ML20153G375

From kanterella
Revision as of 21:31, 23 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of 880915 SALP Board Meeting 88-140 in King of Prussia,Pa for Regional Evaluation Phase of SALP
ML20153G375
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/31/1988
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8809080134
Download: ML20153G375 (2)


Text

. - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ ._ - __-______ __ - _ __ ____ ___ _ ______ - _ ---__ - _ ____ _ _ - _

y.
  • 8i AUG 1988 No.88-140 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SALP BOARD MEETING Licensee: Philadelphia Electric Company Facility: Peach Bottom Units 2 and 3 Docket No.: 50-277 and 50-278 Time and Date: 10:30 a.m., Thur: day, Septer.ber 15, 1988 Location: Region I, ORP Confere,ce Room King of Prussia, Pennsyn.:nia

Purpose:

Regional Evaluation Phase of the Systematic Assessment I

of Licensee Performance (SALP)

NRC Attendees: W. Kane, Director, Division of Reactor Projects (DRp)

S. Collins, Deputy Director, DRP T. Martin, Director, Division of Reactor Safety (ORS)

S. Ebneter, Director, Division of Radiation Safety and Safeguards (DRSS)

E, Wenzinger, Chief, Projects Branch No. 2, DRP R. Bellamy, Chief. Facilities Radiological Safety and and Safeguards Branch, DRSS R. Gallo, Chief, Operations Branch, DRS J. Durr, Chief. Engineering Branch, DRS G. Kelly, Chief, Technical Support Staff, DRP J. Linville, Chief, Reactor Projects Section 2A, DRP W. Butler, Project Director, Project Directorate I-2, NRR R. Martin, Licensing Project Manager T. Johnson, Senior Resident Inspector Note: Attendance by NRC personnel at this meeting should be made known by 4

September 12, 1988 via telephone call to J. Linville, Region I, at FTS 356-5122 or 215-337-5122.

, Prepared By: DE I J. C. Linville, Chief, RPS 2A l

$ 277 PNV ff q,,

f yl '

O ,

/ f

y o S1 AUG 1988 Distribution:

V. Stello, Jr. , Executive Director for Operations J. Taylor, Deputy Executive Director for Regional Operations B. Grimes, Acting Director, Division of Reactor Inspection & Safeguards, NRR J. Lieberman, Director, Office of Enforcement L. Chandler, Assistant General Counsel for Enforcement T. Murley, Director, Office of Nuclear Reactor Regulation T. Martin, Acting Associate Director for Inspection & Technical Assessment, NRR B. Boger, Assistant Director for Region I Reactors, NRR B. Clayton, Regional Coordinator, EDO W. Regan, Chief, Human Factors Assessment Branchn NRR W. Butler, Director, Project Directorate I-2, NRR R. Martin, Licensing Project Manager, NRR Public Document Room (PDR)

Local Public Document Room (LPDR) bec:

Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Section Chiefs SLO Region I Receptionist PAD DRMA Files DRP Files Bulletin Board M. J.,DiDonato, DRP QvY RItDRP RI:DRP Linville/rbl Wenzinger 8/j/88 8/ /88 l

l l

OFFICIAL RECORD COPY MEETING NOTICE 85-140 - 0002.0.0 03/30/53