ML20246G284

From kanterella
Revision as of 03:21, 13 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-440/89-17 on 890606-0811 & Notice of Violation
ML20246G284
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/18/1989
From: Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20246G287 List:
References
NUDOCS 8908310286
Download: ML20246G284 (2)


See also: IR 05000440/1989017

Text

- _ _ _ _

.

.g

DpD,

-

_ ,

e ,.

i

  • e

(,

.

-

.t .

_ i

.--

AUG 1 B 1939

"

Docket No.60-440'

The Cleveland Electric

.

Illuminating Company

L ATTN: Mr. Alvin Kaplan

l. Vice President

l Nuclear Group

10 Center Road

Perry, OH 44081-

Genticmen:

This refers to the routine safety inspection conducted by Messrs. P. L. Hiland,

G. F. O'Dwyer, J. A. Ho? kins, D. C. Kosloff and Ms. C. D. Pederson of this

office on June 6 througr August 11, 1989, of activities at Perry Nuclear Power

Plant, Unit 1, authorized by NRC Facility Operating License No. NPF-58 and to

the discussion of our findings with Mr. M. D. Lyster and others of your staff

at the conclusion of the inspection.

The enclosed copy of our' inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

Dur.ing this inspection, certain of your activities appeared to be in violation

with NRC requirements -as specified in the enclosed Notice. A written response

is required. In accordance with 10 CFR 2.790 of the Commission's regulations,

a copy of this letter and the enclosed inspection report will be placed in

the NRC Public Document Room.

The responses directed by this letter and the accompanying hetice are not

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspe: tion.

Sincerely,

ORIGINAL SIGNED BY R. W, peFAYETTE

8906.$10286B{iO

ADOCK O 40

PDR

"

PNU R. C. Knop, Chief

Reactor Projects Branch 3 )

')

Enclosures: j

1. Notice of Violation \

2. Inspection Report ghO

No. 50-440/89017(bRP)

t (

See Attached Distribution i

h """ '

&"{V_

VD'eln  ;

__

- - . _ - _ - _ _ - _ _ - _ .

'i-

-

f ;

py: .

9.g

'> . ..--

, .,

g -

3 The Cleveland Electric 2

E,, I 6 ' U '

Illuminating Company.

'

l- Distribution: ,

,

[-

l cc w/ enclosures::

F. R. Stead,~ Director, Nuclear

Support Department

M. D. Lyster, General Manager,  ?

. Perry Plant Operations Department

-

l ': 'R.'A. Newkirk, Manager,

. Licensing.and Compliance Section

'

S. F. Kensicki, Director, Perry

.

. Plant Technical Department -

lU H. Ray Caldwell, General

Superintendent Nuclear Operations

DCD/DCB.(RIDS)

Licensing' Fee Management' Branch

Resident Inspector, RIII.

' Terry J. Lodge, Esq.

, James W. Harris,. State of Ohio

Roger.Suppes, Ohio

i . Department of Health

l 'A. Grandjean, State of Ohio,

l Public Utilities Commission

'

T. G. Colburn, Sr. Project Manager, NRR

H. R. Caldwell, Ohio Edison.Co.

General Supt. Nuclear Operations

.

76 S. Main Street, Akron, Ohio 44308

R. B Landsman, RIII

.

1

l

l

1

l

!

i

_ _ _ _ _ _ = _ _ _ _ _ __