ML20147B319

From kanterella
Revision as of 13:50, 25 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Informs of Submission of 120-day Response by 970204 Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions
ML20147B319
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/28/1997
From: Rainsberry J
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-96-06, GL-96-6, NUDOCS 9701310017
Download: ML20147B319 (1)


Text

_- . . ~ . _ - . _ . - - . . ~ -

o

  • 50Ullif RN CAllIORNI4 e EDISON An IDISON IN II RN 4 TION tl Cumrany 3

January 28, 1997 4

A U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362

! 120 Day Response to Generic Letter 96-06: " Assurance of Equipment 4 Operability and Containment Integrity During Design-Basis Accident l Conditions" i

San Onofre Nuclear Generating Station Units 2 and 3 Southern California Edison (Edison) requires additional time to finalize the 120-day response to Generic Letter (GL) 96-06 for San Onofre Nuclear Generating Station (SONGS) Units 2 and 3. Edison will submit the 120 day response by February 4, 1997.

If you have any questions or would like additional information, please let me _

I know. '

S' cerely, l /

/ ,

. . Rai try anager, Plant Licensing cc: L. J. Callan, Regional Administrator, NPC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field.0ffice, NRC Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 i

y(07D o 9701310017 970128 PDR ADOCK 05000361 P ,.

PDR P. O. Box 128 San Clemente. CA 92674-0128