MONTHYEARML20138H3831999-10-25025 October 1999 Forwards Draft Model of Renewed License for Calvert Cliffs, Unit 2 to Illustrate How List of Minimum Requirements Could Be Incorporated Into License Condition ML20217M9991999-10-22022 October 1999 Forwards Response to NRC 990930 RAI Re Void Swelling Degradation Mechanism,Per License Renewal Application for Ccnpp,Units 1 & 2 ML20217M1721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept Form Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20212M2631999-10-0404 October 1999 Informs That Staff Concluded That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Calvert Cliffs Nuclear Power Plant ML20216J8671999-10-0101 October 1999 Forwards Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant. Rev Accurately Presents Changes Made Since Previous Submittal,Necessary to Reflect Info & Analyses Submitted to NRC or Prepared,Per to NRC Requirements ML20212J7811999-09-30030 September 1999 Requests That Licensee Address Potential Aging Mgt Issue Re Effects of Void Swelling of Rv Internals by Making Plant Specific Commitment to Implement Focused age-related Degradation Insp for Evidence of Void Swelling in Future ML20212J5611999-09-29029 September 1999 Informs That on 990916,NRC Completed mid-cycle Plant Performance Review of Calvert Cliffs.No Areas in Which Util Performance Warranted Addl Insp Beyond Core Insp Program Identified.Historical Listing of Plant Issues,Encl ML20216H7831999-09-28028 September 1999 Forwards Addl Info Re NRC SER for Ccnpp,Units 1 & 2,per License Renewal Application ML20212D5361999-09-20020 September 1999 Forwards Rev 1 to Calculation CA04048, Fuel Handling Accident During Reconstitution, as Agreed During 990909 Telcon ML20212C1861999-09-15015 September 1999 Requests That NRC Complete Review of TR CED-387-P,Rev 00-P, Abb Critical Heat Flux Correlations for PWR Fuel, by 000201.Util Expects to Use ABB-NV Correlation for Current non-mixing Vane Fuel in Reload Analyses in 2000 for Ccnpp ML20212A2001999-09-0808 September 1999 Forwards Insp Repts 50-317/99-06 & 50-318/99-06.Two Violations Being Treated as Noncited Violations ML20211N8971999-09-0707 September 1999 Responds to Ltr to D Rathbun of NRC Dtd 990720,in Which Recipient Refers to Ltr from Wc Batton Expressing Support on Renewal Application of Baltimore Gas & Electric Co for Calvert Cliffs Plants ML20211H9841999-08-31031 August 1999 Provides Comments Re Data Entered in Rvid for Ccnpp,Units 1 2,per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211K3091999-08-27027 August 1999 Informs That During 990826 Telcon,L Briggs & B Bernie Made Arrangements for NRC to Inspect Licensed Operator Requalification Program at Calvert Cliffs Npp.Insp Planned for Wk of 991025 ML20211J1611999-08-17017 August 1999 Documents Bg&E Consultations with MD Dept of Natural Resources Re Potential Impacts to Chesapeake Bay Critical Area & Forest Interior Dwelling Bird Habitat,Per Ccnpp License Renewal.Telcons Ref Satisfy Consulting Requirement ML20210V1181999-08-17017 August 1999 Forwards Toxic Gases Calculations for Control Room Habitability,As Discussed During 990713 Telcon.Util Will Make Final Submittal for Toxic Gases After NRC Has Completed Review of ARCON96 ML20210T5061999-08-16016 August 1999 Forwards Rev 0 to Ccnpp COLR for Unit 2,Cycle 13, Per Plant TS 5.6.5 ML20210U2761999-08-13013 August 1999 Forwards Listed Info Re Guarantee of Payment of Deferred Premiums for Ccnpp,Units 1 & 2,IAW 10CFR140.21 Requirements ML20210S8131999-08-12012 August 1999 Forwards Summary of Various Open Licensing Actions for Bg&E That Were Completed During Unit 2 Refueling Outage Ending 990506 ML20210S8101999-08-12012 August 1999 Forwards Application Requesting Renewal of License for Mv Seckens,License SOP-10369-2.Without Encl ML20210S7901999-08-12012 August 1999 Forwards semi-annual Fitness for Duty Program Performance Data for Period of 990101-990630,IAW 10CFR36.71(d) ML20210Q1941999-08-11011 August 1999 Informs That Info Submitted in 981130 Application Re CEN-633-P,Rev 03-P,dtd Oct 1998,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20210N5881999-08-0606 August 1999 Forwards ISI Rept for Ccnpp,Unit 2,fulfilling Intentions & Requirements Stated in Program Plan & Commitment to Comply with ASME Code Section XI ISI Requirements ML20210N1291999-08-0505 August 1999 Forwards NRC Response to W Batton Ltr Expressing Support of Renewal Application for Calvert Cliffs Plants as Requested in Ltr ML20210N5491999-08-0505 August 1999 Requests That License SOP-10371-2,for RW Scott,Be Renewed IAW 10CFR55.57.Individual Has Satisfactorily Discharged License Responsibilities Competently & Safely.Without Application ML20210N5471999-08-0505 August 1999 Requests That License SOP-10031-3,for DF Theders,Be Removed from Active Files for Ccnpp,Due to Individual Being Reassigned to Position No Longer Requiring License ML20210N9291999-08-0404 August 1999 Forwards Clarification to Initial Response to Biennial Rept on Status of Decommissioning Funding,As Required by 10CFR50.75(f)(1) ML20210J0741999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by Nrc.Web Site Should Reflect Info within 2 Wks ML20211B5381999-07-30030 July 1999 Expresses Appreciation for Support in Y2K Training & Tabletop Exercise Held on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by NRC ML20211C0951999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20211C3251999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20210E4941999-07-23023 July 1999 Informs That 1999 Emergency Response Plan Exercise Objectives Is Scheduled for Wk of 991025.Exercise Scenario Will Test Integrated Capability & Major Portion of Elements Existing within Emergency Response Plan ML20210D0911999-07-22022 July 1999 Responds to to Chairman Jackson Referring to Ltr from New 7th Democratic Civic Club,Inc.Forwards Staff Response to W Batton,President of New 7th Democratic Civic Club,Inc ML20210C5011999-07-21021 July 1999 Informs That SL Walters,License OP-10096-3 & CC Zapp,License Number SOP-2188-9,have Been Reassigned within Organization & No Longer Require NRC License,Per 10CFR50.74(a).Removal of Subject Licenses from Active Files for Ccnpp,Requested ML20210C2681999-07-20020 July 1999 Forwards Certified Copy of Listed Nuclear Liability Policy Endorsement,Per 10CFR140.15(e) ML20210A5021999-07-20020 July 1999 Responds to ,Expressing Support for Renewal of Operating Licenses for Calvert Cliffs Plant & to Concerns Re Lack of Specificity for License Renewal Regulations & Length of Time Set Aside for Public Comment ML20211N9101999-07-20020 July 1999 Forwards Correspondence Author Received from New 7th Democratic Club Civic,Inc Raising Some Serious Concerns About Renewal of Nuclear Reactor Licenses for Calvert Cliffs Power Plant ML20210C8461999-07-19019 July 1999 Informs That CF Farrow,License OP-10648-1,will No Longer Be Employed with Bg&E,As of 990709,per 10CFR50.74(a).Removal of Subject License from Active Files for Ccnpp,Requested ML20209J5171999-07-16016 July 1999 Forwards Comments from Accuracy Review of License Renewal Application SER ML20210B7651999-07-15015 July 1999 Forwards SER Denying Licensee Proposed TS Amend Dtd 981120, to Delete TS Requirements for Tendon Surveillance & Reporting Because TS Requirements Duplication of Requirements in 10CFR50.55a.Notice of Denial Encl ML20209G2081999-07-13013 July 1999 Forwards Insp Repts 50-317/99-05 & 50-318/99-05 on 990509- 0626.No Violations Noted ML20210A6311999-07-0606 July 1999 Discusses Closure of TACs MA0532 & MA0533 Re Response to Requests for Addl Info to GL 92-01,rev1,suppl 1, Reactor Vessel Structural Integrity, for Plant,Units 1 & 2 ML20209C1391999-07-0202 July 1999 Forwards Responses to Open & Confirmatory Items Based on Review of SER for Bg&E Application for Renewal of Operating Licenses for Calvert Cliffs.Bg&E Intends to Forward Comments Based on Accuracy Verification in Near Future ML20210D1531999-06-30030 June 1999 Informs of Receipt of from New 7th Democratic Civic Club,Inc Expressing Support for License Renewal. Requests Consideration in Addressing Concerns & Recommendations ML20209B5781999-06-29029 June 1999 Submits Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML20210D1741999-06-24024 June 1999 Expresses Opinions on Renewal of Nuclear Reactor Licenses Re Plant & Support Renewal Application of Bg&E.Requests That NRC Revise Procedures to Allow Sufficient Time for Public to Review,Evaluate & Respond to Info ML20211H8431999-06-23023 June 1999 Ack Participation of Calvert Cliffs Nuclear Engineering Dept in NRC Cooperative Research Project with Univ of Virginia. Copy of Relevant Portion of NRC Cooperative Agreement with Univ of Virginia Encl ML20196C6831999-06-21021 June 1999 Discusses Proposed Alternative Submitted by Bg&E for Calvert Cliffs NPP to Requirements of 10CFR50.55a(g)(4) in Regard to Compliance with Latest Approved Edition of ASME Code,Section XI for Third Ten Year Insp Interval Beginning on 990701 ML20196C4291999-06-21021 June 1999 Forwards Rev to ERDS Data Point Library for Ccnpp,Unit 2,per 10CFR50,App E,Section VI.3.a.Table Provides Brief Summary of Changes ML20195J8271999-06-16016 June 1999 Ack Receipt of to Jackson,Chairman of NRC Re Environ Impacts of Increased Patuxtent River Complex Flight Operations on Ccnpp.Clarification & Correction of Listed Statement Found on Page Two,Provided 1999-09-08
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20138H3831999-10-25025 October 1999 Forwards Draft Model of Renewed License for Calvert Cliffs, Unit 2 to Illustrate How List of Minimum Requirements Could Be Incorporated Into License Condition ML20217M1721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept Form Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20212M2631999-10-0404 October 1999 Informs That Staff Concluded That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Calvert Cliffs Nuclear Power Plant ML20212J7811999-09-30030 September 1999 Requests That Licensee Address Potential Aging Mgt Issue Re Effects of Void Swelling of Rv Internals by Making Plant Specific Commitment to Implement Focused age-related Degradation Insp for Evidence of Void Swelling in Future ML20212J5611999-09-29029 September 1999 Informs That on 990916,NRC Completed mid-cycle Plant Performance Review of Calvert Cliffs.No Areas in Which Util Performance Warranted Addl Insp Beyond Core Insp Program Identified.Historical Listing of Plant Issues,Encl ML20212A2001999-09-0808 September 1999 Forwards Insp Repts 50-317/99-06 & 50-318/99-06.Two Violations Being Treated as Noncited Violations ML20211N8971999-09-0707 September 1999 Responds to Ltr to D Rathbun of NRC Dtd 990720,in Which Recipient Refers to Ltr from Wc Batton Expressing Support on Renewal Application of Baltimore Gas & Electric Co for Calvert Cliffs Plants ML20211K3091999-08-27027 August 1999 Informs That During 990826 Telcon,L Briggs & B Bernie Made Arrangements for NRC to Inspect Licensed Operator Requalification Program at Calvert Cliffs Npp.Insp Planned for Wk of 991025 ML20210Q1941999-08-11011 August 1999 Informs That Info Submitted in 981130 Application Re CEN-633-P,Rev 03-P,dtd Oct 1998,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20210N1291999-08-0505 August 1999 Forwards NRC Response to W Batton Ltr Expressing Support of Renewal Application for Calvert Cliffs Plants as Requested in Ltr ML20211C0951999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20210J0741999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by Nrc.Web Site Should Reflect Info within 2 Wks ML20211C3251999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20211B5381999-07-30030 July 1999 Expresses Appreciation for Support in Y2K Training & Tabletop Exercise Held on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by NRC ML20210D0911999-07-22022 July 1999 Responds to to Chairman Jackson Referring to Ltr from New 7th Democratic Civic Club,Inc.Forwards Staff Response to W Batton,President of New 7th Democratic Civic Club,Inc ML20210A5021999-07-20020 July 1999 Responds to ,Expressing Support for Renewal of Operating Licenses for Calvert Cliffs Plant & to Concerns Re Lack of Specificity for License Renewal Regulations & Length of Time Set Aside for Public Comment ML20210B7651999-07-15015 July 1999 Forwards SER Denying Licensee Proposed TS Amend Dtd 981120, to Delete TS Requirements for Tendon Surveillance & Reporting Because TS Requirements Duplication of Requirements in 10CFR50.55a.Notice of Denial Encl ML20209G2081999-07-13013 July 1999 Forwards Insp Repts 50-317/99-05 & 50-318/99-05 on 990509- 0626.No Violations Noted ML20210A6311999-07-0606 July 1999 Discusses Closure of TACs MA0532 & MA0533 Re Response to Requests for Addl Info to GL 92-01,rev1,suppl 1, Reactor Vessel Structural Integrity, for Plant,Units 1 & 2 ML20211H8431999-06-23023 June 1999 Ack Participation of Calvert Cliffs Nuclear Engineering Dept in NRC Cooperative Research Project with Univ of Virginia. Copy of Relevant Portion of NRC Cooperative Agreement with Univ of Virginia Encl ML20196C6831999-06-21021 June 1999 Discusses Proposed Alternative Submitted by Bg&E for Calvert Cliffs NPP to Requirements of 10CFR50.55a(g)(4) in Regard to Compliance with Latest Approved Edition of ASME Code,Section XI for Third Ten Year Insp Interval Beginning on 990701 ML20196E0371999-06-16016 June 1999 Forwards Insp Repts 50-317/99-03 & 50-318/99-03 on 990321-0508.Apparent Violation Being Considered for Escalated Enforcement Action ML20207G4331999-06-0707 June 1999 Informs That in Response Request by Nrc,Fema Evaluated Adequacy of Evacuation Plans & Training of Local First Responders for Area Around Ccnpp.Copy of FEMA & Encl to Ltr,Which Provides FEMA Recommendations Encl ML20207G4701999-06-0707 June 1999 Informs of Reorganization in NRR Ofc,Effective 990328. Organization Chart Encl ML20207B2491999-05-21021 May 1999 Forwards Insp Repts 50-317/99-04 & 50-318/99-04 on 990405-16.No Violations Noted.Insp Revealed Few Potential & Plausible Aging Effects NRC Team Determined Should Be Included in License Renewal Application ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML20206A6171999-04-22022 April 1999 Responds to Request for Statistics on Allegation Re Plant by J Osborne.Encl Tables Provides Breakdown of Allegations by Source Category for Allegations Receive in CY95-98 & First Six Month of 1999 ML20205R0961999-04-15015 April 1999 Forwards Insp Repts 50-317/99-01 & 50-318/99-01 on 990131- 0320.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20205P1381999-04-0909 April 1999 Discusses 990223 Ppr.Forwards Plant Issues Matrix & Insp Plan.Since Spring 1998 Unit 1 Operated at Essentially Full Power.Unit 2 Had Similar Power History Except for Jul 1998 Manual Reactor Trip Due to Small Bore Pipe Steam Leak ML20205P1281999-04-0808 April 1999 Forwards Monthly Status Rept on Licensing Activities & Regulatory Duties of NRC for Mar 1999.Targets for Licensing Action Age & Completion Rates & License Renewal Process for Calvert Cliffs Remains on Schedule ML20205E5511999-03-26026 March 1999 Forwards Insp Repts 50-317/99-02 & 50-318/99-02 on 990208-12.No Violations Noted.Insp Was First of Three Planned Visits to Verify Ccnpp License Renewal in Compliance with Requirements of Rule for License Renewal ML20205G8841999-03-24024 March 1999 Discusses Bg&E Application Filed on 980408 for Renewal of Operating Licenses DPR-53 & DPR-68 for Calvert Cliffs Units, 1 & 2.For Listed Reasons,Partial Exemption from 10CFR170 Fees Granted IAW 10CFR170.11(b)(1) ML20205B0291999-03-24024 March 1999 Informs That Author Determined That Partial Exemption from 10CFR170 Fee Requirements Appropriate for Footnote 4 of License Renewal Application for Plants,Units 1 & 2,dtd 980408,that Staff Determines Has Generic Value to Industry ML20204H6281999-03-21021 March 1999 Forwards SER Reflecting Status of Staff Review of Util License Renewal for Calvert Cliffs Nuclear Power Plants, Units 1 & 2 ML20207E9641999-03-0404 March 1999 Forwards Insp Repts 50-317/98-12 & 50-318/98-12 on 981213- 990130 & Notice of Violation Re Failure of Maint Workers to Tighten Bolting for Svc Water Heat Exchanger ML20207G8631999-02-25025 February 1999 Forwards Operator Initial Exam Repts 50-317/99-301OL & 50-318/99-301OL on 990122 & 25-29 (Administration) & 990201- 05 (Grading).All Applicants Passed All Portions of Exams ML20203D3981999-02-0505 February 1999 Forwards Safety Evaluation Accepting Procedure Established for long-term Corrective Action Plan Related to Containment Vertical Tendons ML20203A6141999-02-0303 February 1999 Submits Details on Listed Areas Re Inspection Plan of Insp Scheduled for 990203 ML20202J1901999-01-28028 January 1999 Discusses License Renewal for Operating Power Reactors.Two Applications Received for Renewing Operating Licenses. Commission Established Adjudicatory Schedule Aimed at Completing License Renewal Process in 30-36 Months ML20202H7621999-01-28028 January 1999 Discusses Guidance Re License Renewal for Operating Power Reactors Developed in Response to FY99 Energy & Water Development Appropriations Act Rept 105-581 ML20199G4121999-01-20020 January 1999 Forwards SE Accepting Util USI A-46 Implementation Program for Plant ML20199L6621999-01-19019 January 1999 Informs That Licensee Authorized to Administer Initial Written Exam to Listed Applicants on 990122.NRC Region I Operator Licensing Staff Will Administer Operating Test to Applicants ML20199K8481999-01-19019 January 1999 Forwards Insp Repts 50-317/98-11 & 50-318/98-11 on 981025-1212.No Violations Noted ML20199F4101999-01-0808 January 1999 Forwards SE Accepting Util 960213,0725 & 981202 Responses to GL 95-07, Pressure Locking & Thermal Binding of Safety- Related Power-Operated Gate Valves ML20198S7491999-01-0707 January 1999 Forwards SER Accepting Licensee ,Suppl by 980424 & 1124 Ltrs Proposing Changes to Rev 49 of Calvert Cliffs Nuclear Power Plant Quality Assurance Program Description in Accordance with 10CFR50.54(a)(3) ML20198S4291999-01-0707 January 1999 Requests Addl Info Re License Renewal Application as Application Relates to Staff Position on Environ Qualification ML20196K2991999-01-0404 January 1999 Forwards Notice of Consideration of Approval of Transfer of Facility Operating License & Matl License & Opportunity for Hearing in Response to Application ML20202D0271998-12-15015 December 1998 Forwards Notice of Withdrawal of Application for Amend to License DPR-69.Proposed Change Would Have Modified Svc Water Head Tanks.Without Encl ML20198L3431998-12-12012 December 1998 Forwards Insp Repts 50-317/98-10 & 50-318/98-10 on 980706-10 & 1118.Insp Rept Documents App R Issues Which Constituted Violations of NRC Requirements.Nov Not Issued Because, Violations Identified by Licensee Staff as Part of C/A ML20198B1791998-12-10010 December 1998 Advises of Planned Insp Effort Resulting from Calvert Cliffs NPP Review Conducted on 981110.Details of Insp Rept for Next 6 Months & Historical Listing of Plant Issues Considered During Process Encl 1999-09-08
[Table view] |
Text
{{#Wiki_filter:. _ . - . - - . . -. . - . - . - - - - - - . _ - _ _ . . . , - . - - . - . - - . . - . -
. 4 s September h ,1998 l Mr. Charles H. Cruse, Vice President Nuclear Energy Division
- Baltimore Gas and Electric Company 1650 Calvert Cliffs Parkway )
l Lusby, MD 20657-47027
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE I CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS.1 & 2, INTEGRATED l PLANT ASSESSMENT FOR THE FEEDWATER SYSTEM (TAC NOS. M95453, M95454, AND M99178)
Dear Mr. Cruse:
By letter dated May 23,1997, Baltimore Gas and Electric Company (BGE) submitted for review the Feedwater System (5.9) integrated plant assessment technical report as attached to the
" Request for Review and Approval of System and Commodity Reports for License Renewal."
BGE requested that the Nuclear Regulatory Commission (NRC) staff review the Feedwater System (5.9) integrated plant assessment technical report to determine if the report meet the requirements of 10 CFR 54.21(a), " Contents of application-technicalinformation," and the demonstration required by 10 CFR 54.29(a)(1), " Standards for issuance of a renewed license,"
to support an application for license renewal if BGE applied in the future. By letter dated April 8,1998, BGE formally submitted its license renewal application. l The NRC staff reviewed the Feedwater System (Section 5.9) integrated plant assessment against the requirements of 10 CFR 54.21(a)(1) and 10 CFR 54.21(a)(3). By letter dated .
February 13,1998, the staff forwarded requests for additional information to BGE in order to ;
give BGE additional time to prepare its responses while the staff was continuing its review of the subject reportJ Based on the continued review of Section 5.9 of BGE's license renewal application, the staff has identified in the enclosure additional areas beyond those outlined in the February 13,1998, letter where information is needed to complete its review. )
' Please provide a schedule by letter or telephonically for the submittal of your responses within 30 days of the receipt of this letter. Additionally, the staff would be willing to meet with BGE prior to the submittal of the responses to provide clarifications of the staffs requests for additionalinformation. ,
Sincerely, WW David L. Solorio, Project Manager >
License Renewal Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation )
Enclosure:
As stated i Docket Nos. 50-317,50-318 g i
cc:' See next page DISTRIBUTION: r[ $ I { g :
See next page ' '
DOC U M ENT i LAME:G :\ WOR KING \LE E\FWS_RAllTR -/
OFFICE ' LA:PDI-1j PDLR/DRPM (FQLR/DRff91:ASCPDLR/DRP,M:D ,
NAME SlJttl# DSolorid BPraK CGrimes@ ,
DATE -{/IiS8 $/) /98 / 8/ /k $/l /98 OFFICIAL RECORD COPY 9909150221 980901 "
;" "" S'# m gg IR.E CEN
Mr. Charles H. Cruse - Calvert Cliffs Nuclear Power Plant Baltimore Gas & Electric Company Unit Nos.1 and 2 l cc:
i President Mr. Joseph H. Walter, Chief Engineer i Calvert County Board of Public Service Commission of Commissioners Magland 175 Main Street Engineering Division Prince Frederick, MD 20678 6 St. Paul Centre Baltimore, MD 21202-6806 l James P. Bennett, Esquire Counsel Kristen A. Burger, Esquire Baltimore Gas and Electric Company Maryland People's Counsel l P.O. Box 1475 6 St. Paul Centre Baltimore, MD 21203 Suite 2102 l Baltimore, MD 21202-1631 Jay E. Silberg, Esquire ,
Shaw, Pittman, Potts, and Trowbridge Patricia T. Birnie, Esquire 2300 N Street, NW Co-Director Washington, DC 20037 Maryland Safe Energy Coalition
- _ P.O. Box 33111 1 l Mr. Thomas N, Prichett, Director Baltimore, MD 21218 '
NRM Calvert Cliffs Nuclear Power Plant Mr. Loren F. Donatell j 1650 Calvert Cliffs Parkway NRC Technical Training Center l Lusby, MD 20657-4702 5700 Brainerd Road Chattanooga, TN 37411-4017 Resident inspector U.S. Nuclear Regulatory Commission David Lewis l P.O. Box 287 Shaw, Pittman, Potts, and Trowbridge St. Leonard, MD 20685 2300 N Street, NW Washington, DC 20037 Mr. Richard I. McLean Nuclear Programs Douglas J. Walters Power Plant Research Program Nuclear Energy Institute Maryland Dept. of Natural Resources 1776 i Street, N.W.
Tawes State Office Building, B3 Suite 400 Annapolis, MD 21401 Washington, DC 20006-3708 DJW@NEl.ORG Regional Administrator, Region i U.S. Nuclear Regulatory Commission Barth W. Doroshuk 475 Allendale Road Baltimore Gas and Electric Company King of Prussia, PA 19406 Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway NEF ist Floor Lusby, Maryland 20657 1
1
__ - - - - - . . . _ . .. . . - .~ _-- - ._ _ _ .
\v Distribution:
MARD COPY Docket Files PUBLIC PDLR R/F MEl-Zeftawy DISTRIBUTION: E-MAIL:
FMiraglia (FJM)
JRoe (JWR)
DMatthews (DBM)
CGrimes (CIG)
TEssig (THE)
Glainas (GCL)
JStrosnider (JRS2)
GHolahan (GMH)
SNewberry (SFN)
GBagchi(GXB1)
RRothman (RLR)
JBrammer (HLB)
CGratton (CXG1)
JMoore (JEM)
MZobler/RWeisman (MLZ/RMW)
SBajwa/ADromerick (SSB1/AXD)
LDoerflein (LTD)
BBores (RJB)
SDroggitis (SCD)
RArchitzel (REA)
CCraig (CMC 1)
LSpessard (RLS)
RCorreia (RPC)
RLatta (RML1)
EHackett (EMH1)
AMurphy (AJM1)
TMartin (TOM 2)
DMartin (DAM 3)
GMeyer (GWM)
WMcDowell(WDM)
SStewart (JSS1)
THiltz (TGH)
SDroggitis (SCD)
DSolorio (DLS2)
PDLR Staff JFair (JRF)
KParczewski (KIP)
SLittle (SLL)
=
'a REQUEST FOR ADDITIONAL INFORMATION CALVERT CLIFFS UNITS 1 AND 2 FEEDWATER SYSTEM INTEGRATED PLANT 6
DOCKET NOS. 50-317/50-318 Aging Management
- 1. The BGE application indicates that thermal stratification is a significant contributor to fatigue usage for the steam generator nozzle and adjacent piping. The application further indicates that the piping adjacent to the Unit 2 steam generator was instrumented with thermocouples to obtain temperature data around the circumference of the pipe.
Provide a sketch of the piping showing the locations of the thermocouples used to measure the temperature data for the steam generator nozzle.
- 2. The application indicates that the effect of local thermal stratification in the feedwater system does not extend beyond the first elbow of the vertical pipe run. Provide the basis for this conclusion.
- 3. The application indicates that a finite element analysis of the steam generator nozzle region was performed to determine the most critical location for fatigue. Provide the following information regarding the finite element analysis:
(a) Indicate the computer code used for the analysis. Describe the method used to verify the computer code.
(b) Provide a description of the model used for the analysis and indicate the assumptions used in the analysis. Includs a discussion of stress intensification factors, if any, used in the analysis.
- 4. The application indicates that the critical feedwater nozzle welds in Unit 1 were inspected in 1996, and that no flaws with sizes above the critical flaw size specified in the ASME Code were identified. Characterize the indications, if any, that were identified during the inspections. The application also indicates that Unit 2 welds were scheduled for inspection during the 1997 refueling ou+ age. Provide the results of the Unit 2 inspections including a characterization of any indications identified during the inspections.
- 5. Electric Power Research Institute (EPRI) Report TR-107515, " Evaluation of Thermal Fatigue Effects on Systems Requiring Aging Management Review for License Renewal for the Calvert Cliffs Nuclear Power Plant," provides the retuits of the fatigue analyses of the feedwater nozzles. Table 3-16 of the EPRI report ladicates that fatigue usage factors, without considering environmental effsets, will exceed 1.0 prior to forty years of operation for two Unit 2 steam generator nozzles . Section 3.1.4 of the EPRI report contains a flaw tolerance evaluation in accordance with criteria in ASME Section XI Nonmandatory Appendix L. The flaw tolerance evaluation, using the environmental Enclosure m _ _ _ _ _
2 crack growth data in proposed ASME Code Case, " Fatigue Crack Growth Rate Curves for Ferritic Steels in PWR Water Environments," (Rev 1,12/10/96), Indicates that a postulated fatigue flaw in three of the steam generator feedwater nozzles could grow through wail in less than one operating cycle. The BGE license renewal application
- indicates that corrective actions will be initiated wellin advance of reaching a fatigue usage factor of 1.0. Describe the corrective actions that will be initiated when the fatigue usage factor approaches 1.0 at the steam generator feedwater nozzles.
- 6. Section 5.9 of the application references a site report (Reference 33 on page 5.9-26 of the application) dated July,1996, for the BGE fatigue evaluation. Other sections of the application reference this report or other apparently similar reports. In December,1997, EPRI issued Report TR-107515, ' Evaluation of Thermal Fatigue Effects on Systems Requiring Aging Management Review for License Renewal for the Calvert Cliffs Nuclear Power Plant." By letter dated February 9,1998, EPRI submitted this report for staff i information. Describe the extent to which EPRI Report TR-107515 is a current fatigue l evaluation and the results of all of the other plant-specific fatigue analyses.
i
- 7. BGE's program for managing the effects of erosion / corrosion is to monitor the local pipe 4
wall thickness and take corrective action when the wall thickness is projected to fall below a certain minimum value. Your July 30,1998, response to the staff request for additional information (RAl) on the feedwater system, question 13, indicates that this minimum wall thickness is determined based on internal pressure alone.
(a) Please demonstrate that piping with a pipe wall thinned locally to this minimum wall thickness could withstand all licensing basis loads, including bending.
(b) The minimum wall thickness equation cited in your July 30,1998, RAI response applies only to straight pipes. Please provide the basis for applying this equation to fittings, such as elbows, tees, reducers, and fabricated branch connections.
- 8. One of the most effective ways of minimizing erosion / corrosion is to control secondary water chemistry, that is, pH and oxygen concentration. Describe whether pH and oxygen concentration are controlled in the feedwater system and if so, specify the parameter ranges.
- 9. In order to measure the maximum wall thinning of a given component caused by erosion / corrosion, several measurements at different locations are made and the maximum wall thinning is calculated. Describe what approach is used for measuring data along a pipe (that is, band, area, moving blanket, or point to point method).
- 10. Describe the erosion / corrosion degradation of the feedwater check valves which was discovered during their inspection at the Calvert Cliffs plants. How was the inspection performed? Was the wall thinning measured or was the inspection limited only to visual examination?
- 11. In addition to the predictions by the CHECWORKS computer code, what other selection methods (for example, industry experience and engineering judgment) are used in
-. . - . . - - . - - _ _ ~ _ . . . - . - . - - . . -- . -. - . - . .
a 3
selecting components for erosion / corrosion inspection (wall thickness measurement)?
Describe them briefly.
- 12. To determine the life of the components exposed to erosion / corrosion, it is important to know the rate at which thinning of their walls is occurring. This information can be obtained by using appropriate methods for trending component degradation due to erosion / corrosion. Describe the trending methods used in predicting life of the components. In your trending methods, are you using measured or computer predicted data?
- 13. What is the frequency of valve inspection in the Preventive Maintenance Program relied on to manage erosion / corrosion?
- 14. Describe the materials for replacement components in the feedwater system due to erosion / corrosion degradation, such as enromium-molybdenum and carbon steel.
- 15. Page 5.9-20 of the application indicates that the Institute of Nuclear Power Operations (INPO) has performed assessment of the BGE erosion / corrosion program and provided recommendation for enhancoments. Please briefly summarize the results of the INPO assessment and outline the INPO recommendations for improvements at the Calvert Cliffs plants.
- 16. Describe incid6nts of damage or failure of components caused by erosion / corrosion at Calvert Cliffs and associated corrective actions.
- 17. Does the BGE erosion / corrosion program permit weld overlay as a corrective action when degraded components are found?
- 18. Describe the extent of inspection of 2-inch and less piping as part of the BGE ,
erosion / corrosion program.
L 5