ML20247Q343

From kanterella
Revision as of 20:25, 9 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Deviation from Insp on 890814-18.Deviation Noted: Site Procedure CCI613 Deviated from Licensee Commitment to ASME Code Requirements & Established Visual Exam Program Under 1971 Version of ANSI N18.1
ML20247Q343
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/14/1989
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20247Q282 List:
References
50-318-89-21, NUDOCS 8909280170
Download: ML20247Q343 (1)


Text

_-

APPENDIX B Notice of Deviation Baltimore Gas and Electric Company Docket No. 50-318 Calvert Cliffs Unit 2 License No. DPR-69 As a result of the inspection conducted on August 14-18, 1989 and in accordance L

with the General Statement of Policy and Procedure for NRC Enforcement Action 10 CFR Part 2 Appendix C, the following deviation was identified.

The Calvert. Cliff Inservice Inspection (ISI) Program dated November 6, 1986 states that the 2nd 10 year Inservice Inspection Program will be performed 5 in accordance with ASME Boiler and Pressure Vessel Code Section XI, 1983 Edition, 1983 Summer Addenda. Paragr'aph IWA2300(C) of that Code requires that personnel performing visual examination shall be qualified in accordance with the 1973 version of ANSI N45-2-6.

Contrary to the above, site procedure CCI613 deviated from the licensee's commitment to ASME Code requirements and established the visual examination program under the 1971 version of ANSI NI8.1.

Pursuant to the provisions of 10 CFR 2.201, Baltimore Gas and Electric Company is hereby. required to submit to this office within thirty days of the date of the letter which transmitted this Notice, a written statement or explanation in reply, including: (1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending this response time.

l 0FFICIAL RECORD COPY CIR CC 89 0005.0.0 8909280170 890921 PDR O ADOCK 05000317 PDC L____-_________-____--. ._ _-