ML20212A146

From kanterella
Revision as of 22:04, 21 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-206/87-01,50-361/87-01 & 50-362/87-01 on 870116-30.No Violations or Deviations Noted
ML20212A146
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 02/23/1987
From: Wenslawski F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Baskin K
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20212A152 List:
References
NUDOCS 8703030296
Download: ML20212A146 (2)


See also: IR 05000206/1987001

Text

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

c .

, FEB 2 31987

,

.

- .

,

Docket Nos. 50-206, 50-361, and 50-362

Southern California Edison Company

P. O. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention: Mr. Kenneth P. Baskin, Vice President

Nuclear Engineering, Safety and Licensing Department

Gentlemen-

Subject: NRC Inspection {

-

This refers to the inspection conducted by Ms. G. M. Good and Mr. W. K.

TenBrook of this office on January 26-30, 1987, of activities authorized by

NRC License Nos. DPR-13, NPF-10 and NPF-15, and to the discussion of our

findings held by Ms. Good with Mr. H. E. Morgan and other members of your

staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

No significant deficiencies or violations of NRC requirements were identified

within the scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

)

U10

oOb0 "hWlyf( m.oo:?au

unou

.

l'DN

rN

D ( / GP

-__ _ - _ _ _-_ _____ _ ___ _____--_______ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ - _ - _ _ _ _ _ - _ _ - _ _ _ _ - _ _ _ _

. .

'

FEB 2 31987

-2-

'

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely,

cninal cry.1 :y

r. A woe r

F. A. Wenslawski, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosure:

<

Inspection Report Nos. 50-206/87-01, 50-361/87-01,

and 50-361/87-01

cc w/ enclosure:

D. J. Fogarty, SCE

H. B. Ray, SCE

H. E. Morgan, SCE (San Clemente)

State of CA

D. Matthews, EPB:IE

F. C. Jackley, NA&EP, SCE

D. Peacor, SCE~

S. Elkins, FEMA, Region IX

.

bec w/ enclosure:

RSB/ Document Control Desk (RIDS)

Project Inspector

Resident Inspector (2)

G. Cook

B. Faulkenberry

J. Martin

bec w/o enclosure:

LFM8

Region V

RE ~ EST COPY ] REQUEST Y ] REQUEST Y]

[ VES

[( QUEST

)/ N0 COPY

] YES ]/ NO ] YES / 0 ] YES / N0

~

6hi(*

GMGood/ norma

M*M

WKTen3 rook

h.

RFFish FAwenslawskipe/

]

2/2G87 2/p/87 2/20/87 2fdO/87