ML20204F036
From kanterella
ML20204F036 | |
Person / Time | |
---|---|
Site: | Mcguire, Palo Verde, Catawba, Saint Lucie, Three Mile Island, Summer, Diablo Canyon, Waterford, San Onofre, 05000000 |
Issue date: | 03/04/1983 |
From: | Eisenhut D Office of Nuclear Reactor Regulation |
To: | Ahearne, Asselstine, Gilinsky, Palladino N, Roberts NRC COMMISSION (OCM) |
Shared Package | |
ML20204E909 | List: |
References | |
FOIA-88-99, TASK-AS, TASK-BN83-027, TASK-BN83-27 BN-83-027, BN-83-27, NUDOCS 8303160760 | |
Download: ML20204F036 (11) | |
Similar Documents at Mcguire, Palo Verde, Catawba, Saint Lucie, Three Mile Island, Summer, Diablo Canyon, Waterford, San Onofre, 05000000 | |
---|---|
Category:BOARD NOTIFICATION (TO LICENSING BOARD OR LICENSING
MONTHYEARNUREG-1353, Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-13531989-05-0202 May 1989
[Table view]Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353 ML20245J2791989-05-0101 May 1989 Board Notification 89-002:informs of Staff Receipt of Info Re MP Acosta Use of Controlled Substances in Form of Unconfirmed Allegations.Info Provided to Ofc of Investigations.Delay of Hearing Unnecessary NUREG/CR-5176, Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants1989-02-14014 February 1989 Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants ML20207L8991986-12-23023 December 1986 Board Notification 86-025:forwards Safety Evaluation Rejecting Util Fracture Mechanics Methodology Used to Justify Tech Spec Change Request 148 Re Plugging Limits for once-through Steam Generator Tubes ML20197C9481986-12-10010 December 1986 Board Notification 86-023:forwarding IE Info Notice 86-098 Re Offsite Medical Svcs Pertinent to Contention in Plant Licensing Proceeding Concerning Adequacy of Arrangements ML20141N5691986-02-21021 February 1986 Board Notification 86-006:forwards Proposed Notice of Consideration of Issuance of Amend to License DPR-50 & Proposed NSHC Determination & Opportunity for Hearing Re 860204 Request to Modify Steam Generator Repair Criteria ML20136G3661985-11-21021 November 1985 Board Notification 85-090:forwards Tdi 851106 Part 21 Rept Re Potential Problem W/Emergency Diesel Generator Engine Intake & Exhaust Valve Springs Furnished by Betts Springs Co.Issue Resolved ML20136G3711985-11-21021 November 1985 Board Notification 85-091:submits Info Re Grand Gulf Tdi Emergency Diesel Generator Overspeed Condition on 851106. Probably Caused by Malfunction of Woodward Governor Mechanism.Damage Being Assessed & Evaluated ML20205B1521985-08-26026 August 1985 Board Notification 85-079:discusses Issuance of Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $64,000 Re Discrimination by Util,Per Director'S Decision DD-85-9 IR 05000277/19850111985-07-22022 July 1985 Board Notification 85-070:forwards Enforcement Action Notification Resulting from Insp Repts 50-277/85-11 & 50-352/85-12 Re Radiation Protection at Peach Bottom & Security at Limerick ML20128E1951985-05-28028 May 1985 Board Notification 85-059:forwards Financial Review of Gpu Operation of TMI-1.Util Has Reasonable Assurance of Obtaining Funds Necessary to Cover Estimated TMI-1 Operating Costs for Period of Licensing & Decommissioning ML20127D7251985-05-14014 May 1985 Board Notification 85-054:forwards Exam Repts 50-289/84-32 & 50-289/84-09 Re Operator Licensing Exams.Repts Indicate That Candidates Well Prepared for Written & Operational Exams ML20133P9301985-04-0202 April 1985 Board Notification 85-033:informs That in Order to Avoid Potential Limitations on Plant Readiness for Restart,Util Will Proceed to Plug All Tubes W/Eddy Current Indications Exceeding Tech Spec Plugging Limit ML20244C8141984-02-15015 February 1984 Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines IA-87-778, Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines1984-02-15015 February 1984 Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines ML20127B0801983-11-23023 November 1983 Board Notification 83-184:provides Addl Info on Steam Generator Repair Program & Requests Concurrence on Final No Significant Hazards Determination Re Operation W/Repaired Generators.Commission Papers Encl ML20215H9031983-10-27027 October 1983 Annotated Board Notification 83-164:forwards Allegations Re Certain Qa/Qc Activities.Source of Allegations Confidential. Related Documentation Encl ML20204G5401983-10-14014 October 1983 Board Notification 83-158:forwards Oct 1983 Sser 19 Re Matters Identified in Sser 18 & Listed in SECY-83-366,that Must Be Resolved Prior to Fuel Loading.Matters Adequately Resolved ML20151H4871983-05-0404 May 1983 Board Notification 83-057:forwards Differing Prof Opinions Re Sys Interaction & Safety Classification.Info Relates to Board Notifications 83-17 & 83-44 Re Unresolved Safety Issue A-17 ML20204F0461983-04-12012 April 1983 Board Notification 83-42:forwards Info Re Unanalyzed Reactor Vessel Thermal Stress During Cooldown.B&W Informed NRC of Preliminary Safety Concern Evolving from Further Consideration of 800610 St Lucie Upper Head Voiding Event ML20204F0361983-03-0404 March 1983 Board Notification 83-27:forwards 830221 Memo & Final Eg&G Rept Re Addl RELAP-5 Calculation for Semiscale S-SR-2 Test ML20244B9901983-01-0707 January 1983 Board Notification 83-03:notifies of Allegations Re Design Aspects of Component Cooling Water Sys Including Seismic Classification,Instrumentation & Control Design/ Classifications Approaches & Design of Generator Intakes ML20214K5091982-11-16016 November 1982 Board Notification 82-119:forwards Repts Re Design Verification Program - Phase I for Diablo Canyon Unit 1 ML20204F0161982-09-29029 September 1982 Board Notification 82-97:forwards Transcript of NRC 820909 Meeting W/State of CA Re Design Verification Program & Independent Design Verification Program:Auxiliary Bldg, Interim Technical Rept ML20204F0091982-09-24024 September 1982 Board Notification 82-93:forwards Addl Info Re Semiscale Test Results Concerning Feed & Bleed Mode of Core Cooling ML20214W7511982-08-19019 August 1982 Board Notification 82-89 Forwarding Transcript of NRC 820806 Meeting W/Util & Teledyne Engineering Svcs in Bethesda,Md Re Phase I of Facility Idvp.W/O Encl ML20213E2401982-08-12012 August 1982 Forwards Info Items Re Independent Design Verification program-Phase 1 (Idvp).Nrc Evaluating Info as Part of Ongoing Review of Idvp Efforts & Will Rept on Results Prior to Reinstatement of License.W/O Encl ML20062E1651982-07-27027 July 1982 Board Notification 82-71:informs That NRC Did Not Rely on Feed & Bleed Cooling to Protect Core & Forwards Info Supporting Info ML20062E1621982-07-20020 July 1982 Board Notification 82-70:notifies of Differing Prof Opinion Re Sensitization of BWR Stainless Steel Weldments ML20058A8101982-07-0909 July 1982 Board Notification 82-65:forwarding New Info Re NRC Analysis of post-accident/long-term Cooling Following Small Breaks in Primary Sys.Draft Lasl Rept, Small Break LOCA Recovery in B&W Plants Encl ML20204E9541982-06-18018 June 1982 Board Notification 82-60:forwarding Info Re Design Verification Program from Teledyne Engineering Svcs,Rl Cloud Associates,Inc & Rf Reedy,Inc ML20054E9231982-06-10010 June 1982 Board Notification:Notifying of Drywell to Wetwell Vacuum Breakers Which Can Be Subj to air-clearing Load Resulting from Pool Swell Following Postulated Loca.Components Can Be Overstressed by Impact Load ML20204E9511982-06-0404 June 1982 Board Notification 82-57:forwarding Info Re Status of Independent Design Verification Program Activities Relevant to Safety Issue on Design Adequacy.Results Will Be Reported Prior to Reinstatement of License ML20204E9381982-06-0202 June 1982 Board Notification 82-53:forwarding Summary of 820430 Discussion of Bechtel Rate in Completion of Project.Info Relevant to Design Adequacy Safety Issue ML20209B3661982-04-26026 April 1982 Board Notification 82-42 Forwarding Items Re Design Verification Program,Phase I for Facility.W/O Encl ML20212L2111982-03-24024 March 1982 Board Notification 82-29:forwards Listed Documents Re Seismic Design Adequacy of Facility ML20212L1871982-03-15015 March 1982 Board Notification 82-24:forwards W Cooper Re Design Verification Program Manager for Facility.W/O Encl. Related Info Encl ML20204E9331982-01-27027 January 1982 Board Notification 82-06 Forwarding Design Verification Program for Power Ascension:Diablo Canyon Nuclear Power Plant Unit 1, & Qualification Document - Design Verification Program for Power Ascension ML20151H1791982-01-20020 January 1982 Board Notification 82-04 Forwarding Info Re Pressurized Thermal Shock ML20204E9051981-11-0505 November 1981 Forwarding Draft Board Notification 81-38, Seismic Reverification Program Presented During 811103 Meeting W/ PG&E Re Current Status of Review & Evaluation of Seismic Discrepancies in Facility Containment Annulus Area 1989-05-02 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20217N3311999-10-25025 October 1999
[Table view]Informs That Attached Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation on 990929,of Operating License Amends 180 & 172,re Transition to Westinghouse-supplied Fuel ML20217L7171999-10-22022 October 1999 Informs That Encl Questions Were Transmitted by Email to PT Vu of Duke Energy Corp,In Preparation for Upcoming Telcon Re 990624 Amend Request ML20217J2381999-10-13013 October 1999 Informs That Attached Questions Transmitted by Fax on 991013 to J Rainsberry of Southern California Corp to Prepare for Upcoming Telephone Call ML20217K2521999-10-12012 October 1999 Forwards NRC Operator Licensing Exam Repts 50-413/99-302 & 50-414/99-302 (Including Completed & Graded Tests) for Tests Administered on 990921-23 ML20217K3431999-10-12012 October 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990921-23 ML20217F0841999-10-0808 October 1999 Informs That During 466th Meeting of ACRS on 990930-1002, CEOG Proposal to Eliminate PASS from Plant Design & Licensing Bases for CEOG Plants,Were Reviewed.Discussion & Recommendations,Listed ML20217C5311999-10-0808 October 1999 Notification of 991027 Meeting with Representatives of Gpu in Rockville,Md to Discuss Recent Control Rod Surveillance Performance Issues at TMI-1.Proprietary Portions of Meeting Will Be Closed to Public ML20217A8641999-10-0606 October 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990829-0903 ML20212K8901999-10-0505 October 1999 Notification of 991027 Meeting with Util in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TM1-1 ML20217G5041999-09-30030 September 1999 Forwards NRC Operator Licensing Exam Repts 50-413/99-301 & 50-414/99-301 (Including Completed & Graded Tests) for Tests Administered on 990524-27,0603,07-10 & 16 ML20216J2171999-09-30030 September 1999 Informs That Encl Questions Were Transmitted by Email on 990930 to M Purser of Duke Energy Corp for Preparation of Upcoming Telcon.Questions Pertain to 990624 Amend Request ML20216J0151999-09-29029 September 1999 Notification of 991020 Meeting in Forked River,Nj to Discuss Licensee 990922,response to NRC & Other Info Addressing Sale of Portion of Land That Is Part of Plant Site ML20212G3791999-09-24024 September 1999 Notification of 991006-07 Meeting with Industry in San Clemente,California to Discuss Technical Issues Re Industry Development of Submittals for risk-informed Technical Specification Improvements ML20217A8121999-09-21021 September 1999 Concurs with Insp Repts 50-413/99-05 & 50-414/99-05 for Catawba ML20217A8391999-09-21021 September 1999 Concurs on Section E3.1 of Insp Repts 50-413/99-05 & 50-414/99-05 Re Review of Rev 7 of Catawba Ufsar.Notes Minor Typo Made in Input.Ref to Year Should Be 1998 & Not 1997 ML20216G3671999-09-10010 September 1999 Forwards CNWRA Program Manager Periodic Rept (Pmpr) for Period 990731-0827 ML20211K3881999-09-0202 September 1999 Forwards Document Transmitted by Fax from Duke Energy Corp, Signifying Implementation of Operating License Amend 179 & 171 Re Reactor Trip System & Engineered Safety Feature Sys Setpoints on 990824 ML20211J5591999-09-0101 September 1999 Informs That Application Date in First Line of Attached Ltr Issued 990823 Corrected to Read 990625, Not 1997. Requests That Corrected Copy Be Submitted to H Ray ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20211G2671999-08-27027 August 1999 Notification of 990909 Meeting with Util in Rockville,Md to Discuss Proposed TSs for Emergency Feedwater Sys at Waterford 3 ML20210U7571999-08-20020 August 1999 Forwards Info Received from Gpu Nuclear,Inc on 990820 in Preparation for 990823.Requests Info Be Docketed ML20211H0431999-08-0909 August 1999 Submits Comments on San Onofre Response to NRC Request for Addl Info on risk-informed IST Program ML20210L6601999-08-0505 August 1999 Forwards single-page Document Given to G Belisle of Region II by T Clements of Nuclear Control Institute Re Mixed Oxide Fuel ML20210G4671999-07-30030 July 1999 Forwards Draft rept,NUREG/CR-xxxx,Vol x,INEEL/EXT-99-00373, High-Pressure Safety Injection Sys Reliability,1987-1997 ML20210C9991999-07-22022 July 1999 Revised Notification of 990813 Meeting with Gpu Nuclear,Inc Rockville,Maryland to Discuss TMI-1 Licensing Action Status. Meeting Date Changed ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20210E9511999-07-12012 July 1999 Notification of 990805 Meeting with Representative of Gpu Nuclear,Inc in Rockville,Md Re Plant,Unit 1 Licensing Action Status ML20196K6231999-07-0101 July 1999 Forwards Draft Safety Evaluation on TR DPC-NE-2009, Duke Power Co Westinghouse Fuel Transition Rept. Rept Was Transmitted to Warren in Order to Prepare for Conference Call ML20196D7021999-06-25025 June 1999 Informs That Reactor Sys Branch Prepared Suppl 1 to GL 83-11 Re Licensee Qualification for Performing Safety Analyses, Which Was Issued on 990624.Matl Related to Subj GL Should Be Placed in PDR & Made Available to Public ML20212H9621999-06-23023 June 1999 Revised Notification of Meeting with Gpu Nuclear,Inc to Discuss Proposed Mods to RBS Sys Procedures & HPI Cross Connect Lineup.Meeting Rescheduled to 10 A.M. on 990713 ML20195H8521999-06-18018 June 1999 Requests That Encl Questions,Faxed to Gpu Nuclear,Inc on 990616,be Docketed,In Preparation for Forthcoming Conference Call Re TS Change Request 248, Remote Shutdown Sys, ML20195H9911999-06-15015 June 1999 Notification of 990707 Meeting with Util to Discuss Licensee Proposed Mods to Reactor Bldg Spray Procedures & High Pressure Injection Cross Connection Lineup ML20195J0711999-06-14014 June 1999 Submits Issues to Be Discussed in Upcoming Conference Call Re Licensee Response to GL 98-04 ML20195J1181999-06-14014 June 1999 Forwards Documents That Were Transmitted by Fax on 990614 to a Jones-Young Re Issues to Be Discussed in Upcoming Telcon Re DPC Response to GL 98-04 ML20195H6031999-06-11011 June 1999 Forwards Exam Repts 50-361/99-301 & 50-362/99-301 Administered at Facility on 990416,with as Given Written Exam Attached ML20195H7251999-06-11011 June 1999 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam,Submittal for Retake Exam Administered on 990416 ML20207G3661999-06-0909 June 1999 Reissued Notification with Date Change of 990618 Meeting with DPC in Rockville,Maryland to Discuss Compensatory Actions (Allowed Outage Time) for McGuire Nuclear Station ML20207G3711999-06-0909 June 1999 Forwards Questions That Were Transmitted to G Gilbert of DPC for Preparation for Upcoming Review on Site Re Rev 7 of Updated Final Safety Analysis Rept ML20207F1141999-06-0404 June 1999 Notification of Significant Licensee Meeting with Util on 990628 to Discuss Emergency Preparedness Program Status & Planned Changes ML20207E7741999-06-0202 June 1999 Notification of 990617 Meeting with Util in Rockville,Md to Discuss Compensatory Actions (AOT) for McGuire Nuclear Station ML20206U4231999-05-18018 May 1999 Notification of 990602 Meeting with Duke Energy Corp,Vepco & Others in Rockville,Md to Discuss Technical,Regulatory & Licensing Issues Related to Proposed Future Use of Mixed Oxide Fuel at Catawba,Mcguire & North Anna Nuclear Stations ML20206H1861999-05-0606 May 1999 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Amends 177 for Unit 1 & 169 for Unit 2, Concerning CR & Auxiliary Bldg Ventilation Actuation Instrumentation on 990423 ML20206F2921999-05-0505 May 1999 Forwards Draft Questions Which Were Faxed to Licensee for TMI Unit 1,GPUN on 990505 in Preparation for 990506 Conference Call on TS Change Request 279 ML20206H1671999-05-0505 May 1999 Forwards Document,Transmitted by Fax from Duke Energy Corp, Which Signifies Implementation of Operating License Amends 178 & 170 Re Reactor Bldg Integrity Surveillance & Containment Leak Rate Testing on 990423 ML20206E8951999-05-0303 May 1999 Informs That Attached Questions Transmitted by Fax on 990503 to G Gilbert of Duke Energy Corp to Prepare Gilbert & Others for Upcoming Onsite Review of Changes Made Per 10CFR50.59 During 1998 ML20206F8831999-04-30030 April 1999 Informs That NRC Staff Will Discuss Encl Draft for RAI with Eoi,Re EOI Response to GL 95-07, Pressure Locking & Thermal Binding ML20206D1291999-04-28028 April 1999 Notification of 990507 Meeting with Gpu Nuclear,Inc in Rockville,Maryland to Discuss Three Mile Island,Unit 1 Licensing Action Status DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205R8871999-04-20020 April 1999 Notification of 990504 Meeting with Util in Rockville,Md to Discuss Proposal to Submit Consolidated Security Plan for Util Sites ML20205Q4491999-04-19019 April 1999 Forwards Viewgraphs of 990419 Telcon Re SG Eddy Current Insp Results Obtained During Imminent Refueling Outage 1999-09-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20204F036&oldid=3027251"