PNS-78-057:on 781126,RIV Notified of Explosion in Common Auxiliary Bldg in Brown & Root Qc/Craft Field Office. Explosion Caused by Explosive Device & Destroyed File Cabinent But No Structural Damage to Bldg
ML20249A019
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/27/1978
From: Chapell D, Ervin N, Howard E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
References
PNS-78-057, PNS-78-57, NUDOCS 9806150323
Download: ML20249A019 (2)


Text

..

p y Q pg Qykffp o

4 'y, .

l ,

i PRELIMINARY NOTIFICATION

)

November 27, 1978

,-3 PRELIMINARY NOTIFICATION OF SAFEGUARDS EVENT-- PNS-73-57 7 .

This preliminary notification constitutes EARLY notice of events of POSSIBLE '

national security or public interest significance. The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff as of this date.

FACILITY: Comanche Peak Steam Electric Station, Units 1 & 2 Texas Utilities Generating Company (DNs 50-445 and 50-446)

Somerville, Texas

SUBJECT:

Explosion at Reactor Construction Site At 7:30 p.m. on November 26, 1978, the TUGC0 Plant Superintendent, Operations, notified RIV (Arlington) of an explosion in the Common Auxiliary Building in a Brown and Root QC/ Craft field office. He stated that the explosion, caused by an explosive device', occurred at approximately 4:30 p.m. on November 26, 1978. He further stated that the explosion destroyed a file cabinet but there had been no structural damage to the building, no fire and no one had been injured.

9 'The licensee notified the local sheriff's cffice and a bomb squad from Waco, Texas was alerted.

The Resident Inspector called the RIV office at 7:45 a.m. on November 27, ,

/

1978, to report later findings. He reported, that according to the l

B&R Project Manager and the TUGC0 Resident Manager, the explosion had been caused by a leaking butane bottle. The leaking bottle and several other bottles were stored in Room #168 of the Common Auxiliary Building on the Unit No. 2 side. An explosive concentration resulted from the d(7 leakage and was apparently ignited by temporarily rigged quartz halide lights..  :

The Dallas office of the FBI was notified on November 26, 1978, and the local Bureau of Alcohol, Tobacco and Firearms was notified on November 27, 1978, by the RIV staff. Both were apprised of the later findings on November 27, 1978.

No press release was made or is planned by the licensee or the NRC.

The site construction progress is currently reported as 60 percent completed. There is no SNM on site.

I The IAT was notified.

~

(Continued)

J 9806150323 781127 PDR l I&E l PNS-78-37 PDR M n w y.,. , - py ,,,

, ,y,,, 7

,.m.mg.,,r m y c vv4 ..~

,ni=y

1%

i*

l Prelimnary Notification i PN5-78-57 l k November 27, 1978 l Continued -

Contact:

NErvin, IE x28080, DChapell, IE x 28080 EMHoward IE x 27650 l

Distribution: Transmitted H St /.'.l f Chairman Hendrie Cormiissioner Bradford S. J. Chilk, SECY Commissioner Kennedy Commissioner Ahearne C. C. Kammerer, CA Commissioner Gilinsky (ForDistribution)

Transmitted: MNBB /,'26 P Bldg /.'27 IE L. V. Gossick, EDO H. R. Denton, NRR J. G. Davis Region g , //J,2.

S. H. Hanauer, ED0 R. C. DeYoung, NRR J. J. Fouchard, PA R. J. Mattson, NRR N. M. Haller, MPA V. Stello, NRR (MAIL)

R. G. Ryan, OSP R. S. Boyd, NRR J. J. Cummings, 0IA H. K. Shapar, ELD R. Minogue, SD C. V. Smith, NMSS w ,

l

l. -

L _

1 PRELIMINARY NOTIFICATION

[

p - - --

U________________________

~m. , . . . . ,,.,-, m _._ - - . --~_.m.--..- -" ~ "~'m3 b