ML20151W166

From kanterella
Revision as of 14:25, 24 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Violation from Insp on 880126-29.Violation Noted: Equipment Qualification Files J-601,J-313 & E-171 Contained Deletions,Whiteout Changes of Original Text Not Initiated or Dtd
ML20151W166
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 04/27/1988
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20151W163 List:
References
50-354-88-03, 50-354-88-3, NUDOCS 8805030315
Download: ML20151W166 (1)


Text

. . . -~ , . .-

2 . <

.q. #

l APPENDIX A .l NOTICE OF VIOLATION Public Service Electric and Gas Company Docket No. 50-354-

' Hope Creek Unit 1 Nuclear Plant License No. NPF-57 As a result of the equipment qualification inspection of January 26-29, 1988 and in accordance with NRC Enforcement Policy (10 CFR 2, Appendix C) the following '

violation has been identified:

10 CFR 50, Appendix B, Criterion V states, in part, that: "Activities affecting quality shall be accomplished in accordance with instructions, procedures..."

i Procedure number VPN-NSP-07, Section 8.2.1 states, in part, that: "The use of whiteout and/or obliteration is not permitted on Quality Assurance records. Changes shall be made by a single line drawn through the item with new information written in, initialed and dated."

Contrary to the above, on January 29, EQ file numbers J-601, J-313 and ,

E-171 contained deletions, whiteout changes of the original text that had not been initialed or dated.

Pursuant to the provisions of 10 CFR 2.201, Public Service Electric 8iGas Company is hereby required to submit to this office within_ thirty days of the date of the letter which transmitted this Notice, a written statement or i explanation in reply, including: (1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. ,

Where good cause is_shown, consideration will be given to extending this response time. '

1 f

i l

i E

OFFICIAL RECORO CCPY IR HC 88 0004.0.0 (;

04/20/88 8805030315 880427 f PDR ADOCK 05000354

Q DCD i