Forwards Insp Repts 50-498/86-40 & 50-499/86-40 on 861128- 870130.No Violations or Deviations Identified
ML20207S448
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/16/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20207S449 List:
References
NUDOCS 8703190469
Download: ML20207S448 (2)


See also: IR 05000498/1986040

Text

,

7

. .

FAR16 27

In Reply Refer To:

Dockets: 50-498/86-40

50-499/86-40

Houston Lighting & Power Company

ATTN: J. H. Goldberg

Group Vice President, Nuclear

P. O. Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted by Messrs. C. E. Johnson and

D. L. Garrison of this office during the period November 28, 1986, through

January 30, 1987, of activities authorized by NRC Construction Permits CPPR-128

and 129 for the South Texas Project, Units 1 and 2, and to the discussion of

our findings with Mr. J. T. Westermeier and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection included site tours, licensee action on

previously reported items, safety-related components, safety-related pipe

support and restraint systems, safety-related piping, welder qualification,

reactor coolant pressure boundary piping record review, 10 CFR Part 21

reporting, and safety-related structural steel. Within these areas, the j

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the NRC inspectors.

The inspection findings are documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 3 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Or!a!nal Signed By

J. E. Gas!!ardO

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosure: (see next page)

RIV:SRh[ PB/k

DEGarrison

RPB/

RGTaylor

B/

ndy

RP/d

nstable

C:RPB

JEGagl}//h

rdo

[CEJohnson/lr

/ J/h /87 .

3/ 4 /87 3/h /87 $/I,/87 //l /87

3 /; 8

4

i

8703190469 870316

PDR ADOCK 05000498

C PDR

,_.

-

., .,

Houston Lighting &' Power Company - 22-

Enclosure:

Appendix - NRC Inspection Report

50-498/86-40

50-499/86-40

cc w/ enclosure:

Houston Lighting & Power Company

ATTN: M. Wisenberg, Manager,

Nuclear Licensing

'P. O. Box 1700

Houston, Texas 77001

Texas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • RPB DRSP
  • RRI-0PS R. D. Martin, RA
  • RRI-CONST. *Section Chief (RPB/C)
  • R&SPB * MIS System
  • RIV File *D. Weiss, RM/ALF
  • RSTS Operator R. Pirfo, ELD
  • R. G. Taylor, RPB/C *RSB
  • Project Inspector *R. Hall
  • w/766

..