ML20207J908

From kanterella
Revision as of 23:01, 22 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests Fr Publication of Notice of Consideration of Issuance of Amend to License DPR-34 & Proposed NSHC Determination & Opportunity for Hearing on 861205 Request Re Tech Spec Description of Nuclear Operations Organization
ML20207J908
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 01/06/1987
From: Berkow H
Office of Nuclear Reactor Regulation
To:
NRC
References
TAC-56743, NUDOCS 8701080657
Download: ML20207J908 (3)


Text

I 1

[? UNITED STATES y

g( g ,

NUCLEAR REGULATORY COMMISSION E WASHINGTON, D. C. 20555 k, [ 2[

January 6, 1987 Docket No. 50-267 MEMORANDUM FOR: Sholly Coordinator FROM: Herbert N. Berkow, Director Standardization and Special Pro,iects Directorate Division of PWR Licensing-B

SUBJECT:

REQUEST FOR PUBLICATION IN BIWEEKLY FR NOTICE - NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE AND PROPOSED N0 SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION AND OPPORTUNITY FOR A HEARING Public Service Company of Colorado, Docket No. 50-267, Fort St. Vrain Nuclear Generating Station, Platteville, Colorado Date of amendment request: December 5, 1986 Description of amendment request: The proposed amendment updates the Technical Specifications description of the Nuclear Operations organization for Public Service Company of Colorado. These proposed changes do not directly affect plant operation. These proposed changes involve the Nuclear Facility Safety Committee and eliminate references to the Security

- Committee. These proposals supplement the licensee's submittal dated July 22, 1986, which was noticed on October 8, 1986 at 51 FR 36103.

Basis for proposed nc significant hazards consideration determination:

Since the proposed changes to Sections 7.1 and 7.4 of the Fort St.

Vrain Technical Specifications are administrative in nature, no significant safety hazards considerations are involved. Operation of Fort St. Vrain in accordance with the proposed changes will not: 1) involve a significant increase in the probability or consequences of an accident previously evaluated, 2) create the possibility of a new or different kind of accident from any accident previously evaluated, or 3) involve a significant reduction in a margin of safety. These changes can be considered to come Nff, 7 P

i

v. -

( under example (i) of the examples provided by the Commission (51 FR 7751) of amendments that are considered not likely to involve significant hazards censiderations.

Local Public Document Room location: Greeley Public Library, City Complex Building, Greeley, Colorado Attorney for licensee: Bryant O'Donnell, Public Service Company of Colorado, P. O. Box 840, Denver, Colorado 80201-0840 NRC Project Director: Herbert N. Ber '

H b rt N. Berkow, Director Standardization 8 Special Projects Directorate Division of PWR Licensing-B cc: K. Heitner P. Noonan e

l I

1

}

, . ,, January 6, 1987 l

j

[ under example (i) of the examples provided by the Commission (51 FR 7751)

, of amendments that are considered not likely to involve significant hazards 1 considerations.

Local Public Document Room location: Greeley Public Library, City Complex

~

Building, Greeley, Colorado Attorney for licensee: Bryant O'Donnell, Public Service Company of Colorado, P. O. Box 840, Denver, Colorado 80201-0840 '

NRC Project Director: Herbert N. Berkow

original signed by i

Herbert N. Berkow, Director.

. Standardization & Special Projects Directorate Division of PWR Licensing-B:

cc: K. Heitner P. Noonan i

i a

. DISTRIBUTION:

. . Docket F11e;p-4 PBSS Reeding NRC PDR Local POR PNoonan KHeitner

Olynch' HBerkow OGC-BETH PBSS PBS <

gffB PI SS Pflo%V onan KHeitner:cw OL ch Hber i

11/f/87 01/7/87. 01/g /87 01/ /87

_ _ _ _ _ _ _ _ _ - _ _ _ _ _ ___ - _ - - - --