Forwards Insp Rept 50-440/96-13 on 961007-11.No Violations Noted
ML20129K122
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/05/1996
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Myers L
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20129K124 List:
References
NUDOCS 9611080167
Download: ML20129K122 (2)


See also: IR 05000440/1996013

Text

N

t

s

November 5, 1996

Mr. Lew W. Myers

Vice President - Nuclear -

- Centerior Service Company

P.O.' Box 97, A200

Perry, OH .44081

~ SUBJECT: . NRC ROUTINE RADIATION PROTECTION INSPECTION REPORT NO.

50-440/96013(DRS)

Dear Mr. Myers:

This refers to the inspection conducted by Ms. K. Selburg and Mr. P. Louden of this office

on October 7-11,1996, of activities authorized for your Perry Nuclear Power Plant, Unit 1,

.

..f acility. The focus of this inspection was on your radiation protection program. At the

conclusion of the inspection, the findings were discussed with those members of your

staff identified in the enclosed report.

.

Areas examined during the inspection are identified in the report. Within these areas, the

inspection consisted of selective examinations of procedures, representative records and  ;

'

interviews with personnel.

Several good ALARA initiatives were used during the refueling outage, including the use of  !

temporary shielding, system and component flushing, and chemical decontaminations I

which contributed to significant dose savings. The initial outage planning incorporated the ]

ALARA principle and was effective in planning dose estimates which accurately '

represented actual work. However, when conflicts in the outage schedule were

encountered, contingency planning was weak in reevaluating new ALARA challenges,

caused by a delay in the chemical decontamination of the reactor recirculation system.

The inspectors also noted that poor planning and pre-job briefing in a non-outage job  !

contributed to workers spending more time than necessary in a high radiation area.

No violations of NRC requirements were identified during the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter

and the enclosures will be placed in the NRC Public Document Room.

l

9611000167 961105

PDR ADOCK 05000440

g

e em ,

i r

.

. .. - _ . . - .. . .- - -.

v

s

November 5, 1996

L. W. Myers 2

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original Signed by Brent Clayton (for)

Geoffrey E. Grant, Director

Division of Reactor Safety

Docket No. 50-440

Enclosure: Inspection Report No.

50-440/96013(DRS)

cc w/ encl: J. P. Stetz, Senior Vice

President - Nuclear

L. W. Worley, Director, Nuclear

Services Department

J. D. Kloosterman, Manager,

Regulatory Affairs

W. R. Kanda, Director, Perry

Nuclear Assurance Department

N. L. Bonner, Director, Perry

Nuclear Engineering Department

H. Ray Caldwell, General Superintendent

Nuclear Operations

R. D. Brandt, General Manager Operations

Terry L. Lodge, Esq.

State Liaison Officer, State of Ohio

Robert E. Owen, Ohio Department of Health

C. A. Glazer, State of Ohio

Public Utilities Commission

Distribution:

Docket File w/enci DRS w/enct A. B. Beach, Ritl w/ encl

PUBLIC4ted w/ encl Rlli PRR w/enci Enf. Coordinator, Rlli w/enci

OC/LFDCB w/enct SRI, Perry w/enci CAA1 (E-mail) w/enci

DRP w/enct LPM, NRR w/ enc! W. L. Axelson, Rlll w/enci

DOCUMENT NAME: G:DRS\PER96013.DRS

To receive a copy of this document, indicate in the box "C" = Copy w/o attach /enci "E" = Copy w/ attach /enci *N" = No copy

0FFICE RIII l6 Rill ,, l , Rlll l RIII lc

NAME

[ur ,

on/gg

DATE 10/Jl /9V .M/ / /96 / 1 0/4 /96 " 10/r /96

0FFICIAL RECORD COPt