-61 ML20058F1151993-11-23023 November 1993 Safety Evaluation Supporting Amends 170,69,169 & 86 to Licenses DPR-61,DPR-21,DPR-65 & NPF-49,respectively ML20059G6411993-11-0101 November 1993 Safety Evaluation Supporting Amend 169 to License DPR-61 ML20059G5261993-10-27027 October 1993 Safety Evaluation Supporting Amend 168 to License DPR-61 ML20057E2011993-10-0404 October 1993 Safety Evaluation Supporting Amend 167 to License DPR-61 ML20057E1921993-10-0404 October 1993 Safety Evaluation Supporting Amend 166 to License DPR-61 ML20058M9051993-09-29029 September 1993 Safety Evaluation Supporting Amend 165 to License DPR-61 ML20058M9291993-09-29029 September 1993 SE Re SEP Topics III-2 & III-4.A, Wind & Tornado Loadings & Tornado Missiles. Licensee Estimated Reactor Core Damage Frequency Reduced Signficantly Such That Likelihood of Core Damage Reasonably Low ML20057A3501993-09-0202 September 1993 Safety Evaluation Supporting Amend 164 to License DPR-61 ML20057A3551993-09-0202 September 1993 Safety Evaluation Supporting Amend 163 to License DPR-61 ML20056G2891993-08-25025 August 1993 Safety Evaluation Supporting Amend 162 to License DPR-61 ML20056D7061993-07-26026 July 1993 Safety Evaluation on SEP VI-4 Re Containment Isolation Sys for Plant.All Penetrations Either Meet Provisions of or Intent of GDCs 54-57 Except for Penetration 39 ML20128E3291993-02-0404 February 1993 Safety Evaluation Granting Util Request for Authorization to Use Portion of Section XI of 1986 Edition of ASME Code for Visual Exams VT-3 & VT-4 to Be Combined Into Single VT-3 ML20128D5231992-11-25025 November 1992 Safety Evaluation Accepting 120-day Response to Suppl 1 to Generic Ltr 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46, ML20210E1891992-06-12012 June 1992 Safety Evaluation Considers SEP Topic III-5.B to Be Complete in That If Pipe Breaks Outside Containment,Plant Can Safely Shut Down W/O Loss of Containment Integrity ML20062B7411990-10-22022 October 1990 Safety Evaluation Supporting Amend 132 to License DPR-61 ML20059H3101990-09-0606 September 1990 Revised Safety Evaluation Clarifying Individual Rod Position Indication Testing Exception & Bases for Approving Test Exception ML20059A8021990-08-14014 August 1990 Supplemental Safety Evaluation Accepting Electrical Design of New Switchgear Room at Plant ML20056A5641990-08-0303 August 1990 Safety Evaluation Concluding That Pressurizer Has Sufficient Fracture Toughness to Preclude Fracture of Head W/Flaws Remaining in Component & Pressurizer Acceptable for Continued Svc ML20055G5441990-07-19019 July 1990 Safety Evaluation Supporting Amend 128 to License DPR-61 ML20055G5561990-07-19019 July 1990 Safety Evaluation Supporting Amend 129 to License DPR-61 ML20055E2361990-07-0202 July 1990 Safety Evaluation Supporting Amend 126 to License DPR-61 ML20247K2531989-09-11011 September 1989 Safety Evaluation Supporting Amends 123 & 41 to Licenses DPR-61 & NPF-49,respectively ML20247E3761989-09-0707 September 1989 Safety Evaluation Supporting Amends 122,34,143 & 40 to Licenses DPR-61,DPR-21,DPR-65 & NPF-49,respectively ML20247A4841989-09-0505 September 1989 Safety Evaluation Supporting Amend 121 to License DPR-61 ML20245J0121989-08-14014 August 1989 Safety Evaluation Accepting Extension of Surveillance Intervals ML20247E6551989-07-20020 July 1989 Safety Evaluation Supporting Amend 120 to License DPR-61 ML20247E6841989-07-18018 July 1989 Safety Evaluation Supporting Amend 119 to License DPR-61 ML20246L2571989-06-26026 June 1989 Safety Evaluation Supporting Amends 118,33,142 & 36 to Licenses DPR-61,DPR-21,DPR-65 & NPF-49,respectively ML20246A8541989-06-23023 June 1989 Safety Evaluation Concluding That Large Containment at Plant Results in Slow Hydrogen Accumulation Rate & Ensures That Sufficient Time Available to Implement Addl Hydrogen Control Features After Accident.Requirements of 10CFR50.44 Met ML20244C4451989-06-0101 June 1989 Safety Evaluation Supporting Amend 117 to License DPR-61 ML20248B3001989-05-31031 May 1989 Safety Evaluation Supporting Amend 116 to License DPR-61 ML20245J0751989-04-25025 April 1989 Safety Evaluation Supporting Amends 114,30,141 & 33 to Licenses DPR-61,DPR-21,DPR-65 & NPF-49,respectively ML20245E8941989-04-21021 April 1989 Safeguards Evaluation Rept Supporting Amend 113 to License DPR-61 ML20235Z0881989-03-0707 March 1989 Safety Evaluation Supporting Amend 112 to License DPR-61 ML20196D8641988-12-0606 December 1988 Safety Evaluation Supporting Amend 109 to License DPR-61 ML20205M5731988-10-26026 October 1988 Safety Evaluation Supporting Amends 108,25,134 & 26 to Licenses DPR-61,DPR-21,DPR-65 & NPF-49,respectively ML20204G8641988-10-18018 October 1988 Safety Evaluation Supporting Licensee Analysis of Consequences of Steam Generator Tube Rupture Accident at Facility Followed by Minimization of Water in Affected Steam Generator After Tube Rupture ML20155G4801988-09-28028 September 1988 Safety Evaluation Supporting Amends 107,23,132 & 24 to Licenses DPR-61,DPR-21,DPR-65 & NPF-24,respectively ML20151T7641988-08-0909 August 1988 Safety Evaluation Supporting Amend 106 to License DPR-61 ML20150A9551988-07-0101 July 1988 Safety Evaluation Supporting Amend 105 to License DPR-61 ML20155F9811988-06-0101 June 1988 Safety Evaluation Supporting Amend 104 to License DPR-13 ML20155G5031988-05-26026 May 1988 Safety Evaluation Supporting Amend 103 to License DPR-61 ML20153G9671988-04-28028 April 1988 Corrected Safety Evaluation Supporting Amend 97 to License DPR-61 1999-04-28
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K3301999-10-19019 October 1999 Safety Evaluation Supporting Amend 195 to License DPR-61 ML20206C8761999-04-28028 April 1999 Safety Evaluation Supporting Amend 194 to License DPR-61 CY-99-047, Ro:On 981217,identified Unsuccessful Dewatering of Cnsi HIC, Model PL8-120R,containing Resins.Caused by Apparent Failure of Dewatering Tree.Other HICs Have Been Procured,Recertified & Returned to Plant for Use1999-03-23023 March 1999 Ro:On 981217,identified Unsuccessful Dewatering of Cnsi HIC, Model PL8-120R,containing Resins.Caused by Apparent Failure of Dewatering Tree.Other HICs Have Been Procured,Recertified & Returned to Plant for Use ML20206F1971998-12-31031 December 1998 Annual Rept for 1998 for Cyap. with CY-99-027, Annual Rept for 10CFR50.59, for Jan-Dec 1998.With1998-12-31031 December 1998 Annual Rept for 10CFR50.59, for Jan-Dec 1998.With ML20198G9101998-12-22022 December 1998 Proposed Rev 2 of Cyap QAP for Haddam Neck Plant. Marked Up Rev 1 Included ML20238F2131998-08-28028 August 1998 SER Accepting Defueled Emergency Plan for Emergency Planning for Connecticut Yankee Atomic Power Co CY-98-136, Ro:On 980727,flow Blockage Occurred & Caused Pressure in Sys to Increase,Resulting in Relief Valve Lifting & Pipe Vibration,Which Caused Leaks to Develop.Caused by Nearly Closed post-filter Inlet Valve.Repaired 2 Leaks in Line1998-08-12012 August 1998 Ro:On 980727,flow Blockage Occurred & Caused Pressure in Sys to Increase,Resulting in Relief Valve Lifting & Pipe Vibration,Which Caused Leaks to Develop.Caused by Nearly Closed post-filter Inlet Valve.Repaired 2 Leaks in Line ML20237B7461998-07-22022 July 1998 1998 Defueled Emergency Plan Exercise Scenario Manual, Conducted on 980722 ML20202D1621998-06-30030 June 1998 Safety Evaluation Supporting Amend 193 to License DPR-61 CY-98-068, Follow-up to Verbal Notification on 980413 of Film on Discharge Canal.Investigation Continuing.Samples Collected for Petroleum Analyses & Biological Characterization at Intake Structure & Discharge Canal.Replaced Sorbent Booms1998-04-15015 April 1998 Follow-up to Verbal Notification on 980413 of Film on Discharge Canal.Investigation Continuing.Samples Collected for Petroleum Analyses & Biological Characterization at Intake Structure & Discharge Canal.Replaced Sorbent Booms CY-98-045, Ro:On 980212,0219,0225 & 0312,separate Sheens of Approx One Cup of oil-like Substance Was Observed at Discharge Canal. Cause Has Not Been Clearly Identified.Called in Vendor Spill to Install Sorbent Booms to Absorb Sheen.W/One Drawing1998-04-13013 April 1998 Ro:On 980212,0219,0225 & 0312,separate Sheens of Approx One Cup of oil-like Substance Was Observed at Discharge Canal. Cause Has Not Been Clearly Identified.Called in Vendor Spill to Install Sorbent Booms to Absorb Sheen.W/One Drawing ML20217F0611998-03-31031 March 1998 Historical Review Team Rept ML20217A0001998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Haddam Neck Plant ML20217K2101998-03-27027 March 1998 Safety Evaluation Supporting Amend 192 to License DPR-61 CY-98-046, Follow-up to 980311 Verbal Notification of Film on Discharge Canal.Cause Not Yet Determined.Film Is Contained & Will Be Absorbed by Containment & Sorbent Booms That Were in Place in Discharge Canal1998-03-12012 March 1998 Follow-up to 980311 Verbal Notification of Film on Discharge Canal.Cause Not Yet Determined.Film Is Contained & Will Be Absorbed by Containment & Sorbent Booms That Were in Place in Discharge Canal ML20216D6531998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Haddam Neck Plant ML20217D7381998-02-28028 February 1998 Revised MOR for Feb 1998 Haddam Neck Plant CY-98-012, Monthly Operating Rept for Jan 1998 for Connecticut Yankee Haddam Neck Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Connecticut Yankee Haddam Neck Plant CY-98-010, Annual Rept for 10CFR50.59,Jan-Dec,19971997-12-31031 December 1997 Annual Rept for 10CFR50.59,Jan-Dec,1997 ML20198N6681997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Haddam Neck Plant ML20217P4861997-12-31031 December 1997 1997 Annual Financial Rept, for Cyap ML20199L5891997-12-24024 December 1997 Independent Analysis & Evaluation of AM-241 & Transuranics & Subsequent Dose to Two Male Workers at Connecticut Yankee Atomic Power Plant ML20203K4271997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Haddam Neck Plant ML20199B1141997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Haddam Neck Plant ML20198M8101997-10-14014 October 1997 SER Accepting Proposed Revs to Util Quality Assurance Program at Facility ML20198J8811997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Haddam Neck Plant ML20210P8721997-08-31031 August 1997 Post Decommissioning Activities Rept, for Aug 1997 ML20217Q3171997-08-31031 August 1997 Addl Changes to Proposed Rev 1 to QA Program ML20210U9301997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Haddam Neck Plant CY-97-082, Special Rept:On 970708,routine Surveillance Testing of Seismic Monitoring Sys Instrumentation Revealed,Data Was Not Being Reproduced by Portion of Playback Sys.Station Presently Pursuing Replacement of Seismic Monitoring Sys1997-08-14014 August 1997 Special Rept:On 970708,routine Surveillance Testing of Seismic Monitoring Sys Instrumentation Revealed,Data Was Not Being Reproduced by Portion of Playback Sys.Station Presently Pursuing Replacement of Seismic Monitoring Sys ML20210L0521997-07-31031 July 1997 Monthly Operating Rept for July 1997 for HNP ML20149E4451997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Haddam Neck Plant ML20141A0041997-05-31031 May 1997 Independent Assessment of Radiological Controls Program at Cyap Haddam Neck Plant Final Rept May 1997 ML20140H5241997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Haddam Neck Plant ML20141K4201997-05-22022 May 1997 Safety Evaluation Supporting Amend 191 to License DPR-61 ML20141D4141997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Connecticut Yankee Haddam Neck ML20138G5901997-04-25025 April 1997 Proposed Rev 1 to Cyap QA Program for Haddam Neck Plant ML20137W8051997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Haddam Neck Plant ML20137H3031997-03-31031 March 1997 Rev 2 to Nuclear Training Loit/Lout Audit Reviews ML20137C6281997-03-14014 March 1997 Redacted Version of Rev 1 to Nuclear Training Loit/Lout Audit Reviews ML20137A0801997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Haddam Neck Plant ML20135C5101997-02-26026 February 1997 1996 Refuel Outage ISI Summary Rept for CT Yankee Atomic Power Co B16268, Special Rept:On 970205,declared Main Stack-Wide Range Noble Gas Monitor Inoperable.Caused by Inadequate Calibr Methods. Will Revise Calibr Procedure to Technique to Demonstrate Accuracy & Linearity Over Intended Range of Monitor1997-02-19019 February 1997 Special Rept:On 970205,declared Main Stack-Wide Range Noble Gas Monitor Inoperable.Caused by Inadequate Calibr Methods. Will Revise Calibr Procedure to Technique to Demonstrate Accuracy & Linearity Over Intended Range of Monitor ML20135E3221997-02-13013 February 1997 Independent Review Team Rept 1996 MP -1 Lout NRC Exam Failures ML20134L2751997-02-0303 February 1997 Draft Rev to GPRI-30, Spent Fuel Storage Facility Licensing Basis/Design Basis ML20138K5721997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Haddam Neck Plant.W/ ML20134L2791997-01-10010 January 1997 Rev 0 to QA Program Grpi ML20134L2911997-01-0808 January 1997 Rev 0 to UFSAR Rev Grpi ML20134L2721996-12-31031 December 1996 Commitment Mgt Grpi 1999-04-28
[Table view] |
Text
_ _ _ _
g e nR8 coq g kg UMTED STATES y NUCLEAR REGULATORY COMMISSION 7,, ,j WASHINGTON, D. C. 20555
\...../ SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION SUPPORTING AMENDMENT NO. 93 TO FACILITY OPERATING LICENSE NO. DPR-61 CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 3 . DOCKET NO. 50-213 1.0 INTP0 DUCTION By letter dated June 1, 1987, the Connecticut Yankee Atomic Power Company (CYAPCO) submitted a request for chances to the Haddam Neck Plant Technical Specifications.
During the 1987 outage, new motor-operated valves were installed into the existing emergency core cooling systems (ECCS) to assure the capability of adequate core cooling over the entire spectrum of postulated pipe breaks.
This license amendment provides (1) new periodic surveillance requirements ost-maintenance surveillance to ensure correct requirements valve position, for throttle (2) p(3) new valve and ECCS retest valves, and requirements following modifications to any ECCS subsystem that would alter ECCS flow characteristics. l 2.0 EVALUATION By letter dated June 1,1987, CYAPC0 proposed technical specification (TS) I changes for the ECCS. These changes were requested because hardware modifications to the ECCS related to the long-term system modifications are being made during the Cycle 14 outage. The TS changes would require the newly installed motor-operated valves (MOVs) to remain in fixed positions so as to not change the present ECCS flow configuration during injection and sump recirculation. In addition, the four newly installed High Pressure Safety Injection System (HPSI) manual valves would be locked in their proper throttled position.
The newly installed NOVs will not be electrically connected following the Cycle 14 outage. The proposed changes to the technical specifications to assure proper ECCS configuration are discussed below. I Valves SI-MOV-854A and B are HPSI pump suction isolation valves that are, replacing manual valves which are normally open during operation. The proposed TS changes requires verification that these valves are in the locked open position once per twelve hours.
3
$((USD$$ $
P l
l
)
4 -
l
)
Valves SI-MOV-901 and 902 are new valves that isolate the new cross-tie line I and are required to be closed to assure the present ECCS flow configuration l The proposed TS change requires verification that these valves are to be in i the locked closed position once every twelve hours, i l
Valve SI-M0V-873 is located in the core deluge line and will serve as a l redundant means of. isolating the core delu modifications are completed and approved. ge lineawhen the permanent It replaces manual valve which is open during operation. The proposed TS change requires verification j that this valve is locked in the open position prior to startup from cold shutdown and also electrically deenergized.
Valves SI-V-905, 906, 907 and 908 are manual throttle valves which are set '
to balance flow in the four HPSI injection lines. The valves are also set j to prevent HPSI flow from exceeding RHR design flow during HpSI )
recirculation. The correct positions will be established by test. The I proposed TS change requires verification that these valves are locked in the throttled position prior to start up from cold shutdown. Correct position ;
verification is also to be required within four hours following maintenance 1 on these valves. l l The proposed TS change requires verification of the correct position of valve RH-FCV-796 within four hours after stroking or maintenance.
CYAPC0 has also proposed a TS change for a flow balance test, which is to be performed during Mode 5 or 6. following completion of modifications to the ECCS subsystems that alter flow characteristics. This TS change would become effective during the Cycle 14 outage. This would verify that HPSI pump injection lines with a single pump running and two lines isolated would have a flow rate through each line of 1000 + or - 100 gpm.
A RHR pump flow test was also proposed. This test is designed to assure that with a single pump running, the RHR pump flow is equal to 1500 plus or minus 280 gpm.
In summary, hardware modifications are being made to the ECCS during the Cycle 14 outage as part of the long-term resolution of mitigating small break loss-of-coolant accidents. However, the new hardware modifications cannot be powered from existing emergency power supplies and therefore final implementation of the modifications must await completion of the new switchgear building during the Cycle 15 outage. The technical specific-ntions described above have been reviewed to assure that the mechanical modifications made during the Cycle 14 would not change the existing ECCS flow configurations during the injection and recirculation modes. ,
Based on our review, we conclude that the proposed technical specifications provide reasonable assurance that the ECCS flow configurations will not be affected by the installed modifications and are therefore acceptable.
3.0 ENVIRONMENTAL CONSIDERATION
This amendment involves a change to a requirement with respect to the installation or use of facility components located within the restricted area as defined in 10 CFR Part 20 and changes to the surveillance requirements. The staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that this amendment involves no significant hazards consideration and there has been no public comment on such finding. Accordingly, this amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance ,
of this amendment. l
4.0 CONCLUSION
The staff has concluded, based on the considerations discussed above, that:
(1) there-is reasonable assurance that the health and safety of the j will not be endangered by operation in the proposed manner, andsuch (2) public :
activities will be ccnducted in compliance with the Commission's regulations and the issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public.
5.0 ACKNOWLEDGEMENT This Safety Evaluation has been prepared by D. Katze, SRXB, NRR and F.
Akstulewicz, PDISA, NRR.
Dated: September 9, 1987 L__________