Forwards Insp Rept 50-409/98-05 on 981207-10.No Violations Noted.Activities in Areas of Facility Mgt & Control,Spent Fuel Safety & Radiological Safety Were Examined
ML20198E437
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 12/17/1998
From: Jorgensen B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Berg W
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20198E442 List:
References
50-409-98-05, 50-409-98-5, NUDOCS 9812240058
Download: ML20198E437 (2)


See also: IR 05000409/1998005

Text

. . . -- . .

- . .

-.

  • '

.

.

.

i

December 17, 1998

!

c

l

Mr. W. L. Berg

l' General Manager

a

Dairyland Power Cooperative -

3200 East Avenue South

La Crosse, WI 54602

SUBJiECT: - NRC INSPECTION REPORT 50-409/98005(DNMS)

Dear Mr. Berg:

'

On December 7-10,1998, the NRC conducted an inspection at your permanently shut down

La Crosse Boiling Water Reactor nuclear plant which examined safe storage activities. The

j enclosed report presents the results of that inspection.

e

i During this inspection, activities in the areas of facility management and control, spent fuel

safety, and radiological safety were examined.

Overall performance during decommissioning activities was good. All activities inspected were

conducted in compliance with the Decommissioning Plan, the Quality Assurance Program and

the Technical Specifications.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the

enclosed inspection report will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,  !

l

l

/s/ B. L. Jorgensen

9812240058 981217

PDR ADOCK 05000409 Bruce L. Jorgensen, Chief  !

O PDR Decommissioning Branch

Docket No. 50-409

License No. DPR-45 <

Enclosure: Inspection Report 50-409/98005(DNMS)

See Attached Distribution

DOCUMENT NAME: G:\SEC\ LAC 98005.DNM

To receive a copy of this document Indicate in the box:"C' = Copy without enclosure "E"= Copy with enclosure"N"= No copy

OFFICE . Rill @ Rlli o l Rlli o lG l

NAME PNelsoRib GE15hdsihan Jorgl@en

'

DATE.- 112/a/98 12/J/98' 124/96

OFFICIAL RECORD COPY

._ , -

-. , __ - -

__

.. ._. _ _ - .. .- . . . - . - -.

.,...-

W. Berg 2-

4

- cc w/ encl: Roger' Christians, Plant Manager

B. D. Burks, P.E., Director, Bureau of Field Operations

J. Mettner, Chairman, Wisconsin Public

Service Commission

Spark Burmaster, Coulee Region Energy Coalition .

State Liaison Officer

Chief, Radiation Protection Section

WI Department of Health and

Social Services, Division of Health

Distribution:

Docket File w/encI

, PUBLIC IE-01 w/enct

Rlli PRR w/enci

S. Weiss, NRR w/enci

M. Masnik, NRR w/enci

S. W. Brown, NMSS w/enci

J. L. Caldwell, Rlli w/ encl

C. D. Pederson, Rlli w/enci

R. J. Canlano, Rill w/enci

Rill Enf. Coordinator w/ encl

TSS w/enci

l IEO (e-mail) -

DOCDESK (e-mail)

l- Green w/o enci

!

I.

i

!-

2200B3

,