ML20151B778

From kanterella
Revision as of 15:45, 25 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Spec Figure 6.2.2-1, Unit Onsite Organization
ML20151B778
Person / Time
Site: Clinton Constellation icon.png
Issue date: 03/30/1988
From:
ILLINOIS POWER CO.
To:
Shared Package
ML20151B777 List:
References
NUDOCS 8804110256
Download: ML20151B778 (1)


Text

-- --.

a MANAGER- (

CLINTON POWER STATION TSSISTANT M". NAGER h

- CLINTON POWER 2 STATION

-1 O i Z I

' I I I I C ASSISTANT MANAGER Z ASSISTANT MANAGER ASSISTANT MANAGER ASSISTANT MANAGER

-1 PLANT OPERATIONS, R. ANT MAINTENANCE PLANT RADIA*lON PLANT TECHDHCAL l PROTECTION SUPERVISOR- S'.lPERVISOR R. ANT RADIATIOS. PLANT SUFPORT PROTECT;ON SERVICES I

ASSISTANT SUPERVISOR PLANT SUPPORT SERVICES SUPERVISOR- SLPERVISOR- SLPERVISOR- SUPERvlSOR-SUPERVISOR-RADICI.OGICAL - SUPERVISOR- _ _

PLANT -- MAINTENANCE MECHANICAL -

E LEAR NITY g ENGINEERING s CMRATIONS PLANNING MAINTENANCE '

D Mn

-- SI Ni30R- UPERVISOR- SUPERVISOR- SUPERVtSOR- ~

PLANT ELECTRICAL -

RADIOLOGICAL - TESTING S -

CPERATOWS MAINTENANCE OPERATIONS SCHEDULING SUPPORT SUPERVISOR- SUPERVISOR- SUPERVis3A- SUPERVISOR-CSI -

RADIOLOGICAL - FIRE -

I NDUSTRI AL -

h848NTENANCE SUPPORT PROTECTION SAFETY SUPERVISOM- SUPEI4 VISOR-RADIOLOGICAL -

RADWASTE W POSITION REQUtRES INDIVOUAL TO a ENVIRONMENTAL HAVE HAD A CPS SRO LICENSE.

Ji M POSITION REQUIRES A CPS SRO SUPERVISOR-LICENSE. CHEMISTRY --

5 o N, so o g *7$

-ey ggO4Uh-se% W o33 PDR " u" %

~w e _

Figure 6.2.2-1 Unit Opsite Organizolion

- _ - _ _ - _ _ _ __ . - - . .- - .