IR 05000409/1987013

From kanterella
Revision as of 06:45, 27 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards SNM Control & Accountability Insp Rept 50-409/87-13 on 870908-11.No Violations Noted.Rept Withheld (Ref 10CFR2.790)
ML20235J963
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 09/29/1987
From: Mallett B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Taylor J
DAIRYLAND POWER COOPERATIVE
Shared Package
ML19304B529 List:
References
NUDOCS 8710020179
Download: ML20235J963 (2)


Text

{{#Wiki_filter:,

  '
,
.. ;'
. .

I

       !

SEP 2 91987, , i Docket No. 50-409 ,

Dairyland Power Cooperative ATTN: Mr. J. W. Taylor General Manager 2615 East Avenue - South La Crosse, WI 54601 Gentlemen: This refers to the routine Special Nuclear Material Control and Accountability j inspection conducted by Mr. G. L. Pirtle of this office on September 8-11, i 1987, of activities at The La Crosse Boiling Water Reactor, authorized by i NRC Operating License No. OPR-45 and to the discussion of our findings with i Mr. G. Boyd and other members of your staff at the conclusion of the inspection.

I

       ;

The enclosed copy of our inspection report identifies areas examined during I the inspection. Within these areas, the inspection consisted of a selective  ; examination of procedures and representative records, observations, and i interviews with personnel, l No violations of NRC requirements were identified during the course of this l inspectio Areas examined during the inspection concern a subject matter which is exempt from disclosure according to Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations. Consequently, our report of 1 this inspection will not be placed in the NRC Public Document Roo ' We wP., gladly discuss any questions you have concerning this inspectio Sincerel Original Signed by Bruce s. Mallett l Bruce S. Mallett, Ph.D, ChieT Nuclear Material Safety and y Safeguards Branch f' Enclosure: Inspection Re I No. 50-409/87013(DRSS) port (PART 2.790(d) INFORMATION) See Attached Distribution RIII , RIII RIII RIII Pir mnj Dr$[[n [i

  $ reed '  2 ett
    / EUCLOSURE CONTAIKs 8710020179 870929    30CFR2. 790 IRFORMt> TION l PDR ADOCK 05000409:    UPON SEPARATION THIS 1 0  PDR PAGE IS DECONTROLLED ;

k

   . .
,
*
.. .

e Dairyland Power Cooperative 2 SEP 2 8196Ti Distribution cc w/ enclosure: l J. Parkyn, Plant Superintendent ' DCD/DCB (RIDS) l cc w/ enclosure, w/o PART 2.790(d) l INFORMATION: Licensing Fee Management Branch q Resident Inspector, RIII Peter B. Erickson, LPM /NRR Virgil Kanable, Chief . Boiler Section l Charles Thompson, Chairman Wisconsin Public Service Commission Spark Burmaster, Coulee i Region Energy Coalition R. 1. Braund (SLO),

      .

l W1 Div. of Emergency Government Lawrence J. McDonnell, Chief 3 . Radiation Protection Section l l WI Department of Health and Social Services, Division of Health i l LNCLOSURE CONTAINS ON b pf f0RMATION

     "=>sucoud9dlr ;
- - - - --- -------- -- - - _ - - - -

}}