ML20148G987

From kanterella
Revision as of 13:50, 23 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests That Encl Info Re Response to NRC Questions 252.1-14 & 220.1-9,in Review of Wapwr RESAR-Sp/90 Pda Be Withheld (Ref 10CFR2.790 & 9.5(4))
ML20148G987
Person / Time
Site: 05000601
Issue date: 01/07/1988
From: Wiesemann R
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Rubenstein L
Office of Nuclear Reactor Regulation
Shared Package
ML19341D827 List:
References
AW-88-001, AW-88-1, NUDOCS 8801270082
Download: ML20148G987 (1)


Text

___. _ _ - -_

v -

O Westinghouse Power Systems fn7tllgnp,nn3y,,37,333230.g333 Electric Corporation January 7, 1988 AW-88-001 Docket No. STN-50-601 Document Control Desk l).S. Nuclear Regulatory Commission Washington, D.C. 20555  !

l Attention: Lester Rubenstein, Director  :

Standardization & Non-Power Reactor Project Directorate l APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE

Subject:

Submittal of Westinghouse Response to Staff Questions (252.1 to 252.14 and 220.1 to 220.9) in Review of the WAPWR RESAR-SP/90 PDA T

Reference:

Letter No. NS-NRC-88-3304, Johnson to Rubenstein dated January 7, 1988

Dear Mr. Rubenstein:

The subject report transmitted by the referenced letter contains information proprietary to the Westinghouse Electric Corporation, t The material will not be employed as a part of a license application or other action identified in 10CFR2.790(a) at this time. It will be separately submitted with an Application for Withholding accompanied by an Af fidavit meeting the requirements of 10CFR2.790(b) prior to such use.

Accordingly, we request that the material be treated as proprietary information within the provisions of 10CFR9.5(4), "Freedom of Information Act Regulations". If there is a need to make public disclosure of the material prior to a separate Westinghouse submittal for docket in accordance with the provisions of 10CFR2.790(a), please notify Westinghouse prior to making a

. disclosure determination.

Correspondence with respect to the proprietary aspects of this submittal should reference AW-88-001 and should be addressed to the undersigned.

Very truly yours,

/

L kh (.dldb'lSU WMS/bek/3449n Robert A. Wiesemann, Manager Enclosure (s) Regulatory & Legislative Affairs cc: E. C. Shomaker, Esq.

Office of the General Counsel, NRC 8801270002 ADOCK O BB g h PDR PDR '

I

.- -__. . . -.