Change Notice CN (App 2)-17-1 to Rev 2 to App 2 Engineering Field Procedures,Section 17, Final Design Verification for Safety-Related Piping Sys of Project Ref Manual
ML20141M033
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/08/1987
From:
GEORGIA POWER CO.
To:
Shared Package
ML20141M032 List:
References
PROC-871208, NUDOCS 9203310232
Download: ML20141M033 (12)


Text

.. ...._...,;... . - . - . .. . _ _ . . _ _ _ . . . _ . . _ - _ . . .___ . . , . . . . . . . . . . . . . _ - . _ , ..

8 1

,J .-

^

i f

.g -

VEGP FROJECT REFERENCE MANUAL. Rtv *' , OAff 6 8 _

b i

i -.

s.

APPENDIX 2 ENGINEERING '

FIELD PROCEDURES

'SECTION 17

,1 FINAI,- DES f G5' VERIFICATION FOR SAIITY-KELATID PIP!NG SYSTEMS 9 ,

.t

. Thie revision replaces Change Notices CN (Ai'P 2)-17-2 and f CN (APP 2)-17-4 u

[i f

i :.

n .

Approved. W g . , /

' Approvet.:hhtdd- -

Approved: b aM ,,,,

C. v \- ,

4 ,

-92033iOW2 920326 I -i

=PDR ADOCb 050004'04 '

, ' _ . -P YLW

.:)> -

, , e ,. . . . , - . - . . , . , - - -

h

, VOOTLE s LECTRIC QENER AtsNO PL ANY PROJECT REFERENCE MANUAL wo.CH (APP 2b17-1 CHANGE NOTICE _

w-t *8' THIS CHANGE NOTICE AFTECTS.

YtTLt T i n a l D e sj en Ve ri fi c a t i on f o r S a f C_E,$ la t e d P i pi n P.lE[yg,5 . , , _

  • 4 7.f.ffandih.,3 ,,, t.t C Y l O N 17 REVislON .

2 ..

1. De fallowing pages are superseded by this change notices 17-4, 17-5 I
2. Remove the above existing pages from Appendix 2. Section 17 and rtplace g with the attached pagen.
3. File this change notice beht.nd the t;tle pye of Appendix 2, Sectioti 17.

e 1

i l

l

{

l (291)

I t t

. \

uncno: Sid;/97bd rumicut mc.tn unwto.~ 4 . l lu C _

vw reterwauun vom i

l auAuty anunner pettet comttAtt anovat:[2/#24~

d4[- __

l l..

VEGP PROJECT REFERENCE . MANUAL REV 2 DAtt 6-15-87 TABt f 0F CONTENTS Paragraph Page, 17.1 Purpose . . . . . . .. . . . . . . . . . . . . . . . 17-1 17.2 Scope .... . . . . .. . . . . . . . . . . .. . . 17-1 17.3 References. . . . . . . . . . . . . . . . . . . . . . 17-1 17.4 Ceneral . . . . . . .. . . . . . . . . . . . . . . . 17-2 17.5 Responsibility. . . .. . . . . . . . . . . . . . . . 17-3 17.6 Final Veritica.ior.. . . . . . . . . . . . . . ... . 17-3 l 17.6.1 Scoping. . . . . . . . . . . . . . . . . . . 17-3 17.6.2 An-Built Verifiestion/Statusing. . . . . . . 17-4 17 4.3 Engine (ring Walkdow, . . . . . . . . . . . 17-4 0 17.6.4 Analysis Package Transmittal . . . . . . . . 17-4 17.6.5 Pipe Stress Reconciliation . . . . . . . . . 17-5 17.6.6 Support Reconelliation . . . . . . . . . . . 17-5 17.6.7 Stress Reconciliation Notification Form . . 17-5 I LIST OF AITACHMENTS M. t a c h_me n t Pan A 79-14 Reconcillation Program Organizations 1 Responsibilities. . . . . . . . . . . . . . . . . . . 17-7 B Stress Reconciliation Notification Form . . . . . . . !7-$

C Lead Release Letter . . . . . . . . . . . . . . . . . 17-9/10 4

17-til/iv 4298t

VEGP PROJF.CT REFh.RENCE MANUAL REV 2 DATE 6-13-87 PART 2 .

ENGINEERING FIELD PROCEDURES SECTION 17 FINAL LESIGN VERIFICATION FOR S AFETY-REl.ATED _ P ! P ING, SYSTEM.9 17,1 Pyll'OS E This procedure defines the processes and interfaces needed to perform the final design verification for safety-related piping system of the Vogtle Electric Generating Plant. (VEGP) ah required by N1C-!E Bulletin 79-14 17.2 SCOPE This scetion ap;11es to safety-related .ind selected ANSI B31.1 piping systems.

17.3 REFERENCES

The f ollowing documents supp'tement the requ!rements of this section;

a. VEGP Project Reference Kanual (PRM), Part C. Sortion 4, (Bechtel Drawings)
b. VEGP PRF., Part A, Section 12 (Bechtel ' westinghouse inter f ace control)
c. VEGP FRM, Part C, Section 9 (Design Calculatia..s)
d. VECP PRM. Part C Section 17 (Fleid Change Roquests)
e. VEGP PRM, Part C, 3ectton 19 (Deviation / Operational Deficiency Repor ts )
f. VECP PRM, Part C. Section 26 (Construction 3pecificatien)
g. VEGP PRM, Part C, Section 29 (ASME Section III Desigr.

3pecifications, Stross/ Design Reports, and Load Capacity Data Sheets)

h. VECP PRM, Part C, Section 32 (Final Safety Analysis keoort and Uperating License Stage Environmental Report Preparation and Change Control)  ;
i. VEGP PR.*, Part C, Section 40 (Structural Integrated Verificatica ,

and Evaluation)

j. VECP PRM, Part C, Section 41 (Finalization Program) 17-1 4298:

m--

VEGP PROJECT REFERENCE MANUAL REV ,7_ DATE 6-15-87 I k. VECP Specification XLA201, Plant Design and Ir.strumentation Construction Specification

1. U.S. Nuclear Regulatory Commission Inspection and Enfercement (IE) Bulleein 79-14 Sel4mic Ar.alyses for As-Built Safety-Related Piping Systems, dated July 2, 1979 o Revision 1. ?ated Jely 18, 1979 o Supplement 1. dated August 15, 1970 c Supplement 2. dated September 7,1979
m. VEGP PRM, Appendix 2, Section 1 (Division of Responsibility)
n. VECP PRM, Appendix 2, Section 7 (Field Control of Transferred Piping Isometrics snd Field-Gene-ated Pipe Drawings)
o. VEGP PRM, Appendix 2, Section 9 (Field Controi of Pipe Suppoct Assenbly Drawings)
p. VECP PRM, Appendix 2. Section 9 sProduction and Control ot' Field-Genetared Instrumentation Tubing Isometric Drawings)
q. VEGP PRM, appet. dix 2, Section 11 ( Analysis and Desi6n 62 g Small-Ba.e Piping Systems by the Vogtle fi.ructutul Analysis Mobile Unit).
r. VEGP PkM, Appe adix 2, Section 15 (tiping Systems Scope of Work)
s. tul' Tan E0wer Products Q.A. Procedure:

c IX-50. Pipe Support Installation, o X-4, fina) inspectica.

a X-2a. Procedure for As-Luil Piping Systems and Related I Components.

o 51-11. E?te Instructions for As-Beilt of Installa_ ion Drawingr

t. Vogtle Project Pol;cy and Procedurce Manual (PP6PM), Appendix 7
u. VECP As-Built Pragtam Manual Part II Section 7 (FP-7) 17.4 G ENE RA,L To ensure that the installed piping systems analysis is valid, IE Bulletio 79-16 requites that all operating nuclear power facii.ities and all nuclear facilities under ecnstruction inspect sad verify that the s e i s.r i c 17-2 D -

VECP PROJECT REFERENCE MANUAI. REV 2 DATE 6-15-87 analysis applies to the as-built configuration for all safety-related piping. The as-built installation and current design criteria are compered to the design documents that are as input to the latest seismic analysis.

Finalization or piping stress ana. lysis evaluations requires verification of conformance of design calcu'iations to current project and supplier documents including the conformance 'f design changes.

Cenformance includes analysis -or documented justification to reconcile significant differences between the existing analysis and the final data.

This includes updatsng of appropriate documented references. g Reconcillat i on is performed on analysis units which are packages of instatlation isometrica and support drawings for a specific piping boundary. 9 Desk instructions and instructJon memos shall be issued to defics the I methods to be used to meet the requirements of this manual and the Design Manuat. These instructions shall reinforce PkM requirements such as statement of purpose, content of the calculations, references, susumptions, design criteria, and design inputs. Indiv13uals shall be trained in the unique technical aspects ei their work by the group supervisors or designee 6.

I The final verification program occurs after all installation within tne de fined analysis imit has been 100% completed. The program identifica '

construction rework, if any, This verification program meets the requirement specified in the PFLPM, Appendix 7.

In addition to the requirements specified in this section, engineering may  !

establish a preliminary phase of the veri:ication program. This preliminary phase, if required, begins wnen the installation status of a defined tnalysis unit is sufficient to proceed with an analysin that will be representative of ti.e final installaticu. This phase may be used to resolve analysis problems and identify construction rework in advance of { <

t the final reconciliccion. This crcliminary phase may be used to complete

[

any or all cf the tasks defined in Paragraphs 17.6.1 through 17.6.o. g l-17.5 RESPONSIBILITY lo complete this pregram. responsibility is generally assigned as shewn in Attachment A.

17.6 FINAL VERIFICATION The following steps constitute the final (100%) verification program to meet the requicements of NEC-IE Bullecin 79-14 17.6.1 SCOPING The analytis units are defined by the appropriate respoccible engineering orEanizations. See PRM, Appendix 0, Section 15 for definition of piping l l 17-3 429Bt

Change Notice CN (APP 2)-17 1 Dated 12/8/87 i

VEGP PROJECT REFERENCE PANUA1 REV _2_ DATE 6-15-87 analysis. .The organications identify the isometric and support drawings which are to be qualified in the analysis (in-scope), and the isometric and support drawings which are required to develop boundary conditions f or the analysis _(overlap). This information is collected by Vogtle Structural Analysis Mobile Unit (V-SAMU) for transmittal to the installation contractor.

17.6.2 AS-BUILT VERIFICATION /STATUSING Upon receipt of tne transnittal for the scoping information descIibed above f rom V-SAMU, the installation contractor shall identify any discrepancies between the contractor's records and information provided by V-SAMU.

The centractor continues installation until 100% of piping and supports are installed. The installation contractor shall perform walkdowns as needed

' to provide piping and support dimensions and other itemc eritical to analysis. The information required by engineering is defined in the Construerien Specifications X4A201. The contractor shall update isometric and support drawings to record as-built within tolerance conditions for the installed items (PRM ? art C, Section 4) and to incorporate all outstanding

. changes. The contractor shall document all out of tolerance conditions in accordance with the applicable project procedures. The installation centractor shall f urnish V-SAMU a tabulated listing of all drawing numbers with their respective revisions.

17.6.3 ENGINEERING WALKDOWN If :equired, Engineering may conduct a valkdown of the analysis unit to gather additional information to augment that provided by the installation contractor's "as-built within tolerance" drawings. Documentation of Engineering walkdown information is retained with the associated calculations.

17.6.4 A'iALY31S PACKAGE TRANSMITTAL Prior to final analysis, BWPC compares isonetries to P&ID and resolves discrepancies. Upon notification by V-SA.'N of scoping activity, BWPC Mechanical raust obtain concurrence f rom the respcusicle stress analysis group prior to issuing PLID changes.

For each analysis unit, V-SAMU prepares an analysis package for use in reconciling the pipe stress calculation. This package includes:

o Ihe "as-built within tolerance" drawings from the installation contractor o A summary of support information as needed to review the pipe stress calculation.

o Other design information as required.

's j 17-4 a298t

. _ = __

Change Notice CN (APP 2)-17-1 Deted 12/8/87 VEGP PROJECT REFERENCE MANUAL REV 2 DATE 6-15-87 Analysis packages within V-SAMU scope are retained for use by V-SAMU; the balance of the packages are transmitted to the appropriate engineering organization (BWPC or W). The applicable information from the analysis package will be Ancorporated into calculations during final recon-ciliation. The remainder of the analysis package may be discarded after completion of the calculation revision.

17.6.5 PlPE STRESS RECONCILIATION The responsible engineering organization reviews the pipe stress calculations against the information included in the as-tuilt analysis packare and current design criteria. Conformance of design calculations to the as-built information is required to ensure that applicable installed conditions are accounted for within the calculations.

All stress calculations are updated to the next revision and are noted as

" Reviewed for IE Pulletin 79-14". Any supplemental calculations shall be incorporated into the stress analysis. Small bore piping stress calculations which were deferred until after installation shall be completed as Revision 0 calculations with the note " Reviewed for IE-Bulletin 79-14" shown on the cover page.

For BVPC and W scope, pipe support design inforuction is transmitted to V-SAMU for support reconciliation. This transmittal is made t, 1001 load release letter (LRL) (Attachment C). Changes subsequent to the 100% LRL shall be issued by a revised LRL with sequential revision number.

Upon completion of stress calculations for each analytical unit, the responsible enginetting orFanization shall notify V-SAMU and shall transmit the revised calculations to drawing and cata control (DDC).

17.5.6 SLTPORT RECONCILIATION V-SAMU shall review all the pipe support calculations for conformance to che data provided in the stress calculation, and the as-built information.

All support calculations are updated to the next revision and are noted as "Raviewed for IE Bulletin 79-14". Small bore piping support calculations wh ;h were deferred until after installation shall-be completed as Revision 0 calculationc with the note "R.sviewed for IE-Bulletin 79-14" shown on the cover page. Revised calculations are transmitted to DDC.

Design changes, if required. shall be issued to the appropriate drawings in accordance with existing project procedures.

17.6.7 STRESS RECONCILIATION NOTIFICATION FORM Subsequent to templeting any required rework, the installation contractor shall update isometric and support drawings to incorporate all outstanding  ;

chtnges and to reflect as-built within .tolecance conditions. The contractor shall furnish the responsible engineering organization with a final tabulated listing of all drawing numbers with their respective revisions.

17-5 4298t

I l

VEGP PROJECT REFERENCE MANUAL 2 REV -- DATE 6-15-87 Upen receipt of the contractor's final listing of drawings and revisions l and co:npletion of all stress reconciliation for ca;h analytical un!t, the )

responsible engineering organization shall prepare a Stress Reconciliation l Notification ($RN) f or1n ( Attachment B). For BWFC and W scope the  !

applicable LRL revision shall be noted on the SRN. The signed SFJJ i s l forwarded to BWPC. l 1

i i

l l

I a

17-6

-295:

m,

m MM 'E

  • coereinete ..sinseine ceivitico -

coordenate tw s iterf ce oct te t e s.e -

n. fine esise sn e,wnder n es of pip.

f,,

tatse.in teePCs KS11NGH0 TEE ww3 if EseJ lHetweert engineering aid strees calculatler'. es ?nsn F3PC ,

for tem reconell f at tene. pr ogrcm. - coat tr uct len. ecagww.

'O

  • s of pi m
  • Defl%

et, esscr.etye e sie,.s icui.t t>oan4ar e,tt. te,n v-sm,e i .

oe < ~ < ~ " ~' s *< &

franesne t the defined treely.8s u arise i - . din. "ete e<-

h operof 8er.el teatIng pr ogren e8ett 8 *P

  • g,,urestrIc cod eagperi desefngs ofs ect ites varIfIcetIon pre;grisut*

5ithfn the deffnett W *!ee !s-

  • pravide conetr JeasIsts ?NttrOc?es UM*

1IeIe of eseeetrtLe d e*JP**rIo zithari def(ned ma3yeie tearitarIae.

  • Per frm tte os-tasII t rocc-icI t Iet ten of tres piping etthin IfuPC e*epe.

. ca or.t.

! ietal tot les* C sitractor .

.,d,I,,,e . e w rt en ffnes,ee , ...se i.- -

cre de o t e, ee , . t,.e oe *,1 t ei min

,,,,e,sen ,.er,e, e e,,e,e ., eet.f<nese e , ,,, , ,,

  • teIeresce8 ! seine 1r ie so-d supperi esf f ned senalyeIe t>surwlor Iee 1 a Per form ttee oa-tut it reconct i sof f en drottn,ge to W-SAaAJ eith oil y. g, of the pipirq ef thtr. V-52Jd ecope, eutef tewsing cWe sneerg.setet tten

.y Per

.t oi for,me tit-orte ee Ast- ifrea r*,ccact f le.t 8en e .oe. .eing f*rewide efet , ofV-3AaEA

,i,ing .nd et eu,.,,er tn inef allo,e simin fon,,,, , e .[, , ,,,,,,t , , , e,, .

4 Contatternnt reckts. the sectned analyen e t>eundorses.

Ider'tIfy yeeerk result f:q frscan r acerw:I t tet ten to the coria:Fuciten ' . e nsure tem So-taallt teiemmetric W

  • I'8'Id' 'PI*'"d 'P'**II"'II***

centr eeter . eupperd s;raeltsgo occuratesy rafts.t g ',(

  • ,p
  • I, ,

the ce* Installed conflGar dt f e.rt c ,,g,,gg,g, sitt-In at f eedbte specificet teen

^

UI e oesfore so-bette recoccattation el Conr airceent rects and ideatify any 3efirse cynolyste EmsWet tee of ptM a Perfoes walbe!.wsi we i se g resoek to t he c uent r ac t or.

e* feet eciculattute withis, approved spec t' ..at terie Beet tref =euse ace,se. Onspplied by 2WPC e Fe r t u,e eWeC Vendor scope p i p M,e

  • and sepport ee
  • be i l e. eeu nciliataan Trenesatt the skffnod artelyHe and identify toy re.,oth t o t he -

bemeter d ee tretteeing tief e of coatearser.

IeasetrIc and ogpert asrwenge with?M the defined t>easidarios in

'v'- SAaAl.

For fetin itia se-tm.e3 8 t r*(onc I a 4 at lore g

  • of tne p2peng el1M t tim .

SeetingF.ouse seg e.

Previce eg pert 1.ede s W stlffnese I re4ulternette for u.gaperto esthite define.t wistyeIa t>ensidories to V 4AhEJ. y M

h*

4.=e

.a 4

rJ>

M Attf.fense-t A. f* t 4 itetencII:of f en Prsgrm Orgritnotlee at fleopensIbI8 8eIse m\

I

?

' 6-15-87 VEGP PROJECT REFERENCE MANL'AL REV DATE V0GTLE UNIT 2 1007. STRESS RECONCILIATION NOTIFICATION Analyt'. cal Packige Number: _ _ _

Tacine Release Status: Provit.ional: Comen t :

Final:

The in-scope bs-built isometric and support drawings listed on the attached

_,i sheet (s) have been reconciled in the respective calculations.

ASME Ccde Cases used:

F1pirm 1569 16 M N-316 N-318-2 N-392 N-;97 N-411 Other Supports N-71-10 N-249-7 N-249 2 N 4-3SS _

Other __

AS'4E Section III Division i Code Editio'ns and Addenda used:

Subsections NC and SD of tne 1974 Edition induding Addenda through Sw:m:r 19 75, with excep.icns as no ced in 0?-10 t 7.

___ Su'esections NC (1980 Edition, Winter 1981 Addenda) and NP (1983 1

Edition. Summer 19S4 Addenda) Subparagrap.,s 3652 through 3o55.

, _ _ Subsection NF of the 1974 Edition including Addenda through Sumcner 1975.

Evaluations: Complete and Nat Acceptable Applicable

Pipe Stress ,,_ _ _

'hlve nccele ra t ioni. /Nozz le Load >

5 Equipmer.t and Penetration Nozzle Loads __

?ipe Sur oorts .

Pipir.g Avlease' 3upport Release:

Rev. O Rev 0 34pature/Date Signature /Cate Rev. 1 Rev. 1 Signature / Dace S ignature c 0s te 1

Rev. 2 R e +, .

Signature /Date Signa'.ute/Do u Attachment 3. Stress Recon:iliation Notification i arm 1 17-S 429Bt

, VEGP PROJECT REFERENCE MAhilAL m. DAR N 87

, Bechtel Westem o ower Corporation Interoffice Memcrandum

r. He No. X4BP26 uns sdiect Flant- Vogtle - Unit:01&2 cat.

Ea:htel Jcb #3510-009 thit.-2 79-14 As-Duilt From D. F. Sewell knoctck11stica of Installaticn Field Engineering

  • cones to A: Vcqtle Site Est. 75L1 h Analytical Package:

i Calculatic:n nrt>er: X4CP _

fne 79-14 As-Etilt evaluation of the msject pipiIn systett: has been ctgletal.

Attached are pire support restraint 1 cad ramri sheets ,

for evaluation by V-SJMJ. ?leeuo ensure then all :vquired acticns ircluding su;p;rt dification/rugalificatica are ccepleted.  !

Pleast let us kncu if 102 have ary questicns.

ECEs-P16r.t Des.'.qn Attach sntt Pipe O.:;prt Restra!.nt Lced Surmary -

A'.ter.hment C. Lead ke! ease Letter u o-....

.rP06 67 014/VT -