MONTHYEARML20062B4761990-09-30030 September 1990 Monthly Operating Rept for Sept 1990 for LACBWR ML20248D0941989-08-31031 August 1989 Monthly Operating Rept for Aug 1989 for LACBWR ML20245G6571989-07-31031 July 1989 Monthly Operating Rept for Jul 1989 for LACBWR ML20245F9681989-06-30030 June 1989 Monthly Operating Rept for June 1989 for LACBWR ML20245F8241989-02-28028 February 1989 Monthly Operating Rept for Feb 1989 for La Crosse Bwr.W/ ML20245F7771989-01-31031 January 1989 Monthly Operating Rept for Jan 1989 for LACBWR ML20205T1271988-10-31031 October 1988 Monthly Operating Rept for Oct 1988 for La Crosse Bwr.W/ ML20236W3491987-08-31031 August 1987 Monthly Operating Rept for Aug 1987 ML20237K4631987-05-31031 May 1987 Monthly Operating Rept for May 1987 ML20237K3861987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20237K9211987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20237K3571987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20205C3651987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20212P1591986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20211Q0611986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20212L9291986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20207F7821986-09-30030 September 1986 Monthly Operating Rept for Sept 1986.W/861008 ML20212C6201986-08-31031 August 1986 Monthly Operating Rept for Aug 1986 ML20215D6881986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 ML20214M5081986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20205D6021986-05-31031 May 1986 Monthly Operating Rept for May 1986 ML20207B9911986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20211H0211986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20197D2831986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20203E1251986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20154S5751985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20137U3701985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20141F2791985-10-31031 October 1985 Monthly Operating Rept for Oct 1985 ML20138B5551985-09-30030 September 1985 Monthly Operating Rept for Sept 1985 ML20138R3801985-08-31031 August 1985 Monthly Operating Rept for Aug 1985 ML20132H2181985-07-31031 July 1985 Monthly Operating Rept for Jul 1985 ML20135B4101985-06-30030 June 1985 Monthly Operating Rept for June 1985 ML20133H5351985-05-31031 May 1985 Monthly Operating Rept for May 1985 ML20132E1571985-04-30030 April 1985 Monthly Operating Rept for Apr 1985 ML20129H0921985-03-31031 March 1985 Monthly Operating Rept for Mar 1985 ML20062G2521982-07-0707 July 1982 Monthly Operating Rept for June 1982 ML20062G3201982-06-0404 June 1982 Revised Monthly Operating Rept for May 1982 ML20054F1851982-06-0404 June 1982 Monthly Operating Rept for May 1982 ML20062G3101982-05-0505 May 1982 Revised Monthly Operating Rept for Apr 1982 ML20125D2861980-01-0202 January 1980 Monthly Operating Rept for Dec 1979 ML20062E7911978-12-0606 December 1978 Monthly Oper Rept for Nov 1978 ML20062A2951978-10-0505 October 1978 Monthly Oper Rept for Sept,1978 1990-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20210A6361999-04-30030 April 1999 Rev 13 to Quality Assurance Program Description ML20206J3751999-04-29029 April 1999 Rev 13 to QA Program Description ML20207A9591999-01-31031 January 1999 Revised LACBWR Decommissioning Plan ML20196G0751998-12-31031 December 1998 1998 Annual Rept for Dairyland Power Cooperative ML20204D8371998-12-31031 December 1998 Annual Rept for 1998 - Rept of Changes,Tests & Experiments for Lacbwr. with ML20237E2701998-07-31031 July 1998 Rev 12 to QA Program Description ML20196A9241998-07-31031 July 1998 Rev 12 to LACBWR QA Program Description (Qapd) ML20202J0691998-01-31031 January 1998 Revised LACBWR Decommissioning Plan ML20202J0781998-01-31031 January 1998 Revised LACBWR Initial Site Characterization Survey for Safstor ML20203K0041997-12-31031 December 1997 Annual Operating Rept for 1997 - Rept of Changes,Tests & Experiments ML20249B7101997-12-31031 December 1997 Navigating for Our Future Dairyland Power 1997 Annual Rept. W/O Ltr ML20138B7771997-04-25025 April 1997 Corrected Page 8 of SE for Amend 69 to La Crosse Boiling Water Reactor License ML20137R7731997-04-11011 April 1997 Safety Evaluation Approving Changes to QAP Description ML20149K2071996-12-31031 December 1996 Conquering New Frontiers,Dairyland Power Cooperative 1996 Annual Rept ML20135C3901996-12-31031 December 1996 Annual Rept for 1996 - Rept of Changes,Tests & Experiments ML20132F8721996-10-31031 October 1996 Revised LACBWR Decommissioning Plan ML20134M2531996-02-20020 February 1996 Revised Rev 11 to QA Program Description ML18012A9001995-12-31031 December 1995 Annual Rept - 1995 of Changes,Tests & Experiments. W/ 960220 Ltr ML18011B1461995-04-20020 April 1995 LER 95-001-00:on 950417,noted That HPSW to Containment Building Isolated.Caused by Momentary LOP Due to Operational Test of 1A Edg.Procedures for Test Being Modified to Include Instructions to Verify Value Being open.W/950420 Ltr ML20056E2631993-08-10010 August 1993 LACBWR Containment Bldg Structural Analysis. W/One Oversize Drawing ML20056E2621993-07-31031 July 1993 Nonproprietary Analysis of Potential Blast Effects on LACBWR Reactor Bldg Due to 16 Inch Natural Gas Pipeline Failure,Suppl Analysis for Fast Closing Valve ML20127D3901993-01-13013 January 1993 SE Supporting Amend 67 to License DPR-45 ML20128K6011992-12-31031 December 1992 Corrected App a Re Std Format for Reporting Number of Personnel & man-rem by Work & Job Function,To Annual Rept for 1992 - Rept of Changes,Tests & Experiments ML20128D3421992-12-31031 December 1992 LACBWR Annual Rept 1992 ML20062B4761990-09-30030 September 1990 Monthly Operating Rept for Sept 1990 for LACBWR ML20248D0941989-08-31031 August 1989 Monthly Operating Rept for Aug 1989 for LACBWR ML20245G6571989-07-31031 July 1989 Monthly Operating Rept for Jul 1989 for LACBWR ML20245F9681989-06-30030 June 1989 Monthly Operating Rept for June 1989 for LACBWR ML20245J7351989-04-26026 April 1989 Safety Evaluation Supporting Amend 65 to License DPR-45 ML20245F8241989-02-28028 February 1989 Monthly Operating Rept for Feb 1989 for La Crosse Bwr.W/ ML20235S2441989-02-16016 February 1989 Suppl to 880104 Special Rept Re Inoperability of High Pressure Svc Water Diesel 1B.Fuel Supplu Sys Was Source of Problem.Fuel Supply Sys Will Be Replaced W/Above Ground Tanks for Both Diesels ML20245F7771989-01-31031 January 1989 Monthly Operating Rept for Jan 1989 for LACBWR ML20246H8771988-12-31031 December 1988 1988 Dairyland Power Cooperative Annual Rept ML20205T1271988-10-31031 October 1988 Monthly Operating Rept for Oct 1988 for La Crosse Bwr.W/ ML20151T0991988-08-0808 August 1988 Safety Evaluation Supporting Approval of Util Rev 10 to Emergency Plan ML20150D7051988-07-0808 July 1988 Safety Evaluation Supporting Rev 10 to Emergency Plan ML20155F9161988-05-31031 May 1988 Safety Evaluation Supporting Amend 62 to License DPR-45 ML20151G0591988-04-11011 April 1988 Safety Evaluation Supporting Amend 60 to Provisional License DPR-45 ML20148C3941988-03-15015 March 1988 Safety Evaluation Supporting Amend 59 to License DPR-45 ML20149G0711988-01-0404 January 1988 Safety Evaluation Supporting Amend 58 to License DPR-45 ML20147A9731987-12-31031 December 1987 Decommissioning Plan ML20149J3441987-12-31031 December 1987 LACBWR Annual Rept 1987 ML20195D7811987-12-31031 December 1987 1987 Dairyland Power Cooperative Annual Rept ML20237C6781987-11-30030 November 1987 Special Rept:On 871118,internal Portion of Fire Suppression Water Sys Removed from Svc to Replace Section of Piping.On 871120,piping Successfully Hydrostatically Tested & Fire Suppression Sys Returned to Svc ML20236W2731987-11-23023 November 1987 Special Rept:On 871028,following Initiation of 24 H Run for 18-month Diesel Generator Test,Emergency Diesel Generator 1B Stopped Running.No Cause for Trip Determined.Procedure Will Be Revised So Alarm Conditions Tested Before Run ML20236X0081987-11-18018 November 1987 Special Rept Re Inoperability of Fire Suppression Water Sys. Internal Portion of Sys Removed from Svc on 871118 to Replace Section of Piping.Initially Reported on 871118.Plant Permanently Shut Down & Reactor Defueled ML20234C3931987-10-20020 October 1987 Rev 5 to QA Program Description ML20151B2351987-10-20020 October 1987 Revised Rev 5 to QA Program Description ML20235R0531987-09-30030 September 1987 Determination of Potential Radiological Consequences to Members of Public from Fuel Handling Accident at La Crosse Nuclear Facility ML20235B5711987-09-15015 September 1987 Safety Evaluation Supporting Amend 57 to License DPR-45 1999-04-30
[Table view] |
Text
_ - _
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE May 1986 At the onset of the May reporting period, the plant was in the refueling outage which commenced March 7, 1986. At 1841 on May 6, the reactor was taken critical and startup testing commenced. At 2015 on May 6, the reactor was manually shutdown due to a malfunction on the lower control rod drive mechanism in position No. 3.
At 1822 on May 7, the reactor was taken critical. At 0028 on May 8 the reactor scrammed from low power due to a spike on Nuclear Instrumentation (NI)
Channel No. 5. The instrument drawer was replaced. The reactor was taken critical at 0652 on May 8. At 0843 on May 9, the reactor scrammed from low power due to a spike on NI Channel No. 5. The spiking was determined to be due to the positive high voltage power supply. The power supply was replaced.
At 1520 on May 9, the reactor was again taken critical.
At 0231 on May 10, the reactor was manually shutdown from low power due to a lagging fire in the IB Forced Circulation Pump cubicle. The fire was extinguished within 9 minutes. At 2001 on May 10, the reactor was taken t critical.
At 0702 on May 13, the reactor scrammed from low power due to failure of the 1A Static Inverter. A circuit board in the inverter was replaced. The reactor was taken critical at 1345 on May 14.
At 1202 on May 15, the reactor was manually shutdown from low power due to water leakage from the upper flange of Upper Control Rod Drive Mechanism No.
- 2. Flange bolts were tightened and the leakage stopped. The reactor was taken critical at 1512 on May 15. The turbine-generator was connected to the DPC grid at 0607 on May 16, thus ending the 1986 refueling outage.
At approximately 1220 on May 25, the 1A Forced Circulation Pump (FCP) tripped due to loss of seal inject flow. Reactor power decreased from 78% to 47%.
The seal inject supply valve to the 1A FCP closed due to water in its controller regulator and E/P converter. The reactor was manually shutdown at j 2045 on May 25, to drain water from the control air system, mainly from valve l regulators associated with the seal inject system.
I l At 0020 on May 27, the reactor was taken critical and at 1533, the turbine-generator was synchronized to the DPC grid. A slow power escalation was conducted, with approximately 83% being reached by the end of the May reporting period.
In addition to the work discussed above, major safety-related maintenance performed during the month of May included capping an unused reactor vessel water level probe connection which leaked during hydrostatic tests, installation of lower control rod drive mechanisms, and replacement of the personnel airlock inner door upper shaft seal. The following Type B and C leakage tests were conducted during May. All tests passed.
8608180103 ADOCK h o PDR409 IEN PDR l(i l R
- - . . - . . . - - - . . , - . . ,- - - ~ - . _ - - -- ----- .-. .-- -, - - -
Test Leakage (SCFH)
Personnel Airlock (post-maintenance tests) 15.03 7.89 6.76 0
Retention Tank Pump Discharge Valve 0.72
4 OPERATING DATA REPORT DOCKET No. 50-409 DATE 06/06/86 COMPLETED BY Loree Malin TELEPHONE 608-689-2331 OPERATING STATUS NOTES:
~1. Unit Name: La Crosse-Boiling Water Reactor
- 2. Reporting Period: 0000, 05/01/86 to 2400, 05/31/86
- 3. Licensed Thermal Power (MWt ): ~ 165
- 4. Nameplate Rating (Gross MWe ): 65.3
- 5. Design Electrical Rating (Net MW e): 50
- 6. Maximum Dependable capacity (Gross MWe ): 50
- 7. Maximum Dependable Capacity (Net MWe ): 48
- 8. If Changes Occur in Capacity Ratings (Items 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MW e):
- 10. Reasons for Restrictions, If Any:
l l
l This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744 3,623 145,346 l 12. Number Of Hours Reactor Was Critical 491.2 1,832.0 97,912.9 i 13. Reactor Reserve Shutdown Hours 0 0 478 14.. Hours Generator On-Line 335.1 1,625.0 91,125.9 i
- 15. Unit Reserve Shutdown Hours 0 0 79 l 16. Gross Thermal Energy Generated (MWH) 37,590.7 213,816.2 12,672,778 8
- 17. Gross Electrical Energy Generated (MWH) 11,195 66,021 3,805,230 l
- 18. Net Electrical Energy Generated (MWH) 9,913 60,252 3,528,997
- 19. Unit Service Factor 45.0 44.2 62.7 I
- 20. Unit Availability Factor 45.0 44.9 62.8
- 21. Unit Capacity Factor (Using MDC Net) 27.8 34.7 50.6
- 22. Unit Capacity Factor (Using DER Net) 26.7 33.3 48.6
- 23. Unit Forced Outage Rate 11.3 17.1 9.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None l
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: NA
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved i INITIAL CRITICALITY l INITIAL ELECTRICITY COMMERCIAL OPERATION i
WP-6.8 i
. , _ . - . _ _ . . . _ . , - - _ , , ~ , - , ,.____,...-.,____-,,_m, , ,,....._m -_ __._..m._,_ _m_.,...__.,,_,-,.___,,m. . _ _ .
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-409 UNIT LACBWR DATE 06/06/86 COMPLETED BY L.S. Goodman TELEPHONE 608-689-2331 MONTH May 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 26 2 0 18 31 3 0 19 34 4 0 20 33 5 0 21 33 6 0 22 33 i
7 0 23 34 8 0 24 36 9 0 25 26 10 0 26 0 11 0 27 4 l
12 0 28 26 r
13 0 29 35 14 0 30 38 15 0 31 39 16 8 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
WP-6.8
UNIT SHUTDOWNS AND POWER REDUCTIONS ,
DOCKET NO. 50-409 UNIT NAME LACBWR DATE 06/06/86 REPORT MONTH MAY 1986 COMPLETED BY L.S. Goodman TELEPHONE 608-689-2331 Method of Licensee Cause & Corrective Duration Shutting Down Event System Component Action to No . Date Type l (Hours) Reason 2 Reactor 3 Report # Code 4 Code 5 Prevent Recurrence 86-04 03-07-86 S 366.1 C 3 86-06 EB CKTBRK Refer to March 1986 report for the discussion of the scram which occurred during the shutdown for this re-fueling outage. The refueling outage continued during the month of April.
86-05 05-25-86 F 0 A 4 NA CB PUMPXX Power was decreased from 78%
to I.7% when the 1A Forced Circulation Pump tripped due to loss of seal inject flow.
The seal inject supply valve closed due to water in its controller regulator and E/P converter.
86-06 05-25-86 F 42.8 A 1 NA PA INSTRU The reactor was shutdown in order to drain water from the control air system, s pecifi-cally from the regulators associated with seal inject system valves. -
1 2 3 4 Reason: Method: Exhibit G-Instructionse F: Forced A-Equipment Failure (Explain) 1-Manual for Preparation of Data S: Scheduled B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain) (NUREG-0161)
E-Operator Training & License Examination F-Administrative 5 G-Operational Error (Explain) Exhibit 1 - Same Source H-Other (Explain)
0 ,
l 17 stLf )%f S [M COOPERAT/VE
- P.O BOX 817 2615 EAST AV SOUTH
- LA CROSSE. WISCONSIN S4601 June 6, 1986 (608) 788 4 000 In reply, please refer to LAC-11654 DOCKET NO. 50-409 Of fice of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555
SUBJECT:
DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)
PROVISIONAL OPERATING LICENSE NO. DPR-45 MONTHLY OPERATING DATA REPORT FOR MAY 1986
Reference:
(1) NRC Letter, Reid to Madgett, dated September 19, 1977.
(2) NRC Letter, Reid to Madgett, dated December 29, 1977 Gentlemen:
In accordance with instructions contained in Reference (1) and Technical Specification Amendments contained in Reference (2), we are submitting information concerning operability and availability of the La Crosse Boiling Water Reactor (LACBWR) for the Month of May 1986.
Please contact us if there are any questions concerning this report.
Very truly yours, DAIRYLAND POWER COOPERATIVE James W. Taylor, General Manager JWT:LSG:sks cc: J. G. Keppler, Regional Administrator, NRC-DRO III John Stang, LACBWR Project Manager NRC Resident Inspector D. Sherman ( ANI Library)