ML20202F036
From kanterella
ML20202F036 | |
Person / Time | |
---|---|
Site: | River Bend |
Issue date: | 11/26/1997 |
From: | Glass C ENTERGY OPERATIONS, INC. |
To: | |
Shared Package | |
ML20202E876 | List: |
References | |
PROC-971126, NUDOCS 9712080205 | |
Download: ML20202F036 (287) | |
Similar Documents at River Bend | |
---|---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20210H2901999-07-30030 July 1999
[Table view]Proposed Tech Specs Pages,Extending Operation of RBS from Current Licensed Power Level of 2894 Mwt to Uprated Power Level 3039 Mwt ML20205P8701999-04-15015 April 1999 Proposed Tech Specs,Implementing Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long-term Solution ML20205L7321999-04-0808 April 1999 Proposed Tech Specs,Removing Notes That Refer to Specific Cycles,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits ML20206R9351999-01-12012 January 1999 Proposed Tech Specs Re Refueling Equipment Interlocks Required Actions ML20199C1881999-01-0808 January 1999 Revised Page 7 to Rev 13 of RBS Security Training & Qualification Plan ML20198E8091998-12-16016 December 1998 Proposed Tech Specs Pages Re Change to TS Safety Limit 2.1.1.2,changing Two Recirculation Loop MCPR Limit from 1.13 to 1.12 & Single Recirculation Loop MCPR Limit from 1.14 to 1.13 ML20196A1401998-11-20020 November 1998 Proposed Tech Specs Adding 3.10.9, Control Rod Pattern - Cycle 8, to Support Startup from Outage Planned for Early Dec 1998 ML20154H3691998-10-0808 October 1998 Proposed Tech Specs Implementing BWROG Enhanced Option I-A Reactor Stability Long Term Solution as Documented in NEDO-32339,Rev 1, Reactor Stability Long-Term Solution, Enhanced Option I-A ML20153H0311998-09-23023 September 1998 Proposed Tech Specs Changing Specific Gravity Acceptance Criteria for Div III Battery ML20153E8111998-09-22022 September 1998 Proposed Tech Specs Deleting License Conditions Associated with Transamerica Delaval,Inc EDGs ML20217J0951998-04-21021 April 1998 Proposed Tech Specs Bases Update Package for Revs Implemented Since Last Submittal Through Refuel Outage 7 ML20216F1941998-04-0909 April 1998 Proposed Tech Specs License Condition 2.C(13) Re Partial Feedwater Heating & Final Feedwater Temp Reduction RBG-44355, Cycle 8 Startup Physics Test Summary1998-01-19019 January 1998 Cycle 8 Startup Physics Test Summary ML20202F0361997-11-26026 November 1997 Rev 0 to IST Plan for Pumps & Valves Second Ten-Yr Interval ML20216E4861997-09-0505 September 1997 Proposed Tech Specs Re APRM Setpoints,Reactivity Anomalies & RPS Instrumentation ML20210K2131997-08-15015 August 1997 Proposed Administrative Changes to TS 2.1.1.2 W/Note to Indicate Operating Cycle for Which SLMCPR Value Has Been Approved & TS 5.6.5 W/Note Providing Link to Specific GE Documents Used in Approving SLMCPR Changes for Given Cycle ML20217J0481997-08-0505 August 1997 Proposed Tech Specs 2.1.1.2, Reactor Core (Safety Limits), Increasing Two Recirculation Loop MCPR Limit to 1.13 & Single Recirculation Loop MCPR Limit to 1.14 ML20151L6041997-07-31031 July 1997 Proposed Tech Specs,Requesting Approval of Change to TS 3.6.1.8, Penetration Valve Leakage Control Sys, for Upcoming Outage ML20196J7741997-07-30030 July 1997 Proposed Tech Specs Clarifying Surveillance Requirements 3.6.4.2.1 & 3.6.4.2.2 to Match Corresponding Changes to NUREG-1434 ML20134A7021997-01-20020 January 1997 Proposed Tech Specs to License NPF-47,enhancing Operation of Plant to Allow Operation at 100% Power W/Lower Core Flows & Use of Flow Control Spectral Shift Strategies to Increase Cycle Energy ML20133M0451997-01-10010 January 1997 Proposed Tech Specs 3.4.11 Re RCS Pressure & Temp Limits ML20140F0151996-12-26026 December 1996 Rev 6 to RSP-0008, ODCM Procedure ML20134M2271996-11-15015 November 1996 Proposed Tech Specs,Changing TS SL 2.1.1.2, Reactor Core (Sl), Which Increases Two Recirculation Loop MCPR Limit from 1.07 to 1.10 & Single Recirculation Loop MCPR from 1.08 to 1.12 ML20134M0151996-11-15015 November 1996 Proposed Tech Specs 3.8.1 Re AC Sources Operating ML20134M2061996-11-0606 November 1996 Proposed Tech Specs,Permitting Increase in Allowable Leak Rate for MSIVs & Deleting Penetration Valve Leakage Control Sys & Ms Positive Leakage Control Sys Requirements ML20129J4231996-10-24024 October 1996 Proposed Tech Specs 3.8.1 Re A.C. Sources - Operating ML20117K1071996-08-29029 August 1996 Proposed Tech Specs Re Reactor Vessel Matl Surveillance Program Capsule Withdrawal Schedule ML20117G7401996-08-29029 August 1996 Proposed Tech Specs 3.1 Re Reactivity Control Systems ML20116P1341996-08-0808 August 1996 Technical Requirements Manual ML20116J3151996-08-0707 August 1996 Proposed Tech Specs,Submitting TS Bases Pages for Revs Performed Since 951001 Approval of TS Bases ML20116L6321996-08-0101 August 1996 Proposed Tech Specs Re Primary Containment/Drywell Hydrogen Mixing Sys & Drywell Isolation Valves ML20113F2271996-06-12012 June 1996 Rev 0 to Calculation PI-0103-00203.002-101, Ampacity Derating Evaluation ML20117L2581996-06-0404 June 1996 Proposed Tech Specs Re Replacement Page for Ltr RBG-42764, Proposed Tech Specs 3.9.1 Re Refueling Equipment Interlocks1996-05-31031 May 1996 Proposed Tech Specs 3.9.1 Re Refueling Equipment Interlocks ML20112E7831996-05-30030 May 1996 Proposed Tech Spec 3.8.3 Re Incorporation of 5-start Air Pressure Design Criterion for Div III DG ML20117H3271996-05-20020 May 1996 Proposed Tech Specs Re Change in Co Name from Gulf States Utils Co to Entergy Gulf States,Inc B130180, Surveillance Specimen Program Evaluation for River Bend Station1996-04-30030 April 1996 Surveillance Specimen Program Evaluation for River Bend Station ML20107E4681996-04-18018 April 1996 Proposed Tech Specs Re Fuel Loading W/Control Rods Withdrawn or Removed from Defueled Core Cells ML20094N7741995-11-22022 November 1995 Proposed Tech Specs,Clarifying Info Contained in License Amend Request (LAR) 95-21 ML20094M8001995-11-20020 November 1995 Proposed Tech Specs Re Drywell Leak Rate Testing Requirements ML20094N0091995-11-20020 November 1995 Proposed Tech Specs Eliminating Selected Response Time Testing Requirements ML20094B0001995-10-26026 October 1995 Proposed Tech Specs,Consisting of Change Request 95-10, Deleting TS 5.5.12, Biofouling Prevention & Detection, & Various Editorial Corrections ML20093L7361995-10-24024 October 1995 Proposed Tech Specs 3.6.1.1 Through 3.6.1.3 Re Containment Sys ML20108B5941995-10-0101 October 1995 Rev 5A to River Bend Station Offsite Dose Calculation Manual Procedure ML20087J5451995-08-17017 August 1995 Proposed Tech Specs Re Engineered Safety Sys Which Responds to Fuel Handling Accident Conditions ML20084L5001995-05-30030 May 1995 Proposed Tech Specs,Allowing TS 3/4.6.2.2, Drywell Bypass Leakage, Tests to Be Performed at Intervals as Long as Five Yrs Based on Demonstrated Performance of Drywell Structure ML20084L4541995-05-30030 May 1995 Proposed Tech Specs Re Request for Exemption from App J, Primary Reactor Containment Leakage Testing for Water- Cooled Power Reactors ML20078M1171995-02-0808 February 1995 Proposed Tech Specs Page Re Secondary Containment Automatic Isolation Dampers ML20077S4401995-01-18018 January 1995 Revised Pages of Proposed Tech Specs Re Conversion to TS Based on NUREG-1434, Improved TS Rev 0 ML20078H0881994-11-10010 November 1994 Proposed Tech Specs Reflecting Clarifications to LAR 91-11 1999-07-30 Category:TEST/INSPECTION/OPERATING PROCEDURES MONTHYEARML20199C1881999-01-0808 January 1999
[Table view]Revised Page 7 to Rev 13 of RBS Security Training & Qualification Plan ML20202F0361997-11-26026 November 1997 Rev 0 to IST Plan for Pumps & Valves Second Ten-Yr Interval ML20140F0151996-12-26026 December 1996 Rev 6 to RSP-0008, ODCM Procedure ML20116P1341996-08-0808 August 1996 Technical Requirements Manual ML20113F2271996-06-12012 June 1996 Rev 0 to Calculation PI-0103-00203.002-101, Ampacity Derating Evaluation B130180, Surveillance Specimen Program Evaluation for River Bend Station1996-04-30030 April 1996 Surveillance Specimen Program Evaluation for River Bend Station ML20108B5941995-10-0101 October 1995 Rev 5A to River Bend Station Offsite Dose Calculation Manual Procedure ML20076K9161994-10-27027 October 1994 Updates to IST Pump & Valve Program Manual ML20059A8501993-12-23023 December 1993 Near-Term Performance Improvement Plan ML20128D9221993-01-29029 January 1993 Rev 6 to Pump & Valve Inservice Testing Plan for River Bend Station First 10-Yr Insp Interval ML20045E0311992-08-19019 August 1992 Change 92-01 to Rev 3 to RSP-0008, Odcm. ML20114D0711992-08-19019 August 1992 Rev 3 to Odcm ML20086G8411991-10-0202 October 1991 Rev 5 to Inservice Insp Plan for River Bend Station - Unit 1 ML20082M0061991-08-0909 August 1991 Rev 4 to RWS-0204, Radwaste Processing Control Program RBG-35-380, Rev 5B to River Bend Station Pump & Valve Inservice Testing Program Plan. Relief Requests Encl1991-07-26026 July 1991 Rev 5B to River Bend Station Pump & Valve Inservice Testing Program Plan. Relief Requests Encl ML20029B7841991-03-0606 March 1991 Station,Inservice Insp Plan,Summary Rept Refuel Outage RF-3 Second Period,First Interval, Vols 1 & 2 ML20070U7721991-02-26026 February 1991 Rev 4 to River Bend Station Inservice Insp Plan (First Interval) ML20245F0101989-04-24024 April 1989 Rev 2 to Offsite Dose Calculation Manual ML20114B7411989-03-0808 March 1989 Rev 5 to Procedure RWS-0304, Radwaste Handling & Control ML20245F0041989-02-14014 February 1989 Rev 3 to Offsite Dose Calculation Manual Procedure ML20154C9851988-08-16016 August 1988 Rev 3 to Inservice Insp-First Interval ML18053A7101988-03-22022 March 1988 Rev 5 to Pump & Valve Inservice Testing Plan,First 10 Yr Insp Interval. W/880422 Ltr ML20238C3651987-08-13013 August 1987 Rev 1 to Station Operating Procedure RSP-0008, Offsite Dose Calculation Manual Procedure RBG-26506, Rev 4 to Pump & Valve Inservice Testing Plan River Bend Station First 10-Yr Insp Interval. Fee Paid1987-07-29029 July 1987 Rev 4 to Pump & Valve Inservice Testing Plan River Bend Station First 10-Yr Insp Interval. Fee Paid ML20235Y0591987-07-16016 July 1987 Rev 2 to Radwaste Processing Control Program RBG-26044, Rev 2 to Inservice Insp Plan - First Interval1987-06-0202 June 1987 Rev 2 to Inservice Insp Plan - First Interval ML20114B7281987-05-14014 May 1987 Rev 3 to Procedure RWS-0307, Radwaste Segregation RBG-25841, Rev 0 to Procedure RSP-0008, River Bend Station,Offsite Dose Calculation Manual1987-04-30030 April 1987 Rev 0 to Procedure RSP-0008, River Bend Station,Offsite Dose Calculation Manual ML20114B7311987-03-16016 March 1987 Rev 2 to Procedure RWS-0207, Radwaste Shipping Criteria ML20209G3121987-01-0202 January 1987 Rev 3 to Pump & Valve Inservice Testing Plan,River Bend Station,First 10-Yr Insp Interval ML20214T6231986-09-11011 September 1986 Revised Emergency Plan Implementing Procedures,Including Rev 5 to EIP-2-007, Protective Action Recommendation Guidelines & Rev 4 to EIP-2-024, Offsite Dose Calculations Manual Method ML20214N6811986-08-0606 August 1986 Rev 2 to Pump & Valve Inservice Testing Plan,First 10-Yr Insp Interval ML20207E8711986-07-0202 July 1986 Vol 1 to Rev 1 to Pump & Valve Inservice Testing Plan,River Bend Station,First 10-Yr Insp Interval ML20206J1501986-06-20020 June 1986 Rev 4 to River Bend Station Unit 1,Preservice Insp Plan, Final Update ML20238C4141986-05-18018 May 1986 Rev to Nonradioactive Oil/Hazardous Matl Spill Prevention, Control & Countermeasure Plan ML20155G5391986-02-26026 February 1986 Station,Emergency Response Exercise Manual, Evaluated Exercise RBG-22-117, Rev 3 to Offsite Dose Calculation Manual1985-09-16016 September 1985 Rev 3 to Offsite Dose Calculation Manual ML20135A6331985-06-27027 June 1985 Revs to Nuclear Plant Engineering Preservice Insp/Pump & Valve Testing Plan, Replacing Pages 4 & 5 & App F RBG-21363, Rev 0 to Station Operating Procedure ADM-0053, Asiatic Clam Control Program1985-06-21021 June 1985 Rev 0 to Station Operating Procedure ADM-0053, Asiatic Clam Control Program ML20135A9211985-06-17017 June 1985 Rev 1 to OSP-0007, Preparation of Operations Sections Procedures ML20125D2751985-06-10010 June 1985 Updated Rev 1 to Nuclear Plant Engineering Preservice Insp/Pump & Valve Testing Plan ML20129E9531985-06-0606 June 1985 Rev 2 to Station Operating Procedure ADM-0022, Conduct of Operations ML20117P4831985-05-30030 May 1985 Rev 1 to Pump & Valve Inservice Testing Plan,River Bend Station,First 10-Yr Insp Interval RBG-21545, Rev 2 to River Bend Station Offsite Dose Calculation Manual1985-05-27027 May 1985 Rev 2 to River Bend Station Offsite Dose Calculation Manual ML20128E8881985-05-17017 May 1985 Revised Program Plan for Tdi Standby Diesel Generators ML20117P1431985-05-13013 May 1985 Rev 2 to Procedure COP-1050, Post-Accident Estimation of Fuel Core Damage RBG-21-165, Rev 1 to, River Bend Station Offsite Dose Calculation Manual1985-04-24024 April 1985 Rev 1 to, River Bend Station Offsite Dose Calculation Manual ML20129E9591985-03-27027 March 1985 Rev 1 to Station Operating Procedure AOP-0001, Reactor Scram ML20112G4641985-01-0707 January 1985 Offsite Dose Calculation Manual ML20112G4491985-01-0707 January 1985 Rev 0 to Procedure RWS-0204, Process Control Program 1999-01-08 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20202F036&oldid=3036899"