ML20238A072

From kanterella
Revision as of 06:21, 24 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises of Results of Review of 870226 Response to Violations Noted in Insp Repts 50-348/86-25 & 50-364/86-25. Violations Occurred as Stated.Addl Response to 870126 Notice of Violation Requested within 30 Days of Ltr Date
ML20238A072
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/31/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
References
TAC-65399, NUDOCS 8709090118
Download: ML20238A072 (2)


See also: IR 05000348/1986025

Text

_ ___ - . -

.

<

g

AUG S1IGN i

1 \

{

Alabama Power Company

JTTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291-0400

Gentlemen:

SUBJECT: REPORT NOS. 50-348/86-25 AND 50-364/86-25

We have completed'our review of your response of February 26, 1987, to our

' Notice of Violation (NOV) issued on January 26, 1987. In your response you

confirm the actions -identified in the NOV but deny that these actions violate

the requirements of 10 CFR 50, Appendix J. The NRC position in this matter has

not changed: specifically, 10 CFR 50 Appendix J requires that, for any repairs

or adjustments performed on the containment boundary prior to the Type A test

which have a potential to change the leak rate across that boundary, local  ;

leak rate measurements must be made and any change in the leak rate used to i

adjust the Type A test result to obtain the "as found" leakage condition.

We conclude that the v1olation is correct as issued.

Accordingly, please provide an additional response to the Notice of Violatio.n

pursuant to the provisions of 10 CFR 2.201 to this Office within 30 days of i

the date of this letter.

Should you have any questions concerning this letter, please contact Frank Jape.

Sincerely, '

i

OPJG!NA!. SIGNED BYi

J. NELSON GRACE l

J. Nelson Grace

Regional Administrator

cc: Wr O. Whitt, Executive Vice President

g& D. Woodard, General Manager - l

Nuclear Plant

K G. Hairston, III, General Manager -

Nuclear Support

0:' W. McGowan, Manager-Safety Audit 1

and Engineering Review ]

J.' K. Osterholtz, Supervisor-Safety

Audit and Engineering Review

bec: (See page 2)

8709090118 870031

PDR ADOCK 0500'1348

G PDR

0

E-________________ _ _ - -

    1. /

_ _ _ - .

AUG 311967 f

!

I

Alabama Power Compeny 2

bec: NRC Resident Inspector

,5( Reeves, Project Manager, NRR

Document Control Desk 3

State of Alabama 1

1

l

J

!

4

-

t

RII /)t)

lhitener:er

RII 9/-/

FJap6 '

lbh

-

- erdt

'

0

RMs

-

AGib on

/

W

Eg/87 08/A u 87 /4 /87 08/L(/87

RII RI ,

hl'

7)

DVerrelli Jenk hs ML[rnt

08/q87 08/yg/87 68/ /7

1

l

l

l

'

w. .. ,

l

.

!

l

\

Ln

in

CO

e

?T

ce to

% 8

en W, ca.

D cn

n

E.

.

- - -

. --_ _ - . _ _ _ _ _ . . _ . _ . _ _ _ _ _ _ _ _ _ _ _