Correction Letter to Amendment No. 180 Issued September 4, 2020
ML20273A023
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/09/2020
From: Michael Mahoney
Plant Licensing Branch II
To: Snider S
Duke Energy Progress
Mahoney M, NRR/DORL/LPL2-2, 415-3867
References
EPID L-2020-LLA-0024
Download: ML20273A023 (22)


Text

October 9, 2020 Mr. Steven Snider Vice President - Nuclear Engineering Nuclear Corporate Duke Energy Corporation 526 South Church Street, EC-07H Charlotte, NC 28202

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - CORRECTION LETTER TO AMENDMENT NO. 180 ISSUED SEPTEMBER 4, 2020 (EPID L-2020-LLA-0024)

Dear Mr. Snider:

On September 4, 2020 (Agencywide Documents Access and Management System Accession No. ML20237F435), the U.S. Nuclear Regulatory Commission (NRC) issued the following amendments in response to the Duke Energy Progress, LLC and Duke Energy Carolinas, LLC application dated February 6, 2020:

Amendment Nos. 417, 419, and 418 to Renewed Facility Operating License Nos. DPR-38, DPR-47, and DPR-55 for the Oconee Nuclear Station, Units 1, 2, and 3, respectively; and Amendment No. 180 to Renewed Facility Operating License No. NPF-63 for the Shearon Harris (Shearon Harris) Nuclear Power Plant, Unit 1.

The amendments revised the technical specification (TS) requirements for mode change limitations based on Technical Specifications Task Force Traveler, TSTF-359, Revision 9, Increase Flexibility in Mode Restraints.

Subsequent to issuance of the amendments, it was determined that an incorrect amendment number was used for Shearon Harris, Unit 1. The September 4, 2020, letter and enclosures listed Amendment No. 180 for Renewed Facility Operating License No. NPF-63. Amendment No. 179 is the number that should have been used.

Corrected amendment pages and corrected license and TS pages are enclosed. Change bars are added where corrected numbers appear in the corrected amendment pages. This correction is entirely editorial in nature (change only to amendment number for Shearon Harris) and does not change the NRC staffs previous conclusion in the safety evaluation issued September 4, 2020, nor does it affect the no significant hazards consideration as published in the Federal Register on May 19, 2020 (85 FR 29984).

S. Snider We apologize for any inconvenience caused. If you have any questions, please contact me at (301) 415-3867 or by e-mail to Michael.Mahoney@nrc.gov.

Sincerely,

/RA/

Michael Mahoney, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400

Enclosures:

1. Corrected amendment pages
2. Corrected license and TS pages cc: Ms. Kim Maza Site Vice President Shearon Harris Nuclear Power Plant Mail Code NHP01 5413 Shearon Harris Road New Hill, NC 27562-9300 Listserv

Enclosure 1 Corrected amendment pages

DUKE ENERGY PROGRESS, LLC DOCKET NO. 50-400 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 179 Renewed License No. NPF-63

1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Duke Energy Progress, LLC (the licensee),

dated February 6, 2020, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

Enclosure 3

2. Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-63 is hereby amended to read as follows:

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, as revised through Amendment No. 179, are hereby incorporated into this license. Duke Energy Progress, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3. This license amendment is effective as of the date of its issuance and shall be implemented within 90 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Michael T. Markley, Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Renewed License NPF-63 and Technical Specifications Date of Issuance: September 4, 2020

ATTACHMENT TO LICENSE AMENDMENT NO. 179 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 RENEWED FACILITY OPERATING LICENSE NO. NPF-63 DOCKET NO. 50-400 Replace the following page of the Renewed Facility Operating License with the revised page.

The revised page is identified by amendment number and contains a marginal line indicating the area of change:

Remove Insert Page 4 Page 4 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert 3/4 0-1 3/4 0-1 3/4 0-2 3/4 0-2 3/4 3-25 3/4 3-25 3/4 3-26 3/4 3-26 3/4 3-63 3/4 3-63 3/4 3-67 3/4 3-67 3/4 4-11 3/4 4-11 3/4 4-29 3/4 4-29 3/4 4-40 3/4 4-40 3/4 5-7 3/4 5-7 3/4 7-4 3/4 7-4 3/4 8-1 3/4 8-1

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION FOR AMENDMENT NO. 417 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-38 AMENDMENT NO. 419 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-47 AMENDMENT NO. 418 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-55 DUKE ENERGY CAROLINAS, LLC OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 DOCKET NOS. 50-269, 50-270, AND 50-287 AND AMENDMENT NO. 179 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-63 DUKE ENERGY PROGRESS, LLC SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-400

1.0 INTRODUCTION

By application dated February 6, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20041F551), Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC (Duke Energy or the licensee), requested changes to the Technical Specifications (TS) for Oconee Nuclear Station (Oconee), Units 1, 2, and 3, and Shearon Harris Nuclear Power Plant (Harris), Unit 1.

The proposed changes would modify TS requirements for mode change limitations in Limiting Condition for Operation (LCO) 3.0.4 and Surveillance Requirement (SR) 4.0.4 to adopt the provisions of Industry/Technical Specification Task Force (TSTF) traveler 359, Increase Flexibility in Mode Restraints. The availability of TSTF-359 for adoption by licensees was announced in the Federal Register on April 4, 2003 (68 FR 16579) as part of the Consolidated Improvement Process (CLIIP).

The TSTF-359, is one of the industrys initiatives under the risk-informed TS program. These initiatives are intended to maintain or improve safety while reducing unnecessary burden and to make TS requirements consistent with the U. S. Nuclear Regulatory Commissions (NRCs or Commissions) other risk-informed regulatory requirements, in particular, the Maintenance Rule.

Enclosure 5

Enclosure 2 Corrected license and TS pages

C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect, and is subject to the additional conditions specified or incorporated below.

(1) Maximum Power Level Duke Energy Progress, LLC, is authorized to operate the facility at reactor Core power levels not in excess of 2948 megawatts thermal (100 percent rated core power) in accordance with the conditions specified herein.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, as revised through Amendment No. 179, are hereby incorporated into this license. Duke Energy Progress, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3) Antitrust Conditions Duke Energy Progress, LLC. shall comply with the antitrust conditions delineated in Appendix C to this license.

(4) Initial Startup Test Program (Section 14)1 Any changes to the Initial Test Program described in Section 14 of the FSAR made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) within one month of such change.

(5) Steam Generator Tube Rupture (Section 15.6.3)

Prior to startup following the first refueling outage, Carolina Power & Light Company* shall submit for NRC review and receive approval if a steam generator tube rupture analysis, including the assumed operator actions, which demonstrates that the consequences of the design basis steam generator tube rupture event for the Shearon Harris Nuclear Power Plant are less than the acceptance criteria specified in the Standard Review Plan, NUREG-0800, at 15.6.3 Subparts II (1) and (2) for calculated doses from radiological releases. In preparing their analysis Carolina Power &

Light Company* will not assume that operators will complete corrective actions within the first thirty minutes after a steam generator tube rupture.

1The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.

  • On April 29, 2013, the name of Carolina Power & Light Company (CP&L) was changed to Duke Energy Progress, Inc. On August 1, 2015, the name Duke Energy Progress, Inc. was changed to Duke Energy Progress, LLC.

Renewed License No. NPF-63 Amendment No. 179

3/4.0 APPLICABILITY LIMITING CONDITION FOR OPERATION 3.0.1 Compliance with the Limiting Conditions for Operation contained in the succeeding specifications is required during the OPERATIONAL MODES or other conditions specified therein; except that upon failure to meet the Limiting Conditions for Operation, the associated ACTION requirements shall be met.

3.0.2 Noncompliance with a specification shall exist when the requirements of the Limiting Condition for Operation and associated ACTION requirements are not met within the specified time intervals. If the Limiting Condition for Operation is restored prior to expiration of the specified time intervals, completion of the ACTION requirements is not required unless otherwise noted in the ACTION statement.

3.0.3 When a Limiting Condition for Operation is not met, except as provided in the associated ACTION requirements, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> action shall be initiated to place the unit in a MODE in which the specification does not apply by placing it, as applicable, in:

a. At least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />,
b. At least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and
c. At least COLD SHUTDOWN within the subsequent 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Where corrective measures are completed that permit operation under the ACTION requirements, the action may be taken in accordance with the specified time limits as measured from the time of failure to meet the Limiting Condition for Operation.

Exceptions to these requirements are stated in the individual specifications.

This specification is not applicable in MODE 5 or 6.

3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:

a. When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time;
b. After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate; exceptions to this Specification are stated in the individual Specifications, or
c. When an allowance is stated in the individual value, parameter, or other Specification.

This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to 3.0.1 above for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.

3.0.6 When one or more required barriers are unable to perform their related support function(s), any supported system LCO(s) are not required to be declared not met solely for this reason for up to 30 days provided that at least one train or subsystem of the supported system is OPERABLE and supported by barriers capable of providing their related support function(s), and risk is assessed and managed. This specification may be concurrently applied to more than one train or subsystem of a multiple train or subsystem SHEARON HARRIS - UNIT 1 3/4 0-1 Amendment No. 179

APPLICABILITY LIMITING CONDITION FOR OPERATION (Continued) supported system provided at least one train or subsystem of the supported system is OPERABLE and the barriers supporting each of these trains or subsystems provide their related support function(s) for different categories of initiating events.

If the required OPERABLE train or subsystem becomes inoperable while this specification is in use, it must be restored to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or the provisions of this specification cannot be applied to the trains or subsystems supported by the barriers that cannot perform their related support function(s).

At the end of the specified period, the required barriers must be able to perform their related support function(s) or the supported system LCO(s) shall be declared not met.

SURVEILLANCE REQUIREMENTS 4.0.1 Surveillance Requirements shall be met during the OPERATIONAL MODES or other conditions specified for individual Limiting Conditions for Operation, unless otherwise stated in an individual Surveillance Requirement. Failure to meet a Surveillance Requirement, whether such failure is experienced during the performance of the surveillance or between performances of the surveillance, shall be failure to meet the LCO. Failure to perform a surveillance within the specified surveillance interval shall be failure to meet the LCO except as provided in SR 4.0.3. Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.

4.0.2 Each Surveillance Requirement shall be performed within the specified surveillance interval with a maximum allowable extension not to exceed 25% of the specified surveillance interval.

4.0.3 If it is discovered that a surveillance was not performed within its specified surveillance interval, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified surveillance interval, whichever is greater. This delay period is permitted to allow performance of the surveillance. The delay period is only applicable when there is a reasonable expectation the surveillance will be met when performed. A risk evaluation shall be performed for any surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.

If the surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable ACTION requirements must be met.

When the surveillance is performed within the delay period and the surveillance criteria are not met, the LCO must immediately be declared not met, and the applicable ACTION requirements must be met.

4.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCOs Surveillances have been met within their specified frequency, except as provided by SR 4.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.

This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

4.0.5 Deleted SHEARON HARRIS - UNIT 1 3/4 0-2 Amendment No. 179

TABLE 3.3-3 (Continued)

ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION MINIMUM TOTAL NO. OF CHANNELS CHANNELS APPLICABLE FUNCTIONAL UNIT CHANNELS TO TRIP OPERABLE MODES ACTION

8. Containment Spray Switch-over to Containment Sump (Continued)
b. RWST--Low Low See Item 7.b. above for all RWST--Low Low initiating functions and requirements.

Coincident With Containment Spray See Item 2 above for all Containment Spray initiating functions and requirements.

9. Loss-of-Offsite Power
a. 6.9 kV Emergency Bus--Undervoltage 3/bus 2/bus 2/bus 1, 2, 3, 4 15a Primary
b. 6.9 kV Emergency Bus--Undervoltage 3/bus 2/bus 2/bus 1, 2, 3, 4 15a Secondary
10. Engineered Safety Features Actuation System Interlocks
a. Pressurizer Pressure, P-11 3 2 2 1, 2, 3 20 Not P-11 3 2 2 1, 2, 3 20
b. Low-Low Tavg, P-12 3 2 2 1, 2, 3 20
c. Reactor Trip, P-4 2 2 2 1, 2, 3 22
d. Steam Generator Water Level, P-14 See Item 5.b. above for all P-14 initiating functions and requirements.

SHEARON HARRIS - UNIT 1 3/4 3-25 Amendment No. 179

TABLE 3.3-3 (Continued)

TABLE NOTATIONS

  1. Trip function may be blocked in this MODE below the P-11 (Pressurizer Pressure Interlock)

Setpoint.

    • During CORE ALTERATIONS or movement of irradiated fuel in containment, refer to Specification 3.9.9.
      • Trip function automatically blocked above P-11 and may be blocked below P-11 when Safety Injection on low steam line pressure is not blocked.

ACTION STATEMENTS ACTION 14 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; however, one channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1, provided the other channel is OPERABLE.

ACTION 15 - With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed until performance of the next required CHANNEL OPERATIONAL TEST provided the inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

ACTION 15a - With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed provided the inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. With less than the minimum channels OPERABLE, operation may proceed provided the minimum number of channels is restored within one hour, otherwise declare the affected diesel generator inoperable. When performing surveillance testing of either primary or secondary undervoltage relays, the redundant emergency bus and associated primary and secondary relays shall be OPERABLE.

ACTION 16 - With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed provided the inoperable channel is placed in the bypassed condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and the Minimum Channels OPERABLE requirement is met. One additional channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1.

ACTION 17 - With less than the Minimum Channels OPERABLE requirement, operation may continue provided the Containment Purge Makeup and Exhaust Isolation valves are maintained closed while in MODES 1, 2, 3 and 4 (refer to Specification 3.6.1.7). For MODE 6, refer to Specification 3.9.4.

ACTION 18 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SHEARON HARRIS - UNIT 1 3/4 3-26 Amendment No. 179

INSTRUMENTATION REMOTE SHUTDOWN SYSTEM LIMITING CONDITION FOR OPERATION 3.3.3.5.a The Remote Shutdown System monitoring instrumentation channels shown in Table 3.3-9 shall be OPERABLE.

3.3.3.5.b All transfer switches, Auxiliary Control Panel Controls and Auxiliary Transfer Panel Controls for the OPERABILITY of those components required by the SHNPP Safe Shutdown Analysis to (1) remove decay heat via auxiliary feedwater flow and steam generator power-operated relief valve flow from steam generators A and B, (2) control RCS inventory through the normal charging flow path, (3) control RCS pressure, (4) control reactivity, and (5) remove decay heat via the RHR system shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTION:

a. With the number of OPERABLE remote shutdown monitoring channels less than the Minimum Channels OPERABLE as required by Table 3.3-9, restore the inoperable channel(s) to OPERABLE status within 7 days, or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
b. With the number of OPERABLE remote shutdown monitoring channels less than the Total Number of Channels required by Table 3.3-9, restore the inoperable channels to OPERABLE status within 60 days or submit a Special Report in accordance with Specification 6.9.2 within 14 additional days.
c. With one or more inoperable Remote Shutdown System transfer switches, power, or control circuits required by 3.3.3.5.b, restore the inoperable switch(s)/circuit(s) to OPERABLE status within 7 days, or be in HOT STANDBY within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.3.3.5.1 Each remote shutdown monitoring instrumentation channel shall be demonstrated OPERABLE by performance of the CHANNEL CHECK and CHANNEL CALIBRATION operations at the frequencies shown in Table 4.3-6.

4.3.3.5.2 Each Remote Shutdown System transfer switch, power and control circuit and control switch required by 3.3.3.5.b, shall be demonstrated OPERABLE at the frequency specified in the Surveillance Frequency Control Program.

SHEARON HARRIS - UNIT 1 3/4 3-63 Amendment No. 179

INSTRUMENTATION ACCIDENT MONITORING INSTRUMENTATION LIMITING CONDITION FOR OPERATION least HOT STANDBY in the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

  • The alternate method shall be a check of safety valve piping temperatures and evaluation to determine position.
  1. The alternate method shall be the initiation of the backup method as required by Specification 6.8.4.d.

SURVEILLANCE REQUIREMENTS 4.3.3.6 Each accident monitoring instrumentation channel shall be demonstrated OPERABLE by performance of the CHANNEL CHECK and CHANNEL CALIBRATION at the frequencies shown in Table 4.3-7.

SHEARON HARRIS - UNIT 1 3/4 3-67 Amendment No. 179

REACTOR COOLANT SYSTEM 3/4.4.4 RELIEF VALVES LIMITING CONDITION FOR OPERATION 3.4.4 All power-operated relief valves (PORVs) and their associated block valves shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3 ACTION:

a. With one or more PORV(s) inoperable, because of excessive seat leakage, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> either restore the PORV(s) to OPERABLE status or close the associated block valve(s) with power maintained to the block valve(s); otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b. With one or more PORV(s) inoperable due to causes other than excessive seat leakage, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> either restore the PORV(s) to OPERABLE status or close the associated block valve(s) and remove power from the block valve(s), and
1. With only one safety grade PORV OPERABLE, restore at least a total of two safety grade PORVs to OPERABLE status within the following 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, or
2. With no safety grade PORVs OPERABLE, restore at least one safety grade PORV to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and follow ACTION b.1, above, with the time requirement of that ACTION statement based on the time of initial loss of the remaining inoperable safety grade PORV or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
c. With one or more block valve(s) inoperable, within 1 hour: (1) restore the block valve(s) to OPERABLE status, or close the block valve(s) and remove power from the block valve(s), or close the PORV and remove power from its associated solenoid valve; and (2) apply ACTION b.1 or b.2, above, as appropriate, for the isolated PORV(s).

SHEARON HARRIS - UNIT 1 3/4 4-11 Amendment No. 179

REACTOR COOLANT SYSTEM 3/4.4.8 SPECIFIC ACTIVITY LIMITING CONDITION FOR OPERATION 3.4.8 The specific activity of the reactor coolant shall be limited to:

a. Less than or equal to 1 microCurie per gram DOSE EQUIVALENT I-131, and
b. Less than or equal to 100/ microCuries per gram of gross radioactivity.

APPLICABILITY: MODES 1, 2, 3, 4, and 5.

ACTION:

MODES 1, 2 and 3*:

a. With the specific activity of the reactor coolant greater than 1 microCurie per gram DOSE EQUIVALENT I-131 for more than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> during one continuous time interval or exceeding 60.0 microCurie per gram DOSE EQUIVALENT I-131, be in at least HOT STANDBY with Tavg less than 500°F within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. LCO 3.0.4.c is applicable to DOSE EQUIVALENT I-131.
b. With the specific activity of the reactor coolant greater than 100/ microCuries per gram, be in at least HOT STANDBY with Tavg less than 500°F within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

MODES 1, 2, 3, 4, and 5:

With the specific activity of the reactor coolant greater than 1 microcurie per gram DOSE EQUIVALENT I-131 or greater than 100/ microCuries per gram, perform the sampling and analysis requirements of Item 4.a) of Table 4.4-4 until the specific activity of the reactor coolant is restored to within its limits.

SURVEILLANCE REQUIREMENTS 4.4.8 The specific activity of the reactor coolant shall be determined to be within the limits by performance of the sampling and analysis program of Table 4.4-4.

  • With Tavg greater than or equal to 500°F.

SHEARON HARRIS - UNIT 1 3/4 4-29 Amendment No. 179

REACTOR COOLANT SYSTEM OVERPRESSURE PROTECTION SYSTEMS LIMITING CONDITION FOR OPERATION 3.4.9.4 At least one of the following Overpressure Protection Systems shall be OPERABLE:

a. The Reactor Coolant System (RCS) depressurized with an RCS vent of greater than or equal to 2.9 square inches, or
  • b. Two power-operated relief valves (PORVs) with setpoints which do not exceed the limits established in Figure 3.4-4.

APPLICABILITY: MODE 4 when the temperature of any RCS cold leg is less than or equal to 325°F, MODE 5 and MODE 6 with the reactor vessel head on.

ACTION:


NOTE-----------------------------------------------------------

LCO 3.0.4.b is not applicable when entering MODE 4.

a. With one PORV inoperable in Mode 4, restore the inoperable PORV to OPERABLE status within 7 days or depressurize and vent the RCS through at least a 2.9 square inch vent within the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
b. With one PORV inoperable in MODES 5 or 6, either (1) restore the inoperable PORV to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or (2) complete depressurization and venting of the RCS through at least a 2.9 square inch vent within the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
c. With both PORVs inoperable, depressurize and vent the RCS through at least a 2.9 square inch vent within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.9.4.1 Each PORV shall be demonstrated OPERABLE by:

a. Performance of an ANALOG CHANNEL OPERATIONAL TEST on the PORV actuation channel, but excluding valve operation, within 31 days prior to
  • Credit may only be taken for the setpoints when the RCS cold leg temperature 90°F.

SHEARON HARRIS - UNIT 1 3/4 4-40 Amendment No. 179

EMERGENCY CORE COOLING SYSTEMS 3/4.5.3 ECCS SUBSYSTEMS - Tavg LESS THAN 350°F LIMITING CONDITION FOR OPERATION 3.5.3 As a minimum, one ECCS subsystem comprised of the following shall be OPERABLE:

a. One OPERABLE charging/safety injection pump,*
b. One OPERABLE RHR heat exchanger,
c. One OPERABLE RHR pump, and
d. An OPERABLE flow path capable of taking suction from the refueling water storage tank upon being manually realigned and transferring suction to the containment sump during the recirculation phase of operation.

APPLICABILITY: MODE 4.

ACTION:


NOTE-----------------------------------------------------------

LCO 3.0.4.b is not applicable to ECCS high head subsystem.

a. With no ECCS subsystem OPERABLE because of the inoperability of either the charging/safety injection pump or the flow path from the refueling water storage tank, restore at least one ECCS subsystem to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in COLD SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b. With no ECCS subsystem OPERABLE because of the inoperability of either the residual heat removal heat exchanger or RHR pump, restore at least one ECCS subsystem to OPERABLE status or maintain the Reactor Coolant System Tavg less than 350°F by use of alternate heat removal methods.
  • A maximum of one charging/safety injection pump shall be OPERABLE whenever the temperature of one or more of the RCS cold legs is less than or equal to 325°F.

SHEARON HARRIS - UNIT 1 3/4 5-7 Amendment No. 179

PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three independent steam generator auxiliary feedwater pumps and associated flow paths shall be OPERABLE with:

a. Two motor-driven auxiliary feedwater pumps, each capable of being powered from separate emergency buses, and
b. One steam turbine-driven auxiliary feedwater pump capable of being powered from an OPERABLE steam supply system.

APPLICABILITY: MODES 1, 2, and 3.

ACTION:


NOTE-----------------------------------------------------------

LCO 3.0.4.b is not applicable.

a. With one auxiliary feedwater pump inoperable, restore the required auxiliary feedwater pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b. With two auxiliary feedwater pumps inoperable, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
c. With three auxiliary feedwater pumps inoperable, immediately initiate corrective action to restore at least one auxiliary feedwater pump to OPERABLE status as soon as possible. (NOTE: LCO 3.0.3 and all other LCO Required Actions requiring MODE changes are suspended until one AFW train is restored to OPERABLE status.

Following restoration of one AFW train, all applicable LCOs apply based on the time the LCOs initially occurred.)

SURVEILLANCE REQUIREMENTS 4.7.1.2.1 Each auxiliary feedwater pump shall be demonstrated OPERABLE:

a. At the frequency specified in the Surveillance Frequency Control Program by:
1. Demonstrating that each motor-driven pump satisfies performance requirements by either:

a) Verifying each pump develops a differential pressure that (when temperature - compensated to 70°F) is greater than or equal to 1514 psid at a recirculation flow of greater than or equal to 50 gpm (25 KPPH),

or b) Verifying each pump develops a differential pressure that (when temperature - compensated to 70°F) is greater than or equal to 1259 psid at a flow rate of greater than or equal to 430 gpm (215 KPPH).

SHEARON HARRIS - UNIT 1 3/4 7-4 Amendment No. 179

3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a. Two physically independent circuits between the offsite transmission network and the onsite Class 1E distribution system, and
b. Two separate and independent diesel generators, each with:
1. A separate day tank containing a minimum of 1457 gallons of fuel,
2. A separate main fuel oil storage tank containing a minimum of 100,000 gallons of fuel, and
3. A separate fuel oil transfer pump.
c. Automatic Load Sequencers for Train A and Train B.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:


NOTE-----------------------------------------------------------

LCO 3.0.4.b is not applicable to diesel generators.

a. With one offsite circuit of 3.8.1.1.a inoperable:
1. Perform Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and
2. Restore the offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; and
3. Verify required feature(s) powered from the OPERABLE offsite A.C. source are OPERABLE. If required feature(s) powered from the OPERABLE offsite circuit are discovered to be inoperable at any time while in this condition, restore the required feature(s) to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from discovery of inoperable required feature(s) or declare the redundant required feature(s) powered from the inoperable A.C. source as inoperable.
b. With one diesel generator of 3.8.1.1.b inoperable:
1. Perform Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and
  1. Activities that normally support testing pursuant to 4.8.1.1.2.a.4, which would render the diesel inoperable (e.g., air roll), shall not be performed for testing required by this ACTION statement.

SHEARON HARRIS - UNIT 1 3/4 8-1 Amendment No. 179

ML20273A023 *via e-mail OFFICE NRR/DORL/LPL2-2/PM* NRR/DORL/LPL2-2/LA* NRR/DORL/LPL2-2/BC* NRR/DORL/LPL2-2/PM*

NAME MMahoney BAbeywickrama UShoop MMahoney DATE 10/01/2020 09/30/2020 10/08/2020 10/09/2020