ML20247J127

From kanterella
Revision as of 14:47, 10 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-348/98-02 & 50-364/98-02 on 980221-0411.No Violations Noted.Integrity of Fire Water Suppression Sys Piping Based on Recent Rupture of Some Concern
ML20247J127
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/08/1998
From: Skinner P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20247J133 List:
References
50-348-98-02, 50-348-98-2, 50-364-98-02, 50-364-98-2, NUDOCS 9805210344
Download: ML20247J127 (4)


See also: IR 05000348/1998002

Text

"

{< .

l May 8, 1998

l

Southern Nuclear Operating Company. Inc. -

-ATTN: Mr. D. N. Morey {

, Vice President

P. O. Box 1295

Birmingham. AL 35201-1295

SUBJECT: NRC INTEGRATED INSPECTION REPORT 50-348/98-02 AND 50-364/98-02

Dear Mr. Morey:

On April- 11. 1998, the U.S. Nuclear Regulatory Commission (NRC) completed an

inspection at your Farley Nuclear Plant (FNP). The enclosed report presents

the results of that inspection.

During the seven-week period your conduct of activities at FNP was generally

characterized by safety-conscious operations, sound engineering and ,

maintenance practices, and careful radiological work controls. Ho m ver, we

are concerned with the integrity of the Fire Water Suppression System piping

baced on the recent rupture and other fire main leakage identified in previous

reperts.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

Sincerely.

(Original signed by

Pierce H. Skinner)

Pierce H. Skirner. Chief I

Reactor Projects Branch 2 i

Division of Reactor Projects ]

i

. Docket Nos.. 50-348 and 50-364

License Nos.. NPF-2 and NPF-8

Enclosure:

1. Inspection Report 50-348/98-02

and 50-364/98-02

cc w/ enc 1: (See Page 2)

i

1ano)a j

9905210344.990500 si l

PDR

G

ADOCK 05000348

PDR

\\' l

'

__ -

Y

_________-_________ - _ _ _____ _ __-_ _ ___ _ - _ - _ _

'

. .

.

SNC 2

cc w/ encl:

-

M. J. Ajluni. Licensing

Services Manager. B-031

Southern Nuclear Operating

Company. Inc.

42 Inverness Center Parkway

Birmingham. AL 35242

R. D. Hill. Jr.

General Manager. Farley Plant

Southern Nuclear Operating

Company. Inc.

P. O. Box 470

Ashford. AL 36312

J. D. Woodard

Executive Vice President

Southern Nuclear Operating

Company. Inc.

P. O. Box 1295

Birmingham. AL 35201

'

State Health Officer

! Alabama Department of Public Health

434 Monroe Street

' Montgomery. AL 36130-1701 i

M. Stanford Blanton

Balch and Bingham Law Firm

P. O. Box 306 i

l 1710 Sixth Avenue North I

Birmingham. AL 35201

!

Chairman

l Houston County Commi,ssion

P. O. Box 6406 3

'

Dothan AL 36302

l Distribution w/ encl:

i L. Plisco. RII

P. Skinner. RII

'

Distribution w/ encl cont'd: (See Page 3)

_ _ _ _ _ - _ _ - _ _ - _ _ - _ _ _ _ _ _ _ _ _

'

,

l

l

SNC 3

Distribution w/ encl:

R. Carrion. Rll .

J. Zimmerman, NRR I

PUBLIC l

NRC Resident Inspector

U. S. Nuclear Regulatory Commission

7388 N. State Highway 95 I

Columbia. AL 36319 l

i

l

!

l

l

l

OFFICE Ell:Dy Ril:D Q Ril:DRP Ril:DRP RII:DRS l

SilMATLNE g QT p y\

NAfE ORp:Sim RPCarrion JN5artLey RKCaldtsell RChou bk

DATE

5{ '$ /95 5/ /95 5/ /95 5/ /95 5/ g /95 5/ /95 5/ /95

wru r \YE5l NO YES ND YE5 NO YE5 NO FESy NO YES NO YES NO

OFflCIM. RECORD COPY DOCLMENT NAfE: G:\FARLEY\lR98-02.neD  ;

l

1