ML20066D308

From kanterella
Revision as of 16:03, 21 December 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
to Monthly Operating Rept for Jan 1981
ML20066D308
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/08/1982
From: Sarsour B
TOLEDO EDISON CO.
To:
Shared Package
ML20066D281 List:
References
NUDOCS 8211110276
Download: ML20066D308 (1)


Text

Revision 1 - 4/3/81 ,

Revision 2 - 1/8/82 OPERATING DATA REPOP.T DOCKET NO. 50-346 DATE .Tnm:ary 8.1982 CO5tPLETED BY Bilal Sarsour TELEPilONE (61 9) 259-5000, Extension 251 OPERATING STATUS Davis-Besse Unit 1 goge,

1. Unit Name:
2. Reporting Period: January, 1981
3. Licensed Thermal Power (\1Wt): 2772 ,
4. Nameplate Rating (Gro>s 31Wel:

925

5. Design Efectrical Rating tNet 5 We):

906

6. Slaximum Dependable Capacity (Gross .\lWe): 918
7. 51aximum Dependable Capacity (Net alWe). 874 S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
9. Power Lese!To which Restricted.If Any (Net >!We): -
10. Reasons For Restrictions. If Any:

This hionth Yr to.Date Cumulative 744 744 21,985

11. Elours in Reporting Period 134.0 134.0 10,216.6 -
12. Number Of Hours Reactor W . 2ritical
13. Reactor Resene Shutdown Hours 0 0 2,478.6
14. Ilours Generator On.Line 127.9 1 7.9 9,470.2
15. Unit Reserve Shutdown Hours 0 0 1,731.4
16. Gross Thermal Ener;y Generated (31WHJ 191,873 191,873 21,280,375 -

2

17. Gross Electrical Energy Generated (.\lWil) 62,434_ ,,, 62,434 7,089,587 51,729 51,729 6,585,578
18. Net Electrical Energy Generated (alWil)
19. Unit Senice Factor 17.2 17.2 43.1
20. Unit Asa:! ability Factor 17.2 17.2 50.9
21. Unit Capacity Factor (Using.\lDC Net) . 7.8 7.8 303
22. Unit Capacity FactoriUsing DER Net) 7.7 7.7 33.1
23. Unit Forced Outage Rate 82.8 82.8 28.3
24. Shutdowns Scheduled Oser Next 6 31onths (Type. Date.and Duration of Each1:
25. If Shut Down At End Of Report Period. Estimated Date of Startup February 3, 1981
26. Units in Test Status (Prior to Commercial Operation): Forecast - Achiesed INITI t L CRIT!CA Lil Y INITIAL ELECTRICITY CO\t%IERCI \ L Ol'ER ATION

~

8211110276 82010g '

DR ADOCK 05000346 gyj;7 3 PDR

___