ML20133G714

From kanterella
Revision as of 04:07, 4 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 4 to SER for Early Defueling of TMI-2 Reactor Vessel. SER Revised to Incorporate Responses to NRC Comments & to Reflect Boration of Defueling Sys Hydraulic Fluid
ML20133G714
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 10/10/1985
From: Standerfer F
GENERAL PUBLIC UTILITIES CORP.
To: Snyder B
Office of Nuclear Reactor Regulation
Shared Package
ML20133G718 List:
References
0334A, 334A, 4410-85-L-0200, 4410-85-L-200, NUDOCS 8510160096
Download: ML20133G714 (1)


Text

GPU Nuclear Corporation e

g gf Post Office Box 480 Route 441 South Middletcwn, Pennsylvania 17057 0191 717 944-7621 TELEX 84 2386 Writer's Direct Dial Number:

(717) 948-8461 4410-85-L-0200 Document ID 0334A Octooer 10, 1985 TMI Program Office Attn: Dr. B. J. Snyder Program Director US Nuclear Regulatory Commission Washington, DC 20555

Dear Dr. Snyder:

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Operating License No. OPR-73 Docket No. 50-320 Early Defueling Safety Evaluation Repot t - Revision 4 Attached for your review is Revision 4 to the Early Defueling Safety Evaluation Report (SER). The SER has been revised to incorporate responses to NRC comments. The SER has also been revised to reflect boration of the defueling system hydraulic fluid.

Sincerely, f, I v,_

. R. Standerfer Vice President / Director, TMI-2 FRS/RBS/eml Attacnment cc: Deputy Program Director - TMI Program Office, Dr. W. D. Travers 1 l

8510160096gSdOO 20 ADOCK PDR PDR ((

P j

'll l GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation l l L I