IR 05000139/1986001

From kanterella
Revision as of 06:35, 28 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Partially Withheld Safeguards Insp Repts 50-139/86-01 & 50-139/86-02 on 860602-03 (Ref 10CFR2.790).No Violation or Deviation Noted.Major Areas Inspected:Plans,Procedures & Reviews & Fixed Site Physical Protection of SNM
ML20206R738
Person / Time
Site: 05000139
Issue date: 06/26/1986
From: Schuster M, Wieder A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML19292F533 List:
References
50-139-86-01, 50-139-86-02, 50-139-86-1, 50-139-86-2, NUDOCS 8607070213
Download: ML20206R738 (1)


Text

s .

EMERIAl. IRRit3MITTE0 ntPrwTi h,N7Ak

- ltEl NORMA 00s The information on this page is considered to be appropriate for public disclosure. pursuant to 10 CFR 2.79 '

U. S. NUCLEAR REGULATORY COMMISSION

.

REGION V

Report N /86-01/86-02 (IE-V-757)

Docket N License N R-73 Licensee: University of Washington College of Engineering, Loew Hall FH10 Seattle, Washington 98195

.

Facility Name: University of Washington Nuclear Reactor Inspection at: Seattle, Washington Inspection Conducted: June 2 and 3, 1986

.,

Date of Last Material Control and Accounting Inspection:- January 9-10,,1978 Date of Last Physical Security Inspection: April 24, 1984-Type of Inspection: Unannounced Physical Security and Material Control and Accounting, Safeguards

'

Inspector: ,/)t)O b y[ Td A. V. Wieder, Safeguards Auditor Date Signed Approved by: MFJ O . c[' (,,/a4/f8 ,

M. D. Schuster, Chief, Safeguards Section Date Signed Inspection Suvunary:

Areas Insrected: Plans, Precedures, and Reviews; Fixed Site Physical -

Protection'of Special Nuclear Material'of Moderate Strategic Significance, .

'

Material Control and Accounting - Reactors. During this inspection, Inspection Procedures 81401, 81402, 81403, 81421.-'81810.-and 85102 were followe Results:- The licensee was found to be in compliance with NEC requ rements within the areas examined during this-inspectio ,

e EEUl TRAMMITIE0 HERPG cngrAg* ,

.]]90l!@PJiaMgg ,

a

.

"

A .

,

G