Notice of Violation from Insp on 850701-0831.Violation Noted:Failure to Establish Document Control Procedures for Plant Drawings Undergoing Rev
ML20134D475
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/12/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20134D471 List:
References
50-285-85-15, NUDOCS 8508190238
Download: ML20134D475 (1)


See also: IR 05000701/2008031

Text

, . - -

APPENDIX A

NOTICE OF VIOLATION

Omaha Public Power District Docket: 50-285

Fort Calhoun Station License: DPR-40

During an NRC inspection conducted on July 1-August 31, 1985, a violation of

NRC requirements was identified. The violation involved a failure to establish

document control procedures for plant drawings undergoing revision. In

accordance with the 10

Enforcement Actions," " General

CFR PartStatement of CPolicy (and Procedure for NRC1985),theviol

2, Appendix

below:

A. Failure to Establish Document Control Procedures

10 CFR 50, Appendix B, Section VI, " Document Control," requires that

" measures . . . be established to control the issuance of documents, such

as . . . drawings, including changes thereto, which prescribe all

activities affecting quality. These measures shall assure that documents,

including changes, . . . are distributed to and used at the location where

the prescribed activity is performed."

Contrary to the above, the licensee failed to establish procedures to

control " marked up mechanical and electrical prints" contained in Safety

Related Design Change Order (SRDCO) packages approved by the System

Acceptance Committee under Step 5.8.5 of Standing Order G-21, " Station

Modification Control." The official drawings are not part of a drawing

control system that: (1) identifies changes in progress to a specific

drawing, and (2) makes the marked up (interim) drawings available to the

craftsmen. These marked up prints are the only documents containing

current information for use by plant personnel during " design document

updating" performed by Generating Station Engineering in accordance with

Step 6.1 of Standing Order G-21.

This is a Severity Level IV violation (Supplement 1.D) (50-285/8515-01).

Pursuant to the provisions of 10 CFR 2.201, Omaha Public Power District is

hereby required to submit to this Office, within 30 days of the date of this

j letter transmitting this Notice, a written statement or explanation in reply,

i including for each violation: (1) the reason for the violations if admitted,

l the' corrective steps which have been taken and the results achieved,

'

the corrective steps which will be taken to avoid further violations, and

l the date when full compliance will be achieved. Where good cause is shown,

-

consideration will be given to extending the response time.

l

.

l Dated at Arlington, Texas,

j this .t'ljs day of August,1985