ML20127J313

From kanterella
Revision as of 02:57, 10 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Meeting Repts 50-460/85-01 & 50-508/85-01 Re Proposed Readiness Review Program on 850522
ML20127J313
Person / Time
Site: Satsop, Washington Public Power Supply System
Issue date: 06/07/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20127J317 List:
References
NUDOCS 8506260549
Download: ML20127J313 (2)


See also: IR 05000460/1985001

Text

_ _ _ _ _ - _ _ _ .__ - _ _ _ _ _ _ . _ _ - __ . _ _ _ _ _ _ _ _ _ _

'

. .

[ .

JUfl 7 1985

Docket Nos. 50-460 and 50-508

Washington Public Power Supply System

P. O. Box 968

3000 George Washington Way

Richland, Washingtou 99352

Attention: D. W. Mazur

Managing Director

This refers to your meeting with representatives of Region V, Nuclear Reactor

Regulation, And Inspection and Enforcement in Walnut Creek on May 22, 1985,

,

regarding your proposed Readiness Review program for Supply System Nuclear

Project Nos. I and 3 as described in the attached report and handout.

In accordance with 10 CFR 2.790 (a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this meeting report, we will be glad

to discuss them with you.

Sincerely,

'

I i

D. F. Kirsch, Acting Director

Division Reactor Safety & Projects

Region V

cc:w/ enclosure:

R. B. Glasocock, WPPSS

A. D. Kohler, WPPSS

R. W. P.oot, WPPSS

f, 7, M Garvin, WPPSS

. ,j G. T. Ankrum, IE

r

pp/j

c f)>F.J.Miraglia,NRR

g

B. K. Singh, NRR

e

bec:

RSB/ Document Control Desk (RIDS)

Mr. Martin

State of WA (Curtis Eschels)

Resident Inspector

(

RV: z

Do is Kir ch

6/f785 6/y/85

0506260549 050607

PDR ADOCK 05000460

0 pon f

.IEat 4

_ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ . _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _

. .

JUN 71985

Docket Nos. 50-460 and 50-508

Washington Public Power Supply System

P. O. Box 968

3000 George. Washington Way

Richland, Washington; 99352 -

Attention: D. W. Mazur

Managing Director

This refers to your meeting with representatives of Region V, Nuclear Reactor

Regulation, And Inspection and Enforcement in Walnut Creek on May 22, 1985,

regarding your proposed Readiness Review program for Supply System Nuclear

Project Nos. l'and 3 as' described in the , attached report and handout.

Inaccordan'cewith.1d'CFR2.790(a),acopy[ofthisletterandtheenclosure

will be placed intthe NRC Public Document' Room.

3

'

. Should you have any questions concerning this meeting report, we will be glad

to discuss them with you. ,

,

, ,

'

Sincerely,

W

'

>

D. F. Kirsch, Acting Director

' Division Reactor Safety & Projects

Region V

cc:w/ enclosure: ,

R. B. Glasscock, WPPSS

A. D. Kohler, WPPSS

R. W. Root, WPPSS

L. J.-Garvin, WPPSS

G. T. Ankrum, IE

F. J. Miraglia, NRR

B. K. Singh, NRR

bec:

RSB/ Document Control Desk (RIDS)

Mr. Martin

.

State of WA (Curtis Eschels)

Resident Inspector

RV: az

Dodds Kirsch

6/ /85 6/ /85

4 . .