ML20212A534

From kanterella
Revision as of 20:32, 21 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-346/86-14 on 860501-0615.No Violation Noted
ML20212A534
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/23/1986
From: Guldemond W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Williams J
TOLEDO EDISON CO.
Shared Package
ML20212A539 List:
References
TAC-60875, NUDOCS 8607290067
Download: ML20212A534 (2)


See also: IR 05000346/1986014

Text

_ _ _ _ _ ____ _____ ________ - ____ _ _ -____ -

p m(d

,

.

Docket No. 50-346 JUL 2 3 1986

Toledo Edison Company

ATTN: Mr. Joe Williams, Jr.

Vice President

Nuclear

Edison Plaza

'

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. P. Byron and

D. Kosloff of this office on May 1,1986 through June 15, 1986, of activities

at Davis-Besse Nuclear Power Station authorized by NRC Operating License

No. NPF-3 and to the discussions of our findings with Mr. L. Storz at the

l

conclusion of the inspection.

,

The enclosed copy of our inspection report identifies areas examined during

.

'

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL-96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

bY < '

W. G. Guldemon , Chief

Projects Branch 2

Enclosure: Inspection Report

No. 50-346/86014(DRP)

See Attached Distribution j y

RIII RIII RIII

'

s be Guldemand

M

g

f

8607290067 860723 6

reR ADOCK 0500

. I( MI

__ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

'

Toledo Edison Company 2

Distribution

cc w/ enclosures:

L. Storz, Plant Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Harold W.-Kohn, Ohio EPA

James W. Harris, State of Ohio

Robert H. Quillin, Ohio

Department of Health