MONTHYEARML20217K3161999-10-19019 October 1999 Forwards Amend 195 to License DPR-61 & Safety Evaluation. Amend Deletes Certain TSs Either No Longer Applicable to Permanently Shutdown & Defueled State of Reactor or Duplicate Regulatory Requirements CY-99-137, Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam1999-10-12012 October 1999 Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam DD-99-11, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 9910041999-10-0808 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 991004 ML20212L1261999-10-0404 October 1999 Forwards Viewgraphs Presented by Licensee at 990923 Meeting with Nrc,In Response to Request ML20212D0341999-09-20020 September 1999 Expresses Appreciation for Accepting NRC Request for Tour of Haddam Neck Facility During on 991014.Invites R Mellor to Participate in NRC 1999 Decommissioninng Power Reactor Work- Shop:Nrc Insp Program at Decommissioning Power Reactors CY-99-111, Submits Clarification of Changes Made to Connecticut Yankee QA Program,Per Util 990810 Submittal.Change Will Be Submitted to NRC in Dec 1999 as Part of Annual Update1999-09-0202 September 1999 Submits Clarification of Changes Made to Connecticut Yankee QA Program,Per Util 990810 Submittal.Change Will Be Submitted to NRC in Dec 1999 as Part of Annual Update ML20211E8051999-08-20020 August 1999 Forwards Insp Rept 50-213/99-02 on 990420-0719.No Violations Noted.Completion of Corrective Actions for Spent Fuel Bldg Ventilation Issues Adequate ML20210J6021999-08-0202 August 1999 Informs That Info Re Orise Technical Survey Assistance to NRC at CT Yankee Is to Include Copies of Listed Documents CY-99-048, Forwards Cyap Rept CY-HP-0031,Rev 0, Bounding Dose Assessment for Offsite Radioactive Matls1999-07-29029 July 1999 Forwards Cyap Rept CY-HP-0031,Rev 0, Bounding Dose Assessment for Offsite Radioactive Matls CY-99-066, Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors1999-07-20020 July 1999 Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors ML20210C1491999-07-0101 July 1999 Responds to ,Which Responded to NRC Ltr & NOV & Informs That Engagement in Any Similar Wrongdoing in Future May Result in More Significant Enforcement Action. No Further Action Will Be Taken at This Time ML20209C3911999-06-30030 June 1999 Forwards TS Page 6-3 for Haddam Neck Plant ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195F9011999-06-0909 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 50-213/98-06 on 990226. Util Did Not Agree with Disposition of Issue Cited as Severity Level IV Violation.Violation Will Be Noncited ML20195H3591999-06-0202 June 1999 Responds to NRC Re Violations Noted in Insp of License DPR-61.Corrective Actions:Disciplinary Actions Were Taken by Util Against Jm Foley & Individual & Departmental Emphasis Is Placed on New HP Stds & Expectations ML20207E9031999-06-0202 June 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Mt Masnik Will Be Section Chief for Haddam Neck.Organization Chart Encl ML20207B9301999-05-25025 May 1999 Responds to 990114 Correspondence Re Changes to Plant Defueled Physical Security Plan Rev 1 Submitted Under 10CFR50.54(p).Implementation of Changes Subj to Insp to Confirm Changes Have Not Decreased Security Plan ML20207G1761999-05-21021 May 1999 Forwards Insp Rept 50-213/99-01 on 980119-990419 & Closure of CAL 1-97-010.No Violations Noted.Conduct of Activities Associated with Control of Radiological Work at Haddam Neck Generally Characterized as Careful & Thorough ML20206R7221999-05-12012 May 1999 Refers to Investigation 1-97-031 on 970616-0718 & Forwards Nov.Investigation Found That Recipient Deliberately Did Not Follow Radiation Protection Procedures,Falsified Documents & Provided Incomplete & Inaccurate Info to NRC ML20206R7021999-05-12012 May 1999 Refers to Investigation 1-97-008 Conducted by Region I & Forwards Notice of Violation.Investigation Found That Recipient Deliberately Attempted to Conceal Release of Contaminated Video Equipment ML20206R8051999-05-12012 May 1999 Responds to 3 Investigations,Repts 1-97-031,008 & 1-98-008 Between 970314 & 980722 as Well as Insp Conducted Between 980720 & 1102.Forwards Synopsis of 3rd OI Investigation ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders CY-99-057, Forwards 1998 Annual Radioactive Effluent Rept for HNP, & Rev 10 to Remodcm. with Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents,As Well as Summary of Assessment of Max Individual Dose1999-04-30030 April 1999 Forwards 1998 Annual Radioactive Effluent Rept for HNP, & Rev 10 to Remodcm. with Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents,As Well as Summary of Assessment of Max Individual Dose ML20206C8631999-04-28028 April 1999 Forwards Amend 194 to License DPR-61 & Safety Evaluation. Amend Authorizes Relocation of Requirements Related to Seismic Monitoring Instrumentation from TSs to Technical Requirements Manual ML20206A6871999-04-22022 April 1999 Informs of Completion of Review of Re Nepco in Capacity as Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee Atomic Power Co ML20210V5221999-04-0808 April 1999 Discusses Continued Performance of Technical Assistance Activities for NRC & Environ Survey & Site Assessment Program (Essap) Survey Assistance at Cy IR 05000213/19960121999-04-0505 April 1999 Discusses NRC Insp Repts 50-213/96-12 & 50-213/98-04 on 961102-27 Re Airborne Radioactivity Contamination Event That Occurred in Fuel Transfer Canal & Reactor Cavity in Nov 1996.Notice of Violation Encl ML20205J7931999-04-0505 April 1999 Discusses NRC Insp Repts 50-213/96-12 & 50-213/98-04 on 961102-27 Re Airborne Radioactivity Contamination Event That Occurred in Fuel Transfer Canal & Reactor Cavity in Nov 1996.Notice of Violation Encl CY-99-042, Provides Info on Status of Decommissioning Funding for Haddam Neck Plant1999-03-31031 March 1999 Provides Info on Status of Decommissioning Funding for Haddam Neck Plant ML20206A6951999-03-29029 March 1999 Request Confirmation That No NRC Action or Approval,Required Relative to Proposed Change in Upstream Economic Ownership of New England Power Co,Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee CY-99-024, Responds to Violations Noted in Insp Rept 50-213/98-06. Corrective Actions:Meetings Were Held with Contractor Mgt, Disciplinary Action Against Worker Was Taken & Notices Alerting Workers to HRA Controls Were Posted1999-03-29029 March 1999 Responds to Violations Noted in Insp Rept 50-213/98-06. Corrective Actions:Meetings Were Held with Contractor Mgt, Disciplinary Action Against Worker Was Taken & Notices Alerting Workers to HRA Controls Were Posted B17697, Notifies NRC of Amount of Property Insurance Coverage, Effective 990401,for HNP & Mnps,Units 1,2 & 3,per Provisions of 10CFR50.54(w)1999-03-12012 March 1999 Notifies NRC of Amount of Property Insurance Coverage, Effective 990401,for HNP & Mnps,Units 1,2 & 3,per Provisions of 10CFR50.54(w) CY-99-032, Clarifies Info Re TRM Change Submitted with Re Proposed Rev to TSs on Seismic Monitoring1999-03-0909 March 1999 Clarifies Info Re TRM Change Submitted with Re Proposed Rev to TSs on Seismic Monitoring ML20207B6641999-02-26026 February 1999 Forwards Insp Rept 50-213/98-06 on 981103-990118 & Notice of Violation Re Locked High Radiation Area Doors That Were Found Unlocked by Staff.Security Program Was Also Inspected ML20204C6901999-02-22022 February 1999 Informs That Public Citizen Waives Copyright for 5th Edition of Nuclear Lemon So NRC May Reproduce for Purpose of Contributing to NRC Recommended Improvements to Oversight Process for Nuclear Power Reactors ML20203H9621999-02-17017 February 1999 Responds to to Dk Rathbun Which Forwarded Number of Questions from Constituent Re Spent Fuel Decommissioned Nuclear plants.NUREG-1628, Staff Responses to Frequently Asked Questions Re Decommissioning of NPPs Encl.W/O Encl CY-99-005, Responds to NRC 981221 RAI Re Amend 193 to License to Reflect Permanent Shutdown Condition of Plant.Licensee Withdrawing 981030 (CY-98-199) Request & Will Submit Corrections in Future Proposed Rev to TS1999-01-29029 January 1999 Responds to NRC 981221 RAI Re Amend 193 to License to Reflect Permanent Shutdown Condition of Plant.Licensee Withdrawing 981030 (CY-98-199) Request & Will Submit Corrections in Future Proposed Rev to TS CY-99-023, Provides Summary of Understandings Reached During 990108 Meeting Between Util & CT Dept of Environ Protection Re Dike Area Rainwater Reporting Protocol1999-01-28028 January 1999 Provides Summary of Understandings Reached During 990108 Meeting Between Util & CT Dept of Environ Protection Re Dike Area Rainwater Reporting Protocol ML20203H9711999-01-21021 January 1999 Requests Response to Concerns Raised by Constitutent M Marucci Re Spent Fuel at Decommissioned Nuclear Plants CY-99-002, Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl1999-01-18018 January 1999 Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl CY-99-010, Provides Special Rept Concerning Potential of Radiation Exposure Due to Hypothetical Explosive Attack to Facility. Without Encl1999-01-14014 January 1999 Provides Special Rept Concerning Potential of Radiation Exposure Due to Hypothetical Explosive Attack to Facility. Without Encl CY-99-009, Forwards Rev 1 to Haddam Neck Plant Defueled Physical Security Plan,Per 10CFR50.54(p).Rev Does Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 & 2.7901999-01-14014 January 1999 Forwards Rev 1 to Haddam Neck Plant Defueled Physical Security Plan,Per 10CFR50.54(p).Rev Does Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 & 2.790 ML20206R6051999-01-11011 January 1999 Ack Receipt of Submiting Sf Mgt Plan.Staff Has Reviewed Plan & Notes Plan to Store Sf in SFP Until DOE Takes Physical Possession of Fuel DD-98-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-98-12 Has Expired.Decision Became Final Agency Action on 981211. with Certificate of Svc.Served on 9812221998-12-22022 December 1998 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-98-12 Has Expired.Decision Became Final Agency Action on 981211. with Certificate of Svc.Served on 981222 CY-98-142, Forwards Proposed Rev 2 of Cyap QAP for Info & Approval of Exception Number 8 of App E of Cy Qap.Copy of Rev 2 Showing Changes from Rev 1 Also Included1998-12-22022 December 1998 Forwards Proposed Rev 2 of Cyap QAP for Info & Approval of Exception Number 8 of App E of Cy Qap.Copy of Rev 2 Showing Changes from Rev 1 Also Included ML20198R1321998-12-21021 December 1998 Forwards Insp Rept 50-213/98-05 on 980720-1102.No Violations Noted.Insp Completes Review of Licensee Actions Described in ,In Response to NOV & Proposed Imposition of Civil Penalties ML20198K8651998-12-21021 December 1998 Ack Receipt of ,Requesting Corrected Pages to Be Issued for License Amend 193,issued on 980630.Informs That Inconsistencies Found When Comparing Corrected Pages Submitted on 981030 & License Amend Application CY-98-201, Provides Clarification of NRC Staff SE for Amend 193 Which Approved HNP Defueled TSs1998-12-0303 December 1998 Provides Clarification of NRC Staff SE for Amend 193 Which Approved HNP Defueled TSs IR 05000213/19980041998-11-27027 November 1998 Forwards Special Insp Rept 50-213/98-04 of Licensee Performance During Reactor Coolant Sys Chemical Decontamination ML20195J3571998-11-19019 November 1998 Forwards Exemption from Certain Requirements of 10CFR50.54(w) & 10CFR140.Exemption Submitted in Response to 971007 Application & Suppls & 1218,requesting Reduction in Amount of Insurance Required for Facility 1999-09-20
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARCY-99-137, Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam1999-10-12012 October 1999 Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam CY-99-111, Submits Clarification of Changes Made to Connecticut Yankee QA Program,Per Util 990810 Submittal.Change Will Be Submitted to NRC in Dec 1999 as Part of Annual Update1999-09-0202 September 1999 Submits Clarification of Changes Made to Connecticut Yankee QA Program,Per Util 990810 Submittal.Change Will Be Submitted to NRC in Dec 1999 as Part of Annual Update CY-99-048, Forwards Cyap Rept CY-HP-0031,Rev 0, Bounding Dose Assessment for Offsite Radioactive Matls1999-07-29029 July 1999 Forwards Cyap Rept CY-HP-0031,Rev 0, Bounding Dose Assessment for Offsite Radioactive Matls CY-99-066, Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors1999-07-20020 July 1999 Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors ML20209C3911999-06-30030 June 1999 Forwards TS Page 6-3 for Haddam Neck Plant ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195H3591999-06-0202 June 1999 Responds to NRC Re Violations Noted in Insp of License DPR-61.Corrective Actions:Disciplinary Actions Were Taken by Util Against Jm Foley & Individual & Departmental Emphasis Is Placed on New HP Stds & Expectations CY-99-057, Forwards 1998 Annual Radioactive Effluent Rept for HNP, & Rev 10 to Remodcm. with Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents,As Well as Summary of Assessment of Max Individual Dose1999-04-30030 April 1999 Forwards 1998 Annual Radioactive Effluent Rept for HNP, & Rev 10 to Remodcm. with Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents,As Well as Summary of Assessment of Max Individual Dose ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders ML20210V5221999-04-0808 April 1999 Discusses Continued Performance of Technical Assistance Activities for NRC & Environ Survey & Site Assessment Program (Essap) Survey Assistance at Cy CY-99-042, Provides Info on Status of Decommissioning Funding for Haddam Neck Plant1999-03-31031 March 1999 Provides Info on Status of Decommissioning Funding for Haddam Neck Plant ML20206A6951999-03-29029 March 1999 Request Confirmation That No NRC Action or Approval,Required Relative to Proposed Change in Upstream Economic Ownership of New England Power Co,Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee CY-99-024, Responds to Violations Noted in Insp Rept 50-213/98-06. Corrective Actions:Meetings Were Held with Contractor Mgt, Disciplinary Action Against Worker Was Taken & Notices Alerting Workers to HRA Controls Were Posted1999-03-29029 March 1999 Responds to Violations Noted in Insp Rept 50-213/98-06. Corrective Actions:Meetings Were Held with Contractor Mgt, Disciplinary Action Against Worker Was Taken & Notices Alerting Workers to HRA Controls Were Posted B17697, Notifies NRC of Amount of Property Insurance Coverage, Effective 990401,for HNP & Mnps,Units 1,2 & 3,per Provisions of 10CFR50.54(w)1999-03-12012 March 1999 Notifies NRC of Amount of Property Insurance Coverage, Effective 990401,for HNP & Mnps,Units 1,2 & 3,per Provisions of 10CFR50.54(w) CY-99-032, Clarifies Info Re TRM Change Submitted with Re Proposed Rev to TSs on Seismic Monitoring1999-03-0909 March 1999 Clarifies Info Re TRM Change Submitted with Re Proposed Rev to TSs on Seismic Monitoring ML20204C6901999-02-22022 February 1999 Informs That Public Citizen Waives Copyright for 5th Edition of Nuclear Lemon So NRC May Reproduce for Purpose of Contributing to NRC Recommended Improvements to Oversight Process for Nuclear Power Reactors CY-99-005, Responds to NRC 981221 RAI Re Amend 193 to License to Reflect Permanent Shutdown Condition of Plant.Licensee Withdrawing 981030 (CY-98-199) Request & Will Submit Corrections in Future Proposed Rev to TS1999-01-29029 January 1999 Responds to NRC 981221 RAI Re Amend 193 to License to Reflect Permanent Shutdown Condition of Plant.Licensee Withdrawing 981030 (CY-98-199) Request & Will Submit Corrections in Future Proposed Rev to TS ML20203H9711999-01-21021 January 1999 Requests Response to Concerns Raised by Constitutent M Marucci Re Spent Fuel at Decommissioned Nuclear Plants CY-99-002, Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl1999-01-18018 January 1999 Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl CY-99-009, Forwards Rev 1 to Haddam Neck Plant Defueled Physical Security Plan,Per 10CFR50.54(p).Rev Does Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 & 2.7901999-01-14014 January 1999 Forwards Rev 1 to Haddam Neck Plant Defueled Physical Security Plan,Per 10CFR50.54(p).Rev Does Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 & 2.790 CY-99-010, Provides Special Rept Concerning Potential of Radiation Exposure Due to Hypothetical Explosive Attack to Facility. Without Encl1999-01-14014 January 1999 Provides Special Rept Concerning Potential of Radiation Exposure Due to Hypothetical Explosive Attack to Facility. Without Encl CY-98-142, Forwards Proposed Rev 2 of Cyap QAP for Info & Approval of Exception Number 8 of App E of Cy Qap.Copy of Rev 2 Showing Changes from Rev 1 Also Included1998-12-22022 December 1998 Forwards Proposed Rev 2 of Cyap QAP for Info & Approval of Exception Number 8 of App E of Cy Qap.Copy of Rev 2 Showing Changes from Rev 1 Also Included CY-98-201, Provides Clarification of NRC Staff SE for Amend 193 Which Approved HNP Defueled TSs1998-12-0303 December 1998 Provides Clarification of NRC Staff SE for Amend 193 Which Approved HNP Defueled TSs CY-98-191, Provides Notification That Util Implemented Defueled Emergency Plan for HNP on 981001.Util Completed Annual Exercise Required by Subj Plan & 10CFR50.471998-11-0505 November 1998 Provides Notification That Util Implemented Defueled Emergency Plan for HNP on 981001.Util Completed Annual Exercise Required by Subj Plan & 10CFR50.47 CY-98-140, Provides Commitment to Maintain Water Chemistry Requirements in HNP Technical Requirements Manual1998-11-0202 November 1998 Provides Commitment to Maintain Water Chemistry Requirements in HNP Technical Requirements Manual CY-98-183, Forwards Revised License Amend 193 TS Pages to Correct Amend Number on Pages Not Changed by Amend 193.No Commitments Contained within Ltr1998-10-30030 October 1998 Forwards Revised License Amend 193 TS Pages to Correct Amend Number on Pages Not Changed by Amend 193.No Commitments Contained within Ltr CY-98-199, Forwards Listing of Corrections Made & Revised Pages for Proposed License Amend 193.Ltr Also Transmits Repaginated Pages for TS Index & Section 1,per Request of NRC Project Manager1998-10-30030 October 1998 Forwards Listing of Corrections Made & Revised Pages for Proposed License Amend 193.Ltr Also Transmits Repaginated Pages for TS Index & Section 1,per Request of NRC Project Manager CY-98-062, Updates Info of Historical Nature in Response to Both NRC Historical Review Rept & NRC Insp Rept 50-213/97-11 Open Items1998-10-28028 October 1998 Updates Info of Historical Nature in Response to Both NRC Historical Review Rept & NRC Insp Rept 50-213/97-11 Open Items CY-98-154, Forwards Sf Mgt Plan for Haddam Neck Plant.Plan Submits Info on Mgt & Funding for Program to Safely Store Sf Following Permanent Cessation of Power Operations Until Title Is Transferred to DOE1998-10-28028 October 1998 Forwards Sf Mgt Plan for Haddam Neck Plant.Plan Submits Info on Mgt & Funding for Program to Safely Store Sf Following Permanent Cessation of Power Operations Until Title Is Transferred to DOE CY-98-129, Provides Supplemental Info to 980629 Response to 2.206 Petition Questions on Spent Fuel Cooling Methods.Util Pending Commitment Made within Ltr Stated1998-10-14014 October 1998 Provides Supplemental Info to 980629 Response to 2.206 Petition Questions on Spent Fuel Cooling Methods.Util Pending Commitment Made within Ltr Stated CY-98-186, Provides Notification of Organizational Changes Which Affect Cyap.Organization Chart,Biographical Profile of K Heider & Revised Distribution List for NRC Correspondence,Encl1998-10-0202 October 1998 Provides Notification of Organizational Changes Which Affect Cyap.Organization Chart,Biographical Profile of K Heider & Revised Distribution List for NRC Correspondence,Encl CY-98-153, Forwards Final Response to NRC 961009 RAI Re Configuration Mgt Project at Plant.No New Commitments Made within Ltr or Attachment1998-09-30030 September 1998 Forwards Final Response to NRC 961009 RAI Re Configuration Mgt Project at Plant.No New Commitments Made within Ltr or Attachment CY-98-157, Responds to NRC Request That Cyap Submit Proposed License Amend to Include Fuel Storage Pool Water Chemistry Program within Haddam Neck Plant Ts.Cyap Considers That Amend Is Not Necessary for Listed Reasons.Procedure Encl1998-09-28028 September 1998 Responds to NRC Request That Cyap Submit Proposed License Amend to Include Fuel Storage Pool Water Chemistry Program within Haddam Neck Plant Ts.Cyap Considers That Amend Is Not Necessary for Listed Reasons.Procedure Encl B17440, Corrects Errors in Ltrs & 980225 Re semi-annual Fitness for Duty Performance Data for Jan-June 1998 & July-Dec 19971998-09-24024 September 1998 Corrects Errors in Ltrs & 980225 Re semi-annual Fitness for Duty Performance Data for Jan-June 1998 & July-Dec 1997 CY-98-151, Responds to NRC Re Violations Noted in Insp Rept 50-213/98-03.Corrective Actions:Root Cause Team Has Determined That Shift Managers Initial Reportability Decision Was Not Correct1998-09-21021 September 1998 Responds to NRC Re Violations Noted in Insp Rept 50-213/98-03.Corrective Actions:Root Cause Team Has Determined That Shift Managers Initial Reportability Decision Was Not Correct ML20153G3891998-09-14014 September 1998 Informs That Union of Concerned Scientists Fully Supports Citizens Awareness Network Petition Filed Pursuant to 10CFR2.206,seeking to Revoke or Suspend License for Haddam Neck Nuclear Plant ML20154J9861998-09-11011 September 1998 Forwards for Service Upon Lj Callan,Jc Hoyle & Commission, Request for NRC to Revoke Connecticut Yankee Atomic Power Co License to Operate Haddam Neck Reactor Pursuant to 10CFR2.206 ML20154J9991998-09-11011 September 1998 Requests NRC Take Immediate Action to Revoke Util License to Operate Haddam Neck Nuclear Power Station Pursuant to 10CFR2.206 B17420, Forwards Semiannual fitness-for-duty Performance Data for Jan-June 1998,per 10CFR26.71(d)1998-08-31031 August 1998 Forwards Semiannual fitness-for-duty Performance Data for Jan-June 1998,per 10CFR26.71(d) CY-98-107, Forwards Decommissioning Cost Study for Connecticut Yankee Nuclear Power Plant. Adjustments to Cost Estimate Will Be Made as Necessary as Detailed Work Planning Progresses & Elements of Cost Estimate Periodically Reviewed & Updated1998-08-25025 August 1998 Forwards Decommissioning Cost Study for Connecticut Yankee Nuclear Power Plant. Adjustments to Cost Estimate Will Be Made as Necessary as Detailed Work Planning Progresses & Elements of Cost Estimate Periodically Reviewed & Updated B17384, Submits fitness-for-duty Program Rept for Investigations Re Unsatisfactory Performance Test Results,Per 10CFR26,App a, Subpart B,Section 2.8(e)(4).No New Commitments Are Contained in Ltr1998-08-20020 August 1998 Submits fitness-for-duty Program Rept for Investigations Re Unsatisfactory Performance Test Results,Per 10CFR26,App a, Subpart B,Section 2.8(e)(4).No New Commitments Are Contained in Ltr CY-98-141, Requests Postponement of Defueled Emergency Plan Exercise Until 980923.Ltr Contains No New Commitments1998-08-13013 August 1998 Requests Postponement of Defueled Emergency Plan Exercise Until 980923.Ltr Contains No New Commitments CY-98-145, Provides Remediation Plans for Offsite Location 9621.Work Associated W/Location 9621 Scheduled to Begin on 9808171998-08-13013 August 1998 Provides Remediation Plans for Offsite Location 9621.Work Associated W/Location 9621 Scheduled to Begin on 980817 CY-98-132, Provides NRC W/Addl Info on Plant Defueled Emergency Plan. Util Stores Resin Liners Inside Area Protected by Vehicle Barriers1998-07-31031 July 1998 Provides NRC W/Addl Info on Plant Defueled Emergency Plan. Util Stores Resin Liners Inside Area Protected by Vehicle Barriers CY-98-127, Provides Clarifying Info Re Spent Fuel Pool make-up Capability at Hnp.Conclusions Reached by NRC Staff in SER Contained in Issuance of License Amend 193 Not Impacted & & Remain Valid1998-07-30030 July 1998 Provides Clarifying Info Re Spent Fuel Pool make-up Capability at Hnp.Conclusions Reached by NRC Staff in SER Contained in Issuance of License Amend 193 Not Impacted & & Remain Valid CY-98-118, Informs NRC Staff That Rev 38 to Plant Emergency Plan Has Been Implemented1998-07-21021 July 1998 Informs NRC Staff That Rev 38 to Plant Emergency Plan Has Been Implemented CY-98-121, Responds to NRC Request for Addl Info on Recent Operational Events at Plant.Corrective Actions That Have Been Taken, Discussed1998-07-16016 July 1998 Responds to NRC Request for Addl Info on Recent Operational Events at Plant.Corrective Actions That Have Been Taken, Discussed ML20151Z0221998-07-10010 July 1998 Informs That R Bassilakis & Gejdenson Share Same Concerns Re Recent Incidents at Connecticut Yankee Reactor in Haddam Neck,Ct & Hope That NRC Address Concerns Promptly ML20236P0971998-07-0909 July 1998 Inquires About Truth of Cyap Having No Shift Compliment of Licensed Operators at Haddam Neck Reactor ML20239A0651998-07-0707 July 1998 Discusses 980620 Inadvertent Radwaste Discharge from Plant Reactor.Team of NRC Inspectors,Completely Independent of Region I,Requested to Investigate Region I Ability to Regulate Effectively 1999-09-02
[Table view] |
Text
. . . _ . - _ - . . __ . _ . _ _ _ __.
1 From: PAUL M. BLANCH <PMBLANCH@ix.netcom.com>
i To: John Zwolinski <JAZ@nrc. gov >
Date: 7/31/96 6:46pm
Subject:
CY PROBLEMS 7/31/96 John A. Zwolinski, Deputy Director Division of Reactor Projects -L/II Office of Nuclear Reactor Regu'ation Washington, DC 20555-0001 John:
The following letter was received today by reaular mail. "he only editing I did was to remove the author - 89s name and address. I will be interested in seeing your response to his concerns.
Sincerely, Paul M. Blanch
! 135 Hyde Rd.
West Hartford CT. 06117 860-236-0326 4
)
. l I
i 9611010158 961024 PDR ORG NRRA PDR
7/31/96 J Wayne D. Lanning Director - Millstone Oversight Team Nuclear Regulatory Commission 475 Allendale Road KingofPrussia,PA19406 J
SUBJECT:
SAFETY CONCERNS AT CONNECTICUT YANKEE The purpose of this letter is to clarify the safety concerns identified in the information package I sent to you on 7/10/96. 1 identified three safety l concerns in the package. ;
which
" The first concern is a system that isinvolved required the toReactor Vessel safely shut down Level the Indication plant in theSystem,t even of a loss oT reactor coolant. NRC Regulatory Guide 1.97 requires the system to provide redundant monitoring from the top of the reactor core to the top of the reac;or vessel.
3 l The way the technical specifications are written at CY most of the indication j is allowed to be lost with no corrective action reguired. When one indicator is lost it is like driving at night with one headlight you can still see.
i At CY in, the late 1980's and early 1990's, both orimary,and backup indicators t were lost at several locations from the top of the core to the top of the vessel. It was like driving at night with no headlichts. CY responded by changing the emergency procedures to use alternate Tess accurate indication.
i It was like telling the operators to hold a flashlight out the car window.
4 Although it was questionable whether there was enough indication to handle a loss of reactor coolant accident, this was not my concern. My concern was it seemed to take months to hand the operators a i
after the lights flashlight. The went changeout,tried I to make in 1992 would reguire a timelv update
. of the emergency procedures when critical indication is lost. This change should be implemented before the plant restarts.
The second safety concern involves the technical specifications for eleven reactor trip setpoints. Concerns about the quality of the setpoint
, calculations were raised in the mid 1980's
! According to the latest industry guidelines, for butcalculating were ignored until 1994.
setpoints the i setpoint allowable values in a number of the CY technical specificatio,ns are Steam i
not valid. The invalid values Steam include: RCSLowFlowReactorTrip[PSCRe/
Line Break Flcw Reactor Trip v Feed actor i
2 Flow Mismatch Hi Pressurizer Level Reactor Trio, Reactor Trip HCP Reactor Trip POR9 Actuation Trip, Core Deluge Actuation, RHR Valve Permiss,ive, NIS Power Ran,ge Permissive, f7 &
P8 Permissives.
The present operations manager at CY suppressed these concerns for years by ignoring them when he was the plant instrumentation mana er. When I raised the concerns to him personally in a 1994 meeting, he sim ly claimed the setpoints were safe, and refused to discuss the reasons hey might be unsafe.
An automobile comparison would be like a town manager refusing to review speed limits to the latest safety standards. Assume a car stops 50 feet on dry pavement after you apply the brakes. If new safety information comes wt that says you should leave an additional 25 feet for adverse road conditions, and an additional 25 feet for the driver to react then you should allow 50 + 25 +
- 4. 25 = 100 feet of stopping distance to be safe,. The present CY allowable i values are based on 50 feet. CY should correct the technical specifications, and have NRC approval of the changes before they continue to operate.
The improper allowable values leads to the final safety concern. It is not 1
i possible to do pr per safety evaluations with improper allowable values. When instrument error such as drift' is checked during shutdown at CY it is sometimes found o tside the lim ts calculated to be safe, limits r,eferred to i
3 as the acceptance criteria. This is common at all plants and has happened hundreds of times at CY. The concern is when this happens at CY there is no method in place to evaluate whether safety limits were violated,,and whether a setpoint change is needed to ensure safe ' operation in the future.
assume the CY setpoints have been u To uselatest to the *.he automobile safety standards, analogy and again, leave 100 feet for the car to stop.pdated The
- procedures still say the brakes should stop the car in 50 feet, which is fine.
NowassumewhenbrakinkionmethodatCYdistance feet. With the evalua theyiswo checked, it is sometimes found sincetowe be 80 we have 20 feet to spare"uld say: Wrong.
"no If problem,d you nee 80 feet have 100 feet for brakin 25tofeet stopfor road conditions and 25 feet for driver reaction, 80 +
25 + 25 g$0.
1 You now need 130 feet to stop safely.
What do I expect from the NRC7 I expect the concerns to be reviewed by the and I expect to be contacted for more information.
NRC the NRC withtoexperts,ine determ in a few weeks whether the concerns are valid, andI expect whether CY should resolve these concerns.
At the August 7th NRC public meeting in Waterford, I will listen for any
- progress made investigating these concerns.
Former CY Design Engineering cc: Paul Blanch, Greg Wingard CC: ERNIE HADLEY <ECHADLEY@aol .com>
4 1
I i
~
2
From: PAUL M. BLANCH <PMBLANCH91x.netcom.com>
To: John Zwolinski <JAZ9nrc. gov >
Date: 7/31/96 6:46pm subject: CY PROBLEMS 7/31/96 John A. Zwolinski, Deputy Director Division of Reactor Projects -I/II Office of Nuclear Reactor Regulation Washington, DC 20555-0001 John:
The following letter was received today by regular mail. The only editing I did was to remove the author = B9s name and address. I will be interested in seeing your response to his concerns.
Sincerely, Paul M. Blanch 135 Hyde Rd.
West Hartford CT. 06117 !
860-236-0326 I
l l
I 1
l 1
I l
l l
l
-Q&MT sfp ,
l l
7/31/96 WayneD.Lannin!toneOversightTeam Director - Mill Nuclear Regulatory Commission 475 Allendale Road KingofPrussia,PA19406 .
SUBJECT:
SAFETY CONCERNS AT CONNECTICUT YANKEE The purpose of this letter is to clarify the safety concerns identified in the information package I sent to you on 1/10/96. 1 identified three safety concerns in the package.
which The first concern is a system that isinvolved requiredthe to Reactor Vessel safely shut downLevel Indication the plant in theSystem,t even of a loss of reactor coolant. NRC Regulatory Guide 1.97 requires the system to ghereactorvesselrovide redundant monitoring from the top of the reactor core to the top of W
is way the to allowed technical be lost specifications are written with no corrective at CY,d.most action reguire of the indication When one indicator is lost it is like driving at night with one headlight you can still see.
At CY in, the late 1980's and early 1990's, both primary,and backup indicators were lost at several locations from the top of the core to the top of the vessel. It was like driving at night with no headliahts. CY responded by l changing the emergency procedures to use alternate Tess accurate indication.
Itwasliketellingtheoperatorstoholdaflashlightoutthecarwindow.
Although it was questionable whether there was enough indication to handle a loss of reactor coolant accident, this was not my concern. My concern was it seemed to take months to hand the operators a after the lights flashlight. went out,tried The change I to make in 1992 would reguire a timely update of the emergency procedures when critical indication is lost. This change should be implemented before the plant restarts.
The second safety concern involves the technical specifications for eleven reactor trip setpoints. Concerns about the quality of the setpoint l calculations were raised in the mid 1980's According to the latest industry guidelines, but for were ignored setpoints calculating until 1994.the setpoint allowable values in a number of the CY technical specificatio,ns are not valid. The invalid values include: RCS Low Flow Reactor Tri SteamLineBreakFlowReactorTrip,p[PSCRe/
Steam Feed V actor Flow Mismatch Reactor Hi Pressurizer LevelTrip, Reactor Trip HCP Reactor Trip PORV Actuation '
Trip,DelugeActuation,RHRValvePermiss,ive,NISPowerRan,gePermissive,f7&
Core P8 Permissives. ,
The present operations manager at CY suppressed these concerns for years by ignoring them when he was the plant instrumentation mana er. When I raised the concerns to him personally in a 1994 meeting, he sim ly claimed the setpoints were safe, and refused to discuss the reasons hey might be unsafe.
An automobile comparison would be like a town manager refusing to review speed limits to the latest safety standards. Assume a car stops 50 feet on dry pavement after you apply the brakes. If new safety information comes out that says you should leave an additional 25 feet for adverse road conditions and an additional 25 feet for the driver to react, then you should allow 50,+ 25 +
25 - 100 feet of stopping distance to be safe. The present CY allowable l values are based on 50 feet. CY should correct the technical specifications, and have NRC approval of the changes before they continue to operate.
The improper allowable values leads to the final safety concern. It is not 1 l l
l l
[
l t oossible to do pr per safety evaluations with improper allowable values. When Instrument error such sometimes found asthe o tside driftlim)its is checked durina calculated to 6e shutdown at CY safe, limits it is to r,eferred as the acceptance criteria. This is common at all olants and has happened hundreds of times at CY. The concern is when this happens at CY there is no l
method in olace to evaluate whether safety limits were violated,,and whether a setpoint change is needed to ensure safe operation in the future.
! assume the CY setpoints have been u I To uselatest to the the automobile safety standards,analogy and again,le ve 100 feet for the car to stop.pdated The procedures still say the brakes should stop the car in 50 feet which is fine.
Now assume when braking distance is checked, it is sometimes fo,und to be 80 feet. With the evaluation method at CY they wo "no since we If problem,d you nee 80 feet
! wehave20feettospare"uldsay: Wrong.
have 100 feet25tofeet stopfor road conditions and 25 feet for driver reaction, 80 +
for brakin g$0.
25 + 25 1 You now need 130 feet to stop safely.
What do I expect from the NRC7 I expect the concerns to be reviewed by the l and I expect to be contacted for more information.
NRC withtoexperts,ine the NRC determ in a few weeks whether the concerns are valid, andI expect i whether CY should resolve these concerns. !
At the August 7th NRC public meeting in Waterford, I will listen for any progress made investigating these concerns.
Former CY Design Engineering .
cc: Paul Blanch, Greg Wingard CC: ERNIE HADLEY <ECHADLEY@aol.com>