Proposed Tech Spec Table 3.3.7.5-1,amending Action 82 to Avert Required Plant Shutdown in Event That Position Indication Instrumentation for Primary Containment Isolation Valve in Otherwise Isolated Penetration Declared Inoperable
ML20245D814
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 09/28/1988
From:
Public Service Enterprise Group
To:
Shared Package
ML20245D800 List:
References
NUDOCS 8810070174
Download: ML20245D814 (2)


Text

A1TACHMe# 2.

Table 3.3.7.5-1 (Continued)

ACCIDENT MONITORING INSTRUMENTATION ACTION STATEMENT 5 ACTION 80 -

a.

With the number of CPERABLE accident monitoring instrumentation channels less than the Required Number of Channels shown in Table 3.3.7.5-1.~ restore the inoperable channe1(s) to OPERA 8LE status ,

within 7 days or be in at least HDT $ NUT 00km within the next 1 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, b.

With the number of OPERABLE accident monitoring instrumentation channels less than the Minfaus Channels OPERA 8LE reqvfrements of Table 3.3.7.5-1, restore the inoperable channe1(s) to OPERA 8LE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least NOT SHUT 00WN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUT 00WN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

ACTION 81 -

With the number of OPERA 8LE accident monitoring instrumentation channels less than required by the Minimum Channels OPERA 8LE requirement, either restore the inoperable channel (s) to OPERA 8LE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or:

a.

Initiate the proplanned alternate method of monitoring the appropriate parameter (s), and b.

Prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within 14 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring.the system to OPERA 8LE status.

The provisions of Specification 3.0.4 are not applicable.

ACTION 82 - '

a.

With the number of CPERA8LE accident monitoring instrumentation channels less 'than the Required Number of Channels shown in Table 3.3.7.5-1. verify the valve (s) position by use of alternate indica-tion meth store the inoperable channel (s) to OPERA 8LE status

/' within 30 be in at least NOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b. With the number of OPERA 8LE accident monitoring instrumentation channels less than the Minimum Channels OPERA 8LE requirements of Table 3.3.7.5-1. verify the valve (s) position by use of alternate indication methodsg. store the inoperable channel (s) to OPERA 8LE status within 7 days or be in at least NOT SHUT 00WN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SMUT 00WN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. .

pgAoTanBi8@

P ,

HOPE CREEK .

3/4 3-86

. 1

ATTACHMeft 2.

Table 3.3.7.5-1 (continued)

ACCIDENT NONITORING INSTRUMENTATION ACTION STtTEMENT5 ACTION 80 -

a.

With the number of OPERA 8LE accident monitoring instrumentation channels less_ than the Required Number of Channels shown in Table 3.3.7.5-1. restore the inoperable channel (s) to OPERA 8tf status within 7 days or be in at least NOT SHUT 00WN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, b.

With the number of CPERA8LE accident monitoring instrumentation channels less than the Minimus Channels OPERA 8LE requirements of Table 3.3.7.5-1, restore the inoperable channel (s) to OPERA 8LE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least NOT $NUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUT 00WN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

ACTION 81 -

With the number of OPERA 8LE accident monitoring instrumentation '

channels less than required by the Minimum Channels OPERA 8LE requirement, either restore the inoperable channel (s) to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or:

a.

Initiate the preplanned alternate method of monitoring the appropriate parameter (s), and b.

Prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within 14 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to 0PERA8LE status.

The provisions of Specification 3.0.4 are not appitcable.

ACTION 82 -

a.

With the number of OPERABLE accident monitoring instrumentation channels less than the Required Number of Channels shown in Table 3.3.7.5-1. verify the valve (s) position by use of alternate indica-tion method

/' within30dagestoretheinoperablechannel(s)toOPERA8LEstatus ys or be in at least NOT 5HUTOOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD $NUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b. With the number of OPERA 8LE accident monitoring instrumentation channels less than the Minimum Channels OPERA 8LE requirements of Table 3.3.7.5-1. verify the valve (s) position by use of alternate indication method stare the inoperable channel (s) to OPERA 8LE status within 7 d r be in at least NOT $NUTDOWN within the next

'12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTOOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

?!A"lB6M P* Bi8@

HOPE CREEK -

3/4 3-86 i

\ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

. , :.j

-~ ....

INSERT for page 3/4 3-86 t

If the affected' penetration is not isolated pursuant to ACTION a.2 or a.3 of Specification 3.6.3, ...

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ _ . _ . . _ . m_ _