|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20203F5261999-02-12012 February 1999 Notification of 990224 Meeting with ABB-Combustion Engineering in Rockville,Md to Discuss Proposed Improvements to Design of ABB-CE PWR Fuel.Draft Agenda Attached ML20203F7221999-02-12012 February 1999 Notification of 990224 Meeting with ABB-Combustion Engineering in Rockville,Md to Discuss Ongoing & Future Licensing Plans & Interactions Between ABB-CE & NRC ML20203F5311999-02-11011 February 1999 Notification of 990225 Meeting with ABB-Combustion Engineering in Rockville,Md to Discuss ABB-CE Crossflow Ultrasonic Flow Measurement Device ML20236Q6001998-06-25025 June 1998 Forwards ABB-CE Sys 80+ Std Design Fda Pursuant to 10CFR52, App O & Notice of Issuance of Fda Pursuant to 10CFR52,App O, Sys 80+ Std Design ABB-CE,Inc ML20137J9491997-04-0101 April 1997 Notification of 970402 Meeting W/Abb Combustion Engineering in Rockville,Md to Discuss Seismic Design Site Parameters for Sys 80+ Std Design ML20134D7641997-01-28028 January 1997 Notification of Cancellation of 970206 Meeting w/ABB-CE in Rockville,Md to Discuss ABB-CE Response to NRC 961001 RAI on Small Break LOCA Evaluation Model Topical Rept (CENPD-137) ML20135F5891996-12-0404 December 1996 Forwards Summary of 961114 Meeting W/Ceog in Rockville,Md to Discuss Topics of Mutual Interest ML20129F6551996-10-24024 October 1996 Notification of 961030 Meeting w/ABB-Combustion Engineering in Rockville,Md to Discuss ABB-CE Response to 961001 Request for Addl Info on Small LOCA Evaluation Model Topical Rept. Proposed Agenda Encl ML20129C3241996-10-21021 October 1996 Forwards Response to NEI Proposals Re Three Design Certification Issues NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20149E5131994-05-31031 May 1994 Informs That NRC in Process of Completing FSERs for Both GE Advanced BWR & ABB-CE Sys 80+ Designs.Safety Conclusions Will Need to Be Reassessed by Both NRC & Design Certification Applicants on Listed Issues ML20059K8051994-01-28028 January 1994 Notification of 940131 & 940201 Meetings w/ABB-CE in Rockville,Md to Review & Resolve Remaining Structural/ Geotechnical Design Issues of Nonnuclear Island Analysis & Design Calculations.Agenda Encl ML20059K8821994-01-28028 January 1994 Notification of 940131 Meeting w/ABB-CE in Rockville,Md to Discuss Boron Dilution During small-break loss-of-coolant Accidents ML20059L3181994-01-27027 January 1994 Notification of 940131 Meeting w/ABB-CE in Rockville,Md to Discuss Key PRA Insights & Assumptions for Sys 80+ Standard Plant Design ML20059K1771994-01-26026 January 1994 Notification of 940201 Meeting W/Senior Mgt in Rockville,Md to Discuss Status of Certification Review of ABB-CE Sys 80+ Design ML20059J1291994-01-25025 January 1994 Notification of 940126 Meeting W/Util in Rockville,Md to Discuss Remaining Technical Issues Re Sys 80+ Std Design ML20059J7861994-01-25025 January 1994 Notification of 940126 Meeting w/ABB-CE in Rockville,Md to Discuss Source Term & Ph Control for in-containment Refueling Water Storage ML20058P4371993-12-20020 December 1993 Notification of 931221 Meeting w/ABB-CE in Rockville,Md to Discuss New Source Term & Application for Environ Qualification of Plant Equipment ML20058K5771993-12-13013 December 1993 Notification of 931214-16 Meeting w/ABB-CE in Windsor,Ct to Discuss Bases for TS Section 3.3, Instrumentation for Sys 80+ ML20058H2171993-12-0707 December 1993 Notification of 931209 Meeting w/ABB-CE in Rockville,Md to Discuss Remaining Severe Accident Issues for System 80+ ML20058G9931993-12-0101 December 1993 Notification of 931214 Meeting W/Us Dept of Energy in Rockville,Md to Discuss Status of Advanced Reactor Reviews. Agenda Encl ML20058G5621993-11-30030 November 1993 Notification of 931201 Meeting w/ABB-CE in Rockville,Md to Discuss Sys 80+ Final Rept on Potential for Containment Bypass During SG Tube Rupture Event ML20058A6451993-11-18018 November 1993 Notifies of 931122 Meeting W/Abb C-E in Rockville,Md Re Status of Certification Review of Sys 80+ ML20062J8461993-11-15015 November 1993 Notification of 911117 Meeting w/ABB-CE in Rockville,Md to Discuss NRC & Contractor Comments on TS for Instrumentation Proposed for Sys 80+ in Section 16.6 of CESSAR-DC ML20058A2181993-11-0909 November 1993 Notification of 931129 Meeting W/Licensee in Rockville,Md to Discuss Credit for Boron in SFP ML20059K2781993-11-0909 November 1993 Notification of 931110 Meeting w/ABB-CE in Rockville,Md to Review Status of Structural/Geotechnical Design Issues for Sys 80+.Tentative Agenda Encl ML20059B4851993-10-26026 October 1993 Notification of 931027 Meeting w/ABB-CE in Rockville,Md to Discuss Sys 80+ Fuel Design Under Tier 1,Tier 2 & Tier 2* Provisions ML20059B5001993-10-25025 October 1993 Notification of 931028 Meeting w/ABB-CE in Rockville,Md to Discuss Status of Certification Review of Sys 80+ ML20057F2611993-10-12012 October 1993 Notification of 931028 & 29 Meetings w/ABB-CE in Charlotte, Nc to Discuss Sys 80+ Nuclear Island Design Audit ML20057E1441993-10-0505 October 1993 Notification of 931022 Meeting w/C-E in Windsor,Ct to Discuss NRC & Contractors Comments on TS for Instrumentation Proposed for Sys 80+ in Section 16.6 of CESSAR-DC ML20057E1501993-10-0505 October 1993 Notification of 931021 Meeting w/C-E in Windsor,Ct to Discuss Comments of NRC Staff & Contractor on Software Program Manual for Sys 80+ ML20058N1441993-10-0505 October 1993 Notification of 931012 & 13 Meetings w/C-E in Boston,Ma to Audit Sys 80+ Non-nuclear Island Category I Structures Analysis & Design ML20057E0191993-09-30030 September 1993 Discusses CE Request for Exemption from Compliance W/Nrc Metrication Policy Re ABWR Design Certification, Specifically Exemption from Performing Conversion to SI or Providing Dual Units in Design Certification Rule Documents ML20057D7301993-09-28028 September 1993 Notification of 931006-07 Meeting w/ABB-CE in Windsor,Ct to Review Status of Steel Containment Vessel Buckling Analysis for ABB-CE Sys 80+ ML20057D0831993-09-24024 September 1993 Notification of 930924 Meeting w/ABB-CE in Windsor,Ct to Discuss Staff Comments on Tier 1 Design Certification Material for CE Sys 80+ Design ML20057C5401993-09-23023 September 1993 Notification of 931004 Meeting w/ABB-CE in Windsor,Ct to Discuss Closure of Issues of Final SER on CE Sys 80+ PRA ML20057B1121993-09-14014 September 1993 Notification of 930916 Meeting w/ABB-CE in Rockville,Md to Discuss ABB-CE Evaluation of Potential Design Alternatives to Cope W/Containment Bypass Event During SG Tube Rupture ML20056G0501993-08-25025 August 1993 Notification of 930902 Meeting W/Abb C-E in Windsor,Ct to Discuss Progress on Issue Closure for Pra.Proposed Agenda Encl ML20056G6341993-08-18018 August 1993 Forwards Info Transmitted & Received for ABB-CE System 80+ Std Plant Design Certification ML20056E0961993-08-17017 August 1993 Notification of 930818 Meeting w/C-E in Rockville,Md to Review Status of Safeguards Review for Sys 80+.Proposed Meeting Agenda Encl ML20057D1151993-08-16016 August 1993 Notification of 931005 Meeting w/DOE,ABB-CE & GE in Rockville,Md to Discuss Design Certification Reviews. Meeting Cancelled ML20056E0921993-08-16016 August 1993 Notification of 931005 Mgt Meeting W/Doe in Rockville,Md to Discuss Status of Design Certification Reviews ML20056E5291993-08-0505 August 1993 Submits Daily Highlight Re 930812 Meeting w/ABB-CE in Rockville,Md to Review Staff Comments Re ABB-CE Nuplex 80+ Stds ML20056E4001993-07-29029 July 1993 Submits Daily Highlights Re Rescheduled 930809 Meeting to 930816 in Rockville,Md to Discuss ABB-CE Evaluation of Potential Design Alternatives to Cope W/Containment Bypass Event During SGTR ML20056D7131993-07-27027 July 1993 Notification of 930728 Meeting w/ABB-CE in Rockville,Md to Discuss & Review Calculations for Resistance to Sliding & Overturning of Steel Containment & Internals Under Seismic Event Conditions ML20128N6751993-02-19019 February 1993 Notification of 930222 Meeting w/ABB-CE in Rockville,Md to Discuss CE Sys 80+ Design to Resolve Interfacing Sys LOCA Issue ML20128N6171993-02-12012 February 1993 Notification of 930217-18 Meeting w/ABB-CE in Charlotte,Nc to Discuss Status of Severe Accident Issues for Sys 80+ Std Design.Proposed Agenda Encl ML20128G0501993-02-0909 February 1993 Notification of 930211-12 Meeting w/ABB-CE in Charlotte,Nc to Discuss Status of Industry Review of Sys 80+ ITAAC ML20127N1931993-01-26026 January 1993 Forwards Draft ITAAC for Human Factors Engineering ML20127L7611993-01-22022 January 1993 Notification of 930208 Meeting w/ABB-CE in Rockville,Md to Discuss Sys 80+ leak-before-break Methodology Application 1999-02-12
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20203F5261999-02-12012 February 1999 Notification of 990224 Meeting with ABB-Combustion Engineering in Rockville,Md to Discuss Proposed Improvements to Design of ABB-CE PWR Fuel.Draft Agenda Attached ML20203F7221999-02-12012 February 1999 Notification of 990224 Meeting with ABB-Combustion Engineering in Rockville,Md to Discuss Ongoing & Future Licensing Plans & Interactions Between ABB-CE & NRC ML20203F5311999-02-11011 February 1999 Notification of 990225 Meeting with ABB-Combustion Engineering in Rockville,Md to Discuss ABB-CE Crossflow Ultrasonic Flow Measurement Device ML20236Q6001998-06-25025 June 1998 Forwards ABB-CE Sys 80+ Std Design Fda Pursuant to 10CFR52, App O & Notice of Issuance of Fda Pursuant to 10CFR52,App O, Sys 80+ Std Design ABB-CE,Inc ML20137J9491997-04-0101 April 1997 Notification of 970402 Meeting W/Abb Combustion Engineering in Rockville,Md to Discuss Seismic Design Site Parameters for Sys 80+ Std Design ML20134D7641997-01-28028 January 1997 Notification of Cancellation of 970206 Meeting w/ABB-CE in Rockville,Md to Discuss ABB-CE Response to NRC 961001 RAI on Small Break LOCA Evaluation Model Topical Rept (CENPD-137) ML20135F5891996-12-0404 December 1996 Forwards Summary of 961114 Meeting W/Ceog in Rockville,Md to Discuss Topics of Mutual Interest ML20129F6551996-10-24024 October 1996 Notification of 961030 Meeting w/ABB-Combustion Engineering in Rockville,Md to Discuss ABB-CE Response to 961001 Request for Addl Info on Small LOCA Evaluation Model Topical Rept. Proposed Agenda Encl ML20129C3241996-10-21021 October 1996 Forwards Response to NEI Proposals Re Three Design Certification Issues NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20149E5131994-05-31031 May 1994 Informs That NRC in Process of Completing FSERs for Both GE Advanced BWR & ABB-CE Sys 80+ Designs.Safety Conclusions Will Need to Be Reassessed by Both NRC & Design Certification Applicants on Listed Issues ML20059K8051994-01-28028 January 1994 Notification of 940131 & 940201 Meetings w/ABB-CE in Rockville,Md to Review & Resolve Remaining Structural/ Geotechnical Design Issues of Nonnuclear Island Analysis & Design Calculations.Agenda Encl ML20059K8821994-01-28028 January 1994 Notification of 940131 Meeting w/ABB-CE in Rockville,Md to Discuss Boron Dilution During small-break loss-of-coolant Accidents ML20059L3181994-01-27027 January 1994 Notification of 940131 Meeting w/ABB-CE in Rockville,Md to Discuss Key PRA Insights & Assumptions for Sys 80+ Standard Plant Design ML20059K1771994-01-26026 January 1994 Notification of 940201 Meeting W/Senior Mgt in Rockville,Md to Discuss Status of Certification Review of ABB-CE Sys 80+ Design ML20059J1291994-01-25025 January 1994 Notification of 940126 Meeting W/Util in Rockville,Md to Discuss Remaining Technical Issues Re Sys 80+ Std Design ML20059J7861994-01-25025 January 1994 Notification of 940126 Meeting w/ABB-CE in Rockville,Md to Discuss Source Term & Ph Control for in-containment Refueling Water Storage ML20058P4371993-12-20020 December 1993 Notification of 931221 Meeting w/ABB-CE in Rockville,Md to Discuss New Source Term & Application for Environ Qualification of Plant Equipment ML20058K5771993-12-13013 December 1993 Notification of 931214-16 Meeting w/ABB-CE in Windsor,Ct to Discuss Bases for TS Section 3.3, Instrumentation for Sys 80+ ML20058H2171993-12-0707 December 1993 Notification of 931209 Meeting w/ABB-CE in Rockville,Md to Discuss Remaining Severe Accident Issues for System 80+ ML20058G9931993-12-0101 December 1993 Notification of 931214 Meeting W/Us Dept of Energy in Rockville,Md to Discuss Status of Advanced Reactor Reviews. Agenda Encl ML20058G5621993-11-30030 November 1993 Notification of 931201 Meeting w/ABB-CE in Rockville,Md to Discuss Sys 80+ Final Rept on Potential for Containment Bypass During SG Tube Rupture Event ML20058A6451993-11-18018 November 1993 Notifies of 931122 Meeting W/Abb C-E in Rockville,Md Re Status of Certification Review of Sys 80+ ML20062J8461993-11-15015 November 1993 Notification of 911117 Meeting w/ABB-CE in Rockville,Md to Discuss NRC & Contractor Comments on TS for Instrumentation Proposed for Sys 80+ in Section 16.6 of CESSAR-DC ML20058A2181993-11-0909 November 1993 Notification of 931129 Meeting W/Licensee in Rockville,Md to Discuss Credit for Boron in SFP ML20059K2781993-11-0909 November 1993 Notification of 931110 Meeting w/ABB-CE in Rockville,Md to Review Status of Structural/Geotechnical Design Issues for Sys 80+.Tentative Agenda Encl ML20059B4851993-10-26026 October 1993 Notification of 931027 Meeting w/ABB-CE in Rockville,Md to Discuss Sys 80+ Fuel Design Under Tier 1,Tier 2 & Tier 2* Provisions ML20059B5001993-10-25025 October 1993 Notification of 931028 Meeting w/ABB-CE in Rockville,Md to Discuss Status of Certification Review of Sys 80+ ML20057F2611993-10-12012 October 1993 Notification of 931028 & 29 Meetings w/ABB-CE in Charlotte, Nc to Discuss Sys 80+ Nuclear Island Design Audit ML20057E1441993-10-0505 October 1993 Notification of 931022 Meeting w/C-E in Windsor,Ct to Discuss NRC & Contractors Comments on TS for Instrumentation Proposed for Sys 80+ in Section 16.6 of CESSAR-DC ML20058N1441993-10-0505 October 1993 Notification of 931012 & 13 Meetings w/C-E in Boston,Ma to Audit Sys 80+ Non-nuclear Island Category I Structures Analysis & Design ML20057E1501993-10-0505 October 1993 Notification of 931021 Meeting w/C-E in Windsor,Ct to Discuss Comments of NRC Staff & Contractor on Software Program Manual for Sys 80+ ML20057E0191993-09-30030 September 1993 Discusses CE Request for Exemption from Compliance W/Nrc Metrication Policy Re ABWR Design Certification, Specifically Exemption from Performing Conversion to SI or Providing Dual Units in Design Certification Rule Documents ML20057D7301993-09-28028 September 1993 Notification of 931006-07 Meeting w/ABB-CE in Windsor,Ct to Review Status of Steel Containment Vessel Buckling Analysis for ABB-CE Sys 80+ ML20057D0831993-09-24024 September 1993 Notification of 930924 Meeting w/ABB-CE in Windsor,Ct to Discuss Staff Comments on Tier 1 Design Certification Material for CE Sys 80+ Design ML20057C5401993-09-23023 September 1993 Notification of 931004 Meeting w/ABB-CE in Windsor,Ct to Discuss Closure of Issues of Final SER on CE Sys 80+ PRA ML20057B1121993-09-14014 September 1993 Notification of 930916 Meeting w/ABB-CE in Rockville,Md to Discuss ABB-CE Evaluation of Potential Design Alternatives to Cope W/Containment Bypass Event During SG Tube Rupture ML20057D1801993-09-14014 September 1993 Staff Requirements Memo Suggesting NRC Continue Discussions W/Acrs on Generic RM & Monitor Progress of Reviews of Passive Designs ML20056G0501993-08-25025 August 1993 Notification of 930902 Meeting W/Abb C-E in Windsor,Ct to Discuss Progress on Issue Closure for Pra.Proposed Agenda Encl ML20056G6341993-08-18018 August 1993 Forwards Info Transmitted & Received for ABB-CE System 80+ Std Plant Design Certification ML20056E0961993-08-17017 August 1993 Notification of 930818 Meeting w/C-E in Rockville,Md to Review Status of Safeguards Review for Sys 80+.Proposed Meeting Agenda Encl ML20057D1151993-08-16016 August 1993 Notification of 931005 Meeting w/DOE,ABB-CE & GE in Rockville,Md to Discuss Design Certification Reviews. Meeting Cancelled ML20056E0921993-08-16016 August 1993 Notification of 931005 Mgt Meeting W/Doe in Rockville,Md to Discuss Status of Design Certification Reviews ML20056E5291993-08-0505 August 1993 Submits Daily Highlight Re 930812 Meeting w/ABB-CE in Rockville,Md to Review Staff Comments Re ABB-CE Nuplex 80+ Stds ML20056E4001993-07-29029 July 1993 Submits Daily Highlights Re Rescheduled 930809 Meeting to 930816 in Rockville,Md to Discuss ABB-CE Evaluation of Potential Design Alternatives to Cope W/Containment Bypass Event During SGTR ML20056D7131993-07-27027 July 1993 Notification of 930728 Meeting w/ABB-CE in Rockville,Md to Discuss & Review Calculations for Resistance to Sliding & Overturning of Steel Containment & Internals Under Seismic Event Conditions ML20128N6751993-02-19019 February 1993 Notification of 930222 Meeting w/ABB-CE in Rockville,Md to Discuss CE Sys 80+ Design to Resolve Interfacing Sys LOCA Issue ML20128N6171993-02-12012 February 1993 Notification of 930217-18 Meeting w/ABB-CE in Charlotte,Nc to Discuss Status of Severe Accident Issues for Sys 80+ Std Design.Proposed Agenda Encl ML20128G0501993-02-0909 February 1993 Notification of 930211-12 Meeting w/ABB-CE in Charlotte,Nc to Discuss Status of Industry Review of Sys 80+ ITAAC ML20127N1931993-01-26026 January 1993 Forwards Draft ITAAC for Human Factors Engineering 1999-02-12
[Table view] |
Text
-. ~ .- --.__ . . . . . ,.m . . ..
[( (x , , '
.dhlfhiYN e,t :
s p..n 8: .a: NUCLEAR REGULATORY COMMISSION- .
71 ii WASHINGTON, D, C 20665 - f k....+ j _ December-.22, 1992-a J
. Docket No. 52-002- _
MEM0'RANDUM FOR: Robert C. Pierson, Director
. Standardization Project-Directorate Associate Directorate for Advanced Reactors and License: Renewal Office of Nuclear Reactor Regulation-FROM: Michael X. Franovich, Project Manager Standardization Project-Directorate Associate Directorate for Advanced Reactors and License Renewal-Offlce of Nuclear Reactor- Regulation r
SUBJECT:
- NOTICE OF MEETING WITH'ABB-COMBUSTION-ENGINEERING.
-(ABB-CE) FOR SYSTEM 80+ (SHUTDOWN RISK EVALUATION)- .
DATE AND TIME: January _ 5,-1993'(1 p.m. p.m.);
January 6- 1993 (8 a.m. - 5 p.m.)
^
LOCATION: ABB-Combustion Engineering,_Inc. _
- 1000 Prospect Hill Road Windsor, Connecticut 3 PURPOSE
- -- To discuss the_. System 80+ Shutdown Risk Evalaution Report.
Am.
_m ,
~
- dshD m Lid DC,j j dj bQp y.
E -240010 L .
}
J c9212300402 921222-PDR-'ADOCK 05200002> ,
0k =
j P, _.
PDR -- 1-
n lb, December 22l1992-PARTICIPANTS *:-. NE ABB-CE A. El-Bassioni N. Saltos :S. Ritterbusch D. Diec M. Franovich -J.-Rezendes M. Waterman S. Sun R. Ivamy-M. Rubin T. Wambach M. Volodzko i J. Kupinos E. Seigmann (Original signed by)
Michael X. Franovich, Project Manager Standardization Project Directorate .
Associate Directorate for Advanced' Reactors
.and License Renewal Office of Nuclear Reactor Regulation
Enclosure:
Proposed Agenda cc w/ enclosure:
.See next page
- Meetings between the NRC technical staff and applicants or licensees-are-open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reoister 28058, 6/28/78.
Members of the public who wish to attend should contact me at '
(301) 504-1121.
DISTRLEUTION:
Docket File PDST:R/F .TMurley/FMiraglia WRussell' NRC PDR; ~D Crutchfield WTravers- JNWilson
- RPierson TVWambach RBorchardt: JTBoyce
- AEl-Bassioni MXFranovich PShea JMoore, 15B18-
- EJordan, MNBB 3701 >GGrant, EDO _ ACRS (10) OPA NRR Mailroom, 12G18 P0' Dell, PMAS NSaltos, 10E4. MPRubin,".8E23
- SSun,;8E23 ._ MWaterman, 8M7 _P0iec, 8E23 RJones, 8E23
~ JLyons; 801_ RBarrett, 801 OFC: LA:PDST:ADAR PM:PDST:ADAR SC:PDSf:ADAR NAME: PShea:tzgJt -MFqahich RBohardt-DATE: 12/S?/92 127I /92 -12/.12./92 l0FFICIAL DOCUMENT COPY: CMTG0105.MXF
~
t
vv
^ '
O P
ABB-Combustion Engineering, Inc. Docket No.52-002
- cc: Mr. C. 8. Brinkman, Acting Director Nuclear Systems Licensing Combustion Engineering, Inc.
1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Mr. C. B. Brinkman, Manager-Washington Nuclear 0perations Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville,-Maryland- 20852 Mr. Stan Ritterbusch
. Nuclear Systems Licensing Combustion Engineering, Inc.
1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. Daniel F. Giessing U. S. Department of Energy NE-42 Washington, D.C. 20585 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.
Washington, D.C. 20503 Mr. Raymond Ng 1776 Eye Street, N.W.
Suite 300 Washington, D.C. 20006
l.' h =
! PROPOSED AGENDAi NRC. AND ABB-CE MEETING
+
ON SHUTDOWN RISK- -
-Windsor, CT (January 5. and '6,: 1993) - -
Januarv 5.1993 (1 p.m. - 5 p.m.)
-(1) . Overview of Shutdown Risk Evaluation (ABB-CE Presentation):
- Overview of System 80+ shutdown process
_ , - Overview comparison of System 80+ and' operating CE plant-design features that minimize shutdown risk-
- Shutdown PRA development -
-(2) Discussion of PRA Questions from the'Probabilistic Safety Assessment Branchi n
- PRA questions _1 through 33
- SRXB questions 440.176 (3) Summary of Action Items and Commitments January 6.1993 (8 a.m. - 9:45 a.m.) _
_(3) Discussion ofI&C Questions from Instrumentation 'and Controls Branch
- I&C question 1 through 7-
- SRXB questions 440.157-159 y o.
n i ,
o ;
' Enclosure _.
i
[-1 3: R w a
' (9:45 a.m. - 12 p.m.)
.(4) Discussion of Dr.terministic _ Questions from Reactor Systems Branch Electrical power availability during different stages of shutdown conditions, (i.e. mid-loop operations with water level less than 23 feet above the vessel flange) and related RAls Alternate residual heat removal capability and related RAls -
Inventory and control and related RAls (12 p.m. - 1 p.m.) LUNCH (1 p.m. - 4 p.m.)
(5) Continued Discussion on SRXB Questions:
Reactivity control and related RAIs Shutdown vulnerability resulting from new design features (failure mode and effect analysis)
LOCA in modes other than power operations and related RAls Outage planning and controls and related RAls I Residual heat removal capability and related R.Als (4 p.m. - 5 p.m.) :
(6) Shutdown Cooling System ITAAC-Shutdown related ITAAC Tier 1 items (e.g., SCS flow rates, piping configurations and valves to support gravity, SCS nozzle and piping ,
, interface, vortex breakers,...) j J
l (7) Summary of Action Items and Commitments -l l
1
< .;