Forwards Safety Evaluation of Info Submitted to Date Re Operability of Containment Purge & Vent Valves.Info Demonstrates Ability of 20-inch & 24-inch Purge & Vent Valves to Close Against Buildup of Pressure During Dba/Loca
ML20129E106
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 07/01/1985
From: Vassallo D
Office of Nuclear Reactor Regulation
To: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20129E111 List:
References
NUDOCS 8507160733
Download: ML20129E106 (2)


Text

_ - _ _ _

. *a,*

July 1, 1985 Docket No. 50-333 DISTRIBUTION W Docket File; Mr. John C. Brons NRC PDR Senior Vice President - Local PDR Nuclear Generation ORB #2 Reading Power Authority of the State HThompson of New York OELD 123 Main Street SNorris White Plains, New York 10601 HAbelson ELJordan

Dear Mr. Brons:

JPartlow BGrimes

SUBJECT:

CONTAINMENT VENT AND PURGE VALVE OPERABILITY ACRS (10)

Gray File

.Re: James A. FitzPatrick Nuclear Power Plant RWright KDempsey We have completed our review of the information submitted to date regarding operability of containment purge and vent valves at the James A. FitzPatrick facility. Our review concludes that this information demonstrates the ability of the 20-inch and 24-inch purge and vent valves to close against the buildup of containment pressure in the event of a DBA/LOCA. This conclusion is based upon the limitation of opening angle equal to or less than 40 for valves 27 A0V-111, 27 A0V-112, 27 A0V-113, and equal to er less than 50 for valves 27 A0V-114, 27 A0V-115, 27 A0V-116, 27 A0V-117 and 27 A0V-118. These valves are equipped with mechanical stops to limit the opening angle.

We request that you submit revised Technical Specifications to reflect the above opening angle limitations and, for valves 27 A0V-115, 27 A0V-116, 27 A0V-117 and 27 A0V-118, a closing time of less than or equal to 8 seconds.

We have also completed our related review of the radiological consequences of a DBA/LOCA during containment purging at FitzPatrick and find that the applicable dose guidelines of 10 CFR Part 100 would be met.

Copies of our Safety Evaluations which support the above conclusions are enclosed.

Sincerely, Original signed by MGrotenhuis for/

Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing

Enclosures:

As stated cc w/ enclosures: /

See next page DL:0RB#2 D 2 DL:0RB#2 SNoMs HA)elson ./40Vassallo 10(/1/85 A6/I/85 / pfr/ g /85 7 q 8507160733 850701 PDR ADOCK 05000333 P PDR

Mr. John C. Brons James A. FitzPatrick Nuclear Power Authority of the State of New York Power Plant CC: 1 Mr. Charles M. Pratt Mr. Jay Dunkleberger Assistant General Counsel Division of Policy Analysis  :

Power Authority of the State and Planning of New York New York State Energy Office 10 Columbus Circle Agency Building 2 New York, New York 10019 Empire State Plaza Albany, New York 12223 Resident Inspector's Office Thomas A. Murley U. S. Nuclear Regulatory Commission Regional Administrator Post Office Box 136 Region I Office Lycoming, New York 13093 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. A. Klausman Mr. Harold Glovier Vice President - Quality Assurance Resident Manager Power Authority of the State James A. FitzPatrick Nuclear of New York Power Plant 10 Columbus Circle Post Office Box 41 New York, New York 10019 Lycoming, New York 13093 Mr. J. A. Gray, Jr. Mr. George Wilverding, Chairman Director - Nuclear Licensing - BWR Safety Review Committee Power Authority of the State Power Authority of the State of New York of New York 123 Main Street 123 Main Street White Plains, New York 10601 White Plains, New York 10601 Mr. Robert P. Jones, Supervisor Town of Scriba R. D. #4 Oswego, New York 13126 Mr. Leroy W. Sinclair Power Authority of the State of New York 10 Columbus Circle New York, New York 10019 Mr. M. C. Cosgrove Quality Assurance Superintendent James A. FitzPatrick Nuclear Power Plant Post Office Box 41 Lycoming, New York 13093

,