IR 05000029/1985023
ML20137U227 | |
Person / Time | |
---|---|
Site: | Yankee Rowe |
Issue date: | 11/27/1985 |
From: | Dragoun T, Mcfadden J, Shanbaky M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
To: | |
Shared Package | |
ML20137U222 | List: |
References | |
50-029-85-23, 50-29-85-23, NUDOCS 8512090235 | |
Download: ML20137U227 (7) | |
Similar Documents at Yankee Rowe | |
---|---|
Category:INSPECTION REPORT
MONTHYEARIR 05000029/19990021999-08-0404 August 1999
[Table view]Insp Rept 50-029/99-02 on 990411-0714.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Safe Operation of Sf Pool,Radiological Controls,Organization & Mgt Controls & Auditing & C/As for Decommissioning Activities IR 05000029/19990011999-05-0505 May 1999 Insp Rept 50-029/99-01 on 990101-0411.No Violations Noted. Major Areas Inspected:Cold Weather Preparations for Spent Fuel Pool,Radiological Controls & self-assessment & Auditing & Corrective Actions for Decommissioning Activities IR 05000029/19980031998-10-0101 October 1998 Insp Rept 50-029/98-03 on 980601-0731.No Violations Noted. Major Areas Inspected:Decommissioning Activities,Including Mods to Spent Fuel Pool Bldg & Radiological Controls IR 05000029/19980011998-06-24024 June 1998 Insp Repts 50-029/98-01 & 50-029/98-02 on 980101-0331.No Violations Noted.Major Areas Inspected:Mod to SFP Bldg, Radiological Controls & Decommissioning Activities IR 05000029/19970021997-09-23023 September 1997 Insp Rept 50-029/97-02 on 970401-0814.No Violations Noted. Major Areas Inspected:Licensee Activities Re Decommissioning IR 05000029/19970011997-05-16016 May 1997 Insp Rept 50-029/97-01 on 970301-31.No Violations Noted. Major Areas Inspected:Facility Operations IR 05000029/19960041997-01-24024 January 1997 Insp Rept 50-029/96-04 on 961119-21.No Violations Noted. Major Areas Inspected:Insp Verified by Observation, Documentation Review &/Or Discussions W/Responsible or Involved Plant Staff IR 05000029/19960031996-10-16016 October 1996 Insp Rept 50-029/96-03 on 960827-29.No Violations Noted. Major Areas Inspected:Operations,Rp Program,Including Operations,Staffing,Mgt & Licensee Experience in Identifying & Correcting Weaknesses Re Control of Radioactive Matls IR 05000029/19930071993-12-28028 December 1993 Insp Rept 50-029/93-07 on 930826-1118.Violation Noted. Major Areas Inspected:Posting of Radiological Areas & Other Controls,Organization & Staffing,Exposure ALARA Program & Radiological Info Available to Workers IR 05000029/19930081993-11-0909 November 1993 Insp Rept 50-029/93-08 on 931018-19.No Violations Noted. Major Areas Inspected:Mgt Support & Audits Protected Area Barriers,Detection & Assessment Aids Protected Area Access Control of Personnel,Alarm Stations & Communications IR 05000029/19930051993-08-18018 August 1993 Insp Rept 50-029/93-05 on 930510-0731.No Violations Noted. Major Areas Inspected:Operations,Maint Engineering & Plant Support,Including Radiological Controls,Security,Fire Protection & Housekeeping & Administration IR 05000029/19920111993-02-0505 February 1993 Insp Rept 50-029/92-11 on 921114-930201.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Control, Security,Engineering & Technical Support & Safety Assessment & Quality Verification IR 05000029/19920101992-11-23023 November 1992 Insp Rept 50-029/92-10 on 921104-06.One Open Items Noted. Major Areas Inspected:Contamination Monitoring of Guardhouse,Postings & Other Controls,Radiological Control of Work in Progress & Organization & Staffing ML20127F1051992-11-23023 November 1992 Corrected Cover Page for Insp Rept 50-029/92-10 on 921104-06.No Radiological Safety Concerns or Violations Noted.Major Areas Inspected:Contamination Monitoring at Guardhouse,Postings & Other Controls Observed During Tours IR 05000029/19900231990-12-0505 December 1990 Insp Rept 50-029/90-23 on 901105-09.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Controls & Radiological Environ Monitoring Programs ML20062H0801990-11-19019 November 1990 Insp Rept 50-029/90-21 on 901015-19.Noncited Violation Noted.Areas Inspected:Response to Bulletin 79-14 Re Seismic Analysis of as-built safety-related Piping Sys IR 05000029/19900161990-11-0606 November 1990 Insp Rept 50-029/90-16 on 900821-1001.Violation Noted.Major Areas Inspected:Daytime & Backshifts in Areas of Plant Operations,Radiological Controls,Maint & Surveillance, Emergency Preparedness,Security IR 05000029/19900811990-09-28028 September 1990 Insp Rept 50-029/90-81 on 900709-20 & 0806-10.Weaknesses & Unresolved Item Noted.Major Areas Inspected:Maint Program IR 05000029/19900121990-09-24024 September 1990 Insp Rept 50-029/90-12 on 900619-0820.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Security,Engineering/Technical Support,Safety Assessment/Quality Verification & Repts ML20058D3651990-09-14014 September 1990 Insp Rept 50-029/90-17 on 900730-0803.No Violations Noted. Major Areas Inspected:Audit of Licensee Action in Response to Recommendation Described in Generic Ltr 88-17 ML20059K7171990-09-0707 September 1990 Insp Rept 50-029/90-14 on 900802-27.Violations Noted Re Failure to Demonstrate Emergency Diesel Generators Operability at Required Capacity Under Design Basis Conditions.Major Areas Inspected:Emergency Diesel Generator IR 05000029/19900131990-08-0303 August 1990 Insp Rept 50-029/90-13 on 900709-13.One Noncited Violation Noted.Major Areas Inspected:Implementation of Radiation Protection Program During Current Refueling Outage & Review of Training & Qualification of Contractor Technicians IR 05000029/19900111990-08-0101 August 1990 Insp Rept 50-029/90-11 on 900619-22.No Violations or Deviations Noted.Major Areas Inspected:Safety Injection Tank Design & Replacement Procedures Together W/Walkdown of Safety Injection Sys Pumps,Valves & Piping IR 05000029/19900091990-07-16016 July 1990 Insp Rept 50-029/90-09 on 900515-0618.No Violations Noted. Major Areas Inspected:Operational Safety,Plant Operations, Radiological Controls,Maint & Surveillance,Emergency Preparedness,Security & Engineering/Technical Support IR 05000029/19900051990-02-16016 February 1990 Physical Security Insp Rept 50-029/90-05 on 900207-09.No Violations Noted.Major Areas Inspected:Implementation of Safeguards Info & Personnel Access Control Programs at Corporate Ofc IR 05000029/19890111989-08-28028 August 1989 Insp Rept 50-029/89-11 on 890626-0731.Unresolved Items Noted Re Plant Operations Review Committee Actions to Address Task Force Investigation Results of 890725 Loss of Emergency Bus.Areas Investigated:Security & LERs IR 05000029/19890131989-08-23023 August 1989 Physical Security Insp Rept 50-029/89-13 on 890724-28.No Violations Noted.Major Areas Inspected:Action on Findings of NRC Regulatory Effectiveness Review,Mgt Support,Security Program Plan,Audits & Protected & Vital Area Physical IR 05000029/19890151989-08-15015 August 1989 Emergency Preparedness Insp Rept 50-029/89-15 on 890731-0803.No Violations Noted.Major Areas Inspected: Changes to Emergency Preparedness Program & Facilities, Equipment,Instrumentation & Supplies ML20246Q0301989-08-10010 August 1989 Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected: Corporate Engineering & Offsite Support for Plants & Implementation of Mods IR 05000029/19890121989-08-0101 August 1989 Insp Rept 50-029/89-12 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Sys, Transportation & Liquid & Gaseous Effluents Programs, Including:Mgt Controls,Audits,Qa & Program Implementation IR 05000029/19890091989-07-25025 July 1989 Insp Rept 50-029/89-09 on 890522-0625.No Violations Noted. Major Areas Inspected:Daytime & Backshifts of Previous Insp Findings,Operational Safety,Security,Plant Operations,Maint & Surveillance,Engineering Support & LERs IR 05000029/19890101989-07-20020 July 1989 Insp Rept 50-029/89-10 on 890705-07.No Violations Noted. Major Areas Inspected:Operational Radiological Environ Monitoring Program Including Mgt Controls & Licensee Program for QC of Analytical Measurements IR 05000029/19890061989-07-14014 July 1989 Insp Rept 50-029/89-06 on 890410-0521.Violations Noted. Major Areas Inspected:Actions on Previous Insp Findings, Operational Safety,Security,Plant Operations,Maint & Surveillance,Engineering Support & Radiological Controls IR 05000029/19890081989-07-0606 July 1989 Insp Rept 50-029/89-08 on 890530-0601.No Violations Noted. Major Areas Inspected:Fire Protection/Prevention Program, Including Program Admin & Organization,Admin Control & Combustibles & Admin Control of Ignition Sources IR 05000029/19890071989-06-0707 June 1989 Insp Rept 50-029/89-07 on 890524-26.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Findings, Changes in Radiation Protection Program & ALARA IR 05000029/19890021989-05-0404 May 1989 Insp Rept 50-029/89-02 on 890228-0410.No Unacceptable Conditions Noted.Major Areas Inspected:Operation Safety, Security,Plant Operation,Maint & Surveillance,Engineering Support & Radiological Controls IR 05000029/19890051989-05-0202 May 1989 Insp Rept 50-029/89-05 on 890403-07.No Violations Noted. Major Areas Inspected:Review of Util Actions on NRC Identified Previous Concern Re Generic Ltr 83-28,Item 2.2.2, Vendor Interface & commercial-grade Item Program IR 05000029/19890041989-04-25025 April 1989 Partially Deleted Insp Rept 50-029/89-04 on 890403-07 (Ref 10CFR73.21).Noncompliance Noted.Major Areas Inspected: Licensee Action on Findings in NRC Rer,Mgt Support,Security Program Plans & Audits & Power Supply IR 05000029/19890011989-03-29029 March 1989 Insp Rept 50-029/89-01 on 890118-0227.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Insp Findings,Operational Safety Verification,Radiological Controls & Events Requiring Telephone Notification of NRC ML20235Y7951989-03-0202 March 1989 Insp Rept 50-029/88-22 on 881115-890117.Violations Noted. Major Areas Inspected:Licensee Action on Previous Insp Findings,Operational Safety Verification,Esf Sys Walkdown & Licensee Response to Selected Safety Issues ML20206C5391988-11-0202 November 1988 Onsite Regular & Backshift Insp Rept 50-29/88-16 on 880802- 1003.Major Areas Inspected:Licensee Action on Previous Inspector Findings,Operational Safety Verification, Radiological Controls,Plant Events & Maint Observations IR 05000029/19880191988-09-30030 September 1988 Insp Rept 50-029/88-19 on 880909.No Violations Noted.Major Areas Inspected:Circumstances Surrounding Waste Shipments 88-15 & 88-16 from Licensee Facilities to Barnwell,Sc IR 05000029/19880171988-09-23023 September 1988 Insp Rept 50-029/88-17 on 880815-18.No Violations Noted. Major Areas inspected:pre-outage Evaluation,Review of Prior Insp Findings & Observation of in-plant Radiological Controls,Including Mgt & Organization & Personnel Training IR 05000029/19880101988-09-13013 September 1988 Insp Rept 50-029/88-10 on 880601-0801.No Violations Noted. Major Areas Inspected:Licensee Action on Previous Inspector Findings,Operational Safety Verification,Radiological Controls & Events Requiring Telephone Notification to NRC IR 05000029/19880151988-09-0707 September 1988 Insp Rept 50-029/88-15 on 880815-18.No Violations Noted. Major Areas Inspected:Radiochemical Measurements Program Using NRC Mobile Measurements Lab & Licensee Whole Body Counting Facility,Including Confirmatory Measurements IR 05000029/19880141988-08-11011 August 1988 Insp Rept 50-029/88-14 on 880718-22.No Violations Noted. Major Areas Inspected:Implementation of Provisions of Inservice Test Program for Pumps & Valves,Test Procedures & Results & Results of May 1987 Integrated Leak Rate Test IR 05000029/19880131988-08-0303 August 1988 Partially Deleted Physical Security Insp Rept 50-029/88-13 on 880711-15 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Security Organization,Locks,Keys & Combinations,Physical Barriers & Vital Areas IR 05000029/19880121988-07-15015 July 1988 Insp Rept 50-029/88-12 on 880620-24.No Violation Noted.Major Areas Inspected:Radwaste Insp Program,Including Training of Personnel,Procurement of Packaging,Delivery to Carriers, Records & Repts,Waste Classification & Labeling IR 05000029/19880091988-06-21021 June 1988 Onsite Regular & Backshift Insp Rept 50-029/88-09.Violations Noted.Major Areas Inspected:Previous Insp Findings,Bimonthly Safety Sys Verification,Operational Safety Verification, Radiological Controls & Emergency Exercise IR 05000029/19880081988-06-0202 June 1988 Insp Rept 50-029/88-08 on 880426-28.No Violations Noted. Major Areas Inspected:Emergency Preparedness Insp & Observation of Licensee Annual Emergency Exercise Performed on 880426 1999-08-04 Category:NRC-GENERATED MONTHYEARIR 05000029/19990021999-08-0404 August 1999
[Table view]Insp Rept 50-029/99-02 on 990411-0714.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Safe Operation of Sf Pool,Radiological Controls,Organization & Mgt Controls & Auditing & C/As for Decommissioning Activities IR 05000029/19990011999-05-0505 May 1999 Insp Rept 50-029/99-01 on 990101-0411.No Violations Noted. Major Areas Inspected:Cold Weather Preparations for Spent Fuel Pool,Radiological Controls & self-assessment & Auditing & Corrective Actions for Decommissioning Activities IR 05000029/19980031998-10-0101 October 1998 Insp Rept 50-029/98-03 on 980601-0731.No Violations Noted. Major Areas Inspected:Decommissioning Activities,Including Mods to Spent Fuel Pool Bldg & Radiological Controls IR 05000029/19980011998-06-24024 June 1998 Insp Repts 50-029/98-01 & 50-029/98-02 on 980101-0331.No Violations Noted.Major Areas Inspected:Mod to SFP Bldg, Radiological Controls & Decommissioning Activities IR 05000029/19970021997-09-23023 September 1997 Insp Rept 50-029/97-02 on 970401-0814.No Violations Noted. Major Areas Inspected:Licensee Activities Re Decommissioning IR 05000029/19970011997-05-16016 May 1997 Insp Rept 50-029/97-01 on 970301-31.No Violations Noted. Major Areas Inspected:Facility Operations IR 05000029/19960041997-01-24024 January 1997 Insp Rept 50-029/96-04 on 961119-21.No Violations Noted. Major Areas Inspected:Insp Verified by Observation, Documentation Review &/Or Discussions W/Responsible or Involved Plant Staff IR 05000029/19960031996-10-16016 October 1996 Insp Rept 50-029/96-03 on 960827-29.No Violations Noted. Major Areas Inspected:Operations,Rp Program,Including Operations,Staffing,Mgt & Licensee Experience in Identifying & Correcting Weaknesses Re Control of Radioactive Matls IR 05000029/19930071993-12-28028 December 1993 Insp Rept 50-029/93-07 on 930826-1118.Violation Noted. Major Areas Inspected:Posting of Radiological Areas & Other Controls,Organization & Staffing,Exposure ALARA Program & Radiological Info Available to Workers IR 05000029/19930081993-11-0909 November 1993 Insp Rept 50-029/93-08 on 931018-19.No Violations Noted. Major Areas Inspected:Mgt Support & Audits Protected Area Barriers,Detection & Assessment Aids Protected Area Access Control of Personnel,Alarm Stations & Communications IR 05000029/19930051993-08-18018 August 1993 Insp Rept 50-029/93-05 on 930510-0731.No Violations Noted. Major Areas Inspected:Operations,Maint Engineering & Plant Support,Including Radiological Controls,Security,Fire Protection & Housekeeping & Administration IR 05000029/19920111993-02-0505 February 1993 Insp Rept 50-029/92-11 on 921114-930201.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Control, Security,Engineering & Technical Support & Safety Assessment & Quality Verification IR 05000029/19920101992-11-23023 November 1992 Insp Rept 50-029/92-10 on 921104-06.One Open Items Noted. Major Areas Inspected:Contamination Monitoring of Guardhouse,Postings & Other Controls,Radiological Control of Work in Progress & Organization & Staffing ML20127F1051992-11-23023 November 1992 Corrected Cover Page for Insp Rept 50-029/92-10 on 921104-06.No Radiological Safety Concerns or Violations Noted.Major Areas Inspected:Contamination Monitoring at Guardhouse,Postings & Other Controls Observed During Tours IR 05000029/19900231990-12-0505 December 1990 Insp Rept 50-029/90-23 on 901105-09.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Controls & Radiological Environ Monitoring Programs ML20062H0801990-11-19019 November 1990 Insp Rept 50-029/90-21 on 901015-19.Noncited Violation Noted.Areas Inspected:Response to Bulletin 79-14 Re Seismic Analysis of as-built safety-related Piping Sys IR 05000029/19900161990-11-0606 November 1990 Insp Rept 50-029/90-16 on 900821-1001.Violation Noted.Major Areas Inspected:Daytime & Backshifts in Areas of Plant Operations,Radiological Controls,Maint & Surveillance, Emergency Preparedness,Security IR 05000029/19900811990-09-28028 September 1990 Insp Rept 50-029/90-81 on 900709-20 & 0806-10.Weaknesses & Unresolved Item Noted.Major Areas Inspected:Maint Program IR 05000029/19900121990-09-24024 September 1990 Insp Rept 50-029/90-12 on 900619-0820.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Security,Engineering/Technical Support,Safety Assessment/Quality Verification & Repts ML20058D3651990-09-14014 September 1990 Insp Rept 50-029/90-17 on 900730-0803.No Violations Noted. Major Areas Inspected:Audit of Licensee Action in Response to Recommendation Described in Generic Ltr 88-17 ML20059K7171990-09-0707 September 1990 Insp Rept 50-029/90-14 on 900802-27.Violations Noted Re Failure to Demonstrate Emergency Diesel Generators Operability at Required Capacity Under Design Basis Conditions.Major Areas Inspected:Emergency Diesel Generator IR 05000029/19900131990-08-0303 August 1990 Insp Rept 50-029/90-13 on 900709-13.One Noncited Violation Noted.Major Areas Inspected:Implementation of Radiation Protection Program During Current Refueling Outage & Review of Training & Qualification of Contractor Technicians IR 05000029/19900111990-08-0101 August 1990 Insp Rept 50-029/90-11 on 900619-22.No Violations or Deviations Noted.Major Areas Inspected:Safety Injection Tank Design & Replacement Procedures Together W/Walkdown of Safety Injection Sys Pumps,Valves & Piping IR 05000029/19900091990-07-16016 July 1990 Insp Rept 50-029/90-09 on 900515-0618.No Violations Noted. Major Areas Inspected:Operational Safety,Plant Operations, Radiological Controls,Maint & Surveillance,Emergency Preparedness,Security & Engineering/Technical Support IR 05000029/19900051990-02-16016 February 1990 Physical Security Insp Rept 50-029/90-05 on 900207-09.No Violations Noted.Major Areas Inspected:Implementation of Safeguards Info & Personnel Access Control Programs at Corporate Ofc IR 05000029/19890111989-08-28028 August 1989 Insp Rept 50-029/89-11 on 890626-0731.Unresolved Items Noted Re Plant Operations Review Committee Actions to Address Task Force Investigation Results of 890725 Loss of Emergency Bus.Areas Investigated:Security & LERs IR 05000029/19890131989-08-23023 August 1989 Physical Security Insp Rept 50-029/89-13 on 890724-28.No Violations Noted.Major Areas Inspected:Action on Findings of NRC Regulatory Effectiveness Review,Mgt Support,Security Program Plan,Audits & Protected & Vital Area Physical IR 05000029/19890151989-08-15015 August 1989 Emergency Preparedness Insp Rept 50-029/89-15 on 890731-0803.No Violations Noted.Major Areas Inspected: Changes to Emergency Preparedness Program & Facilities, Equipment,Instrumentation & Supplies ML20246Q0301989-08-10010 August 1989 Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected: Corporate Engineering & Offsite Support for Plants & Implementation of Mods IR 05000029/19890121989-08-0101 August 1989 Insp Rept 50-029/89-12 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Sys, Transportation & Liquid & Gaseous Effluents Programs, Including:Mgt Controls,Audits,Qa & Program Implementation IR 05000029/19890091989-07-25025 July 1989 Insp Rept 50-029/89-09 on 890522-0625.No Violations Noted. Major Areas Inspected:Daytime & Backshifts of Previous Insp Findings,Operational Safety,Security,Plant Operations,Maint & Surveillance,Engineering Support & LERs IR 05000029/19890101989-07-20020 July 1989 Insp Rept 50-029/89-10 on 890705-07.No Violations Noted. Major Areas Inspected:Operational Radiological Environ Monitoring Program Including Mgt Controls & Licensee Program for QC of Analytical Measurements IR 05000029/19890061989-07-14014 July 1989 Insp Rept 50-029/89-06 on 890410-0521.Violations Noted. Major Areas Inspected:Actions on Previous Insp Findings, Operational Safety,Security,Plant Operations,Maint & Surveillance,Engineering Support & Radiological Controls IR 05000029/19890081989-07-0606 July 1989 Insp Rept 50-029/89-08 on 890530-0601.No Violations Noted. Major Areas Inspected:Fire Protection/Prevention Program, Including Program Admin & Organization,Admin Control & Combustibles & Admin Control of Ignition Sources IR 05000029/19890071989-06-0707 June 1989 Insp Rept 50-029/89-07 on 890524-26.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Findings, Changes in Radiation Protection Program & ALARA IR 05000029/19890021989-05-0404 May 1989 Insp Rept 50-029/89-02 on 890228-0410.No Unacceptable Conditions Noted.Major Areas Inspected:Operation Safety, Security,Plant Operation,Maint & Surveillance,Engineering Support & Radiological Controls IR 05000029/19890051989-05-0202 May 1989 Insp Rept 50-029/89-05 on 890403-07.No Violations Noted. Major Areas Inspected:Review of Util Actions on NRC Identified Previous Concern Re Generic Ltr 83-28,Item 2.2.2, Vendor Interface & commercial-grade Item Program IR 05000029/19890041989-04-25025 April 1989 Partially Deleted Insp Rept 50-029/89-04 on 890403-07 (Ref 10CFR73.21).Noncompliance Noted.Major Areas Inspected: Licensee Action on Findings in NRC Rer,Mgt Support,Security Program Plans & Audits & Power Supply IR 05000029/19890011989-03-29029 March 1989 Insp Rept 50-029/89-01 on 890118-0227.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Insp Findings,Operational Safety Verification,Radiological Controls & Events Requiring Telephone Notification of NRC ML20235Y7951989-03-0202 March 1989 Insp Rept 50-029/88-22 on 881115-890117.Violations Noted. Major Areas Inspected:Licensee Action on Previous Insp Findings,Operational Safety Verification,Esf Sys Walkdown & Licensee Response to Selected Safety Issues ML20206C5391988-11-0202 November 1988 Onsite Regular & Backshift Insp Rept 50-29/88-16 on 880802- 1003.Major Areas Inspected:Licensee Action on Previous Inspector Findings,Operational Safety Verification, Radiological Controls,Plant Events & Maint Observations IR 05000029/19880191988-09-30030 September 1988 Insp Rept 50-029/88-19 on 880909.No Violations Noted.Major Areas Inspected:Circumstances Surrounding Waste Shipments 88-15 & 88-16 from Licensee Facilities to Barnwell,Sc IR 05000029/19880171988-09-23023 September 1988 Insp Rept 50-029/88-17 on 880815-18.No Violations Noted. Major Areas inspected:pre-outage Evaluation,Review of Prior Insp Findings & Observation of in-plant Radiological Controls,Including Mgt & Organization & Personnel Training IR 05000029/19880101988-09-13013 September 1988 Insp Rept 50-029/88-10 on 880601-0801.No Violations Noted. Major Areas Inspected:Licensee Action on Previous Inspector Findings,Operational Safety Verification,Radiological Controls & Events Requiring Telephone Notification to NRC IR 05000029/19880151988-09-0707 September 1988 Insp Rept 50-029/88-15 on 880815-18.No Violations Noted. Major Areas Inspected:Radiochemical Measurements Program Using NRC Mobile Measurements Lab & Licensee Whole Body Counting Facility,Including Confirmatory Measurements IR 05000029/19880141988-08-11011 August 1988 Insp Rept 50-029/88-14 on 880718-22.No Violations Noted. Major Areas Inspected:Implementation of Provisions of Inservice Test Program for Pumps & Valves,Test Procedures & Results & Results of May 1987 Integrated Leak Rate Test IR 05000029/19880131988-08-0303 August 1988 Partially Deleted Physical Security Insp Rept 50-029/88-13 on 880711-15 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Security Organization,Locks,Keys & Combinations,Physical Barriers & Vital Areas IR 05000029/19880121988-07-15015 July 1988 Insp Rept 50-029/88-12 on 880620-24.No Violation Noted.Major Areas Inspected:Radwaste Insp Program,Including Training of Personnel,Procurement of Packaging,Delivery to Carriers, Records & Repts,Waste Classification & Labeling IR 05000029/19880091988-06-21021 June 1988 Onsite Regular & Backshift Insp Rept 50-029/88-09.Violations Noted.Major Areas Inspected:Previous Insp Findings,Bimonthly Safety Sys Verification,Operational Safety Verification, Radiological Controls & Emergency Exercise IR 05000029/19880081988-06-0202 June 1988 Insp Rept 50-029/88-08 on 880426-28.No Violations Noted. Major Areas Inspected:Emergency Preparedness Insp & Observation of Licensee Annual Emergency Exercise Performed on 880426 1999-08-04 Category:INSPECTION REPORT MONTHYEARIR 05000029/19990021999-08-0404 August 1999
[Table view]Insp Rept 50-029/99-02 on 990411-0714.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Safe Operation of Sf Pool,Radiological Controls,Organization & Mgt Controls & Auditing & C/As for Decommissioning Activities IR 05000029/19990011999-05-0505 May 1999 Insp Rept 50-029/99-01 on 990101-0411.No Violations Noted. Major Areas Inspected:Cold Weather Preparations for Spent Fuel Pool,Radiological Controls & self-assessment & Auditing & Corrective Actions for Decommissioning Activities IR 05000029/19980031998-10-0101 October 1998 Insp Rept 50-029/98-03 on 980601-0731.No Violations Noted. Major Areas Inspected:Decommissioning Activities,Including Mods to Spent Fuel Pool Bldg & Radiological Controls IR 05000029/19980011998-06-24024 June 1998 Insp Repts 50-029/98-01 & 50-029/98-02 on 980101-0331.No Violations Noted.Major Areas Inspected:Mod to SFP Bldg, Radiological Controls & Decommissioning Activities IR 05000029/19970021997-09-23023 September 1997 Insp Rept 50-029/97-02 on 970401-0814.No Violations Noted. Major Areas Inspected:Licensee Activities Re Decommissioning IR 05000029/19970011997-05-16016 May 1997 Insp Rept 50-029/97-01 on 970301-31.No Violations Noted. Major Areas Inspected:Facility Operations IR 05000029/19960041997-01-24024 January 1997 Insp Rept 50-029/96-04 on 961119-21.No Violations Noted. Major Areas Inspected:Insp Verified by Observation, Documentation Review &/Or Discussions W/Responsible or Involved Plant Staff IR 05000029/19960031996-10-16016 October 1996 Insp Rept 50-029/96-03 on 960827-29.No Violations Noted. Major Areas Inspected:Operations,Rp Program,Including Operations,Staffing,Mgt & Licensee Experience in Identifying & Correcting Weaknesses Re Control of Radioactive Matls IR 05000029/19930071993-12-28028 December 1993 Insp Rept 50-029/93-07 on 930826-1118.Violation Noted. Major Areas Inspected:Posting of Radiological Areas & Other Controls,Organization & Staffing,Exposure ALARA Program & Radiological Info Available to Workers IR 05000029/19930081993-11-0909 November 1993 Insp Rept 50-029/93-08 on 931018-19.No Violations Noted. Major Areas Inspected:Mgt Support & Audits Protected Area Barriers,Detection & Assessment Aids Protected Area Access Control of Personnel,Alarm Stations & Communications IR 05000029/19930051993-08-18018 August 1993 Insp Rept 50-029/93-05 on 930510-0731.No Violations Noted. Major Areas Inspected:Operations,Maint Engineering & Plant Support,Including Radiological Controls,Security,Fire Protection & Housekeeping & Administration IR 05000029/19920111993-02-0505 February 1993 Insp Rept 50-029/92-11 on 921114-930201.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Control, Security,Engineering & Technical Support & Safety Assessment & Quality Verification IR 05000029/19920101992-11-23023 November 1992 Insp Rept 50-029/92-10 on 921104-06.One Open Items Noted. Major Areas Inspected:Contamination Monitoring of Guardhouse,Postings & Other Controls,Radiological Control of Work in Progress & Organization & Staffing ML20127F1051992-11-23023 November 1992 Corrected Cover Page for Insp Rept 50-029/92-10 on 921104-06.No Radiological Safety Concerns or Violations Noted.Major Areas Inspected:Contamination Monitoring at Guardhouse,Postings & Other Controls Observed During Tours IR 05000029/19900231990-12-0505 December 1990 Insp Rept 50-029/90-23 on 901105-09.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Controls & Radiological Environ Monitoring Programs ML20062H0801990-11-19019 November 1990 Insp Rept 50-029/90-21 on 901015-19.Noncited Violation Noted.Areas Inspected:Response to Bulletin 79-14 Re Seismic Analysis of as-built safety-related Piping Sys IR 05000029/19900161990-11-0606 November 1990 Insp Rept 50-029/90-16 on 900821-1001.Violation Noted.Major Areas Inspected:Daytime & Backshifts in Areas of Plant Operations,Radiological Controls,Maint & Surveillance, Emergency Preparedness,Security IR 05000029/19900811990-09-28028 September 1990 Insp Rept 50-029/90-81 on 900709-20 & 0806-10.Weaknesses & Unresolved Item Noted.Major Areas Inspected:Maint Program IR 05000029/19900121990-09-24024 September 1990 Insp Rept 50-029/90-12 on 900619-0820.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Security,Engineering/Technical Support,Safety Assessment/Quality Verification & Repts ML20058D3651990-09-14014 September 1990 Insp Rept 50-029/90-17 on 900730-0803.No Violations Noted. Major Areas Inspected:Audit of Licensee Action in Response to Recommendation Described in Generic Ltr 88-17 ML20059K7171990-09-0707 September 1990 Insp Rept 50-029/90-14 on 900802-27.Violations Noted Re Failure to Demonstrate Emergency Diesel Generators Operability at Required Capacity Under Design Basis Conditions.Major Areas Inspected:Emergency Diesel Generator IR 05000029/19900131990-08-0303 August 1990 Insp Rept 50-029/90-13 on 900709-13.One Noncited Violation Noted.Major Areas Inspected:Implementation of Radiation Protection Program During Current Refueling Outage & Review of Training & Qualification of Contractor Technicians IR 05000029/19900111990-08-0101 August 1990 Insp Rept 50-029/90-11 on 900619-22.No Violations or Deviations Noted.Major Areas Inspected:Safety Injection Tank Design & Replacement Procedures Together W/Walkdown of Safety Injection Sys Pumps,Valves & Piping IR 05000029/19900091990-07-16016 July 1990 Insp Rept 50-029/90-09 on 900515-0618.No Violations Noted. Major Areas Inspected:Operational Safety,Plant Operations, Radiological Controls,Maint & Surveillance,Emergency Preparedness,Security & Engineering/Technical Support IR 05000029/19900051990-02-16016 February 1990 Physical Security Insp Rept 50-029/90-05 on 900207-09.No Violations Noted.Major Areas Inspected:Implementation of Safeguards Info & Personnel Access Control Programs at Corporate Ofc IR 05000029/19890111989-08-28028 August 1989 Insp Rept 50-029/89-11 on 890626-0731.Unresolved Items Noted Re Plant Operations Review Committee Actions to Address Task Force Investigation Results of 890725 Loss of Emergency Bus.Areas Investigated:Security & LERs IR 05000029/19890131989-08-23023 August 1989 Physical Security Insp Rept 50-029/89-13 on 890724-28.No Violations Noted.Major Areas Inspected:Action on Findings of NRC Regulatory Effectiveness Review,Mgt Support,Security Program Plan,Audits & Protected & Vital Area Physical IR 05000029/19890151989-08-15015 August 1989 Emergency Preparedness Insp Rept 50-029/89-15 on 890731-0803.No Violations Noted.Major Areas Inspected: Changes to Emergency Preparedness Program & Facilities, Equipment,Instrumentation & Supplies ML20246Q0301989-08-10010 August 1989 Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected: Corporate Engineering & Offsite Support for Plants & Implementation of Mods IR 05000029/19890121989-08-0101 August 1989 Insp Rept 50-029/89-12 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Sys, Transportation & Liquid & Gaseous Effluents Programs, Including:Mgt Controls,Audits,Qa & Program Implementation IR 05000029/19890091989-07-25025 July 1989 Insp Rept 50-029/89-09 on 890522-0625.No Violations Noted. Major Areas Inspected:Daytime & Backshifts of Previous Insp Findings,Operational Safety,Security,Plant Operations,Maint & Surveillance,Engineering Support & LERs IR 05000029/19890101989-07-20020 July 1989 Insp Rept 50-029/89-10 on 890705-07.No Violations Noted. Major Areas Inspected:Operational Radiological Environ Monitoring Program Including Mgt Controls & Licensee Program for QC of Analytical Measurements IR 05000029/19890061989-07-14014 July 1989 Insp Rept 50-029/89-06 on 890410-0521.Violations Noted. Major Areas Inspected:Actions on Previous Insp Findings, Operational Safety,Security,Plant Operations,Maint & Surveillance,Engineering Support & Radiological Controls IR 05000029/19890081989-07-0606 July 1989 Insp Rept 50-029/89-08 on 890530-0601.No Violations Noted. Major Areas Inspected:Fire Protection/Prevention Program, Including Program Admin & Organization,Admin Control & Combustibles & Admin Control of Ignition Sources IR 05000029/19890071989-06-0707 June 1989 Insp Rept 50-029/89-07 on 890524-26.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Findings, Changes in Radiation Protection Program & ALARA IR 05000029/19890021989-05-0404 May 1989 Insp Rept 50-029/89-02 on 890228-0410.No Unacceptable Conditions Noted.Major Areas Inspected:Operation Safety, Security,Plant Operation,Maint & Surveillance,Engineering Support & Radiological Controls IR 05000029/19890051989-05-0202 May 1989 Insp Rept 50-029/89-05 on 890403-07.No Violations Noted. Major Areas Inspected:Review of Util Actions on NRC Identified Previous Concern Re Generic Ltr 83-28,Item 2.2.2, Vendor Interface & commercial-grade Item Program IR 05000029/19890041989-04-25025 April 1989 Partially Deleted Insp Rept 50-029/89-04 on 890403-07 (Ref 10CFR73.21).Noncompliance Noted.Major Areas Inspected: Licensee Action on Findings in NRC Rer,Mgt Support,Security Program Plans & Audits & Power Supply IR 05000029/19890011989-03-29029 March 1989 Insp Rept 50-029/89-01 on 890118-0227.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Insp Findings,Operational Safety Verification,Radiological Controls & Events Requiring Telephone Notification of NRC ML20235Y7951989-03-0202 March 1989 Insp Rept 50-029/88-22 on 881115-890117.Violations Noted. Major Areas Inspected:Licensee Action on Previous Insp Findings,Operational Safety Verification,Esf Sys Walkdown & Licensee Response to Selected Safety Issues ML20206C5391988-11-0202 November 1988 Onsite Regular & Backshift Insp Rept 50-29/88-16 on 880802- 1003.Major Areas Inspected:Licensee Action on Previous Inspector Findings,Operational Safety Verification, Radiological Controls,Plant Events & Maint Observations IR 05000029/19880191988-09-30030 September 1988 Insp Rept 50-029/88-19 on 880909.No Violations Noted.Major Areas Inspected:Circumstances Surrounding Waste Shipments 88-15 & 88-16 from Licensee Facilities to Barnwell,Sc IR 05000029/19880171988-09-23023 September 1988 Insp Rept 50-029/88-17 on 880815-18.No Violations Noted. Major Areas inspected:pre-outage Evaluation,Review of Prior Insp Findings & Observation of in-plant Radiological Controls,Including Mgt & Organization & Personnel Training IR 05000029/19880101988-09-13013 September 1988 Insp Rept 50-029/88-10 on 880601-0801.No Violations Noted. Major Areas Inspected:Licensee Action on Previous Inspector Findings,Operational Safety Verification,Radiological Controls & Events Requiring Telephone Notification to NRC IR 05000029/19880151988-09-0707 September 1988 Insp Rept 50-029/88-15 on 880815-18.No Violations Noted. Major Areas Inspected:Radiochemical Measurements Program Using NRC Mobile Measurements Lab & Licensee Whole Body Counting Facility,Including Confirmatory Measurements IR 05000029/19880141988-08-11011 August 1988 Insp Rept 50-029/88-14 on 880718-22.No Violations Noted. Major Areas Inspected:Implementation of Provisions of Inservice Test Program for Pumps & Valves,Test Procedures & Results & Results of May 1987 Integrated Leak Rate Test IR 05000029/19880131988-08-0303 August 1988 Partially Deleted Physical Security Insp Rept 50-029/88-13 on 880711-15 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Security Organization,Locks,Keys & Combinations,Physical Barriers & Vital Areas IR 05000029/19880121988-07-15015 July 1988 Insp Rept 50-029/88-12 on 880620-24.No Violation Noted.Major Areas Inspected:Radwaste Insp Program,Including Training of Personnel,Procurement of Packaging,Delivery to Carriers, Records & Repts,Waste Classification & Labeling IR 05000029/19880091988-06-21021 June 1988 Onsite Regular & Backshift Insp Rept 50-029/88-09.Violations Noted.Major Areas Inspected:Previous Insp Findings,Bimonthly Safety Sys Verification,Operational Safety Verification, Radiological Controls & Emergency Exercise IR 05000029/19880081988-06-0202 June 1988 Insp Rept 50-029/88-08 on 880426-28.No Violations Noted. Major Areas Inspected:Emergency Preparedness Insp & Observation of Licensee Annual Emergency Exercise Performed on 880426 1999-08-04 Category:UTILITY MONTHYEARIR 05000029/19900161990-11-0606 November 1990
[Table view]Insp Rept 50-029/90-16 on 900821-1001.Violation Noted.Major Areas Inspected:Daytime & Backshifts in Areas of Plant Operations,Radiological Controls,Maint & Surveillance, Emergency Preparedness,Security IR 05000029/19900811990-09-28028 September 1990 Insp Rept 50-029/90-81 on 900709-20 & 0806-10.Weaknesses & Unresolved Item Noted.Major Areas Inspected:Maint Program IR 05000029/19900121990-09-24024 September 1990 Insp Rept 50-029/90-12 on 900619-0820.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Security,Engineering/Technical Support,Safety Assessment/Quality Verification & Repts ML20059K7171990-09-0707 September 1990 Insp Rept 50-029/90-14 on 900802-27.Violations Noted Re Failure to Demonstrate Emergency Diesel Generators Operability at Required Capacity Under Design Basis Conditions.Major Areas Inspected:Emergency Diesel Generator IR 05000029/19900131990-08-0303 August 1990 Insp Rept 50-029/90-13 on 900709-13.One Noncited Violation Noted.Major Areas Inspected:Implementation of Radiation Protection Program During Current Refueling Outage & Review of Training & Qualification of Contractor Technicians IR 05000029/19900111990-08-0101 August 1990 Insp Rept 50-029/90-11 on 900619-22.No Violations or Deviations Noted.Major Areas Inspected:Safety Injection Tank Design & Replacement Procedures Together W/Walkdown of Safety Injection Sys Pumps,Valves & Piping IR 05000029/19900091990-07-16016 July 1990 Insp Rept 50-029/90-09 on 900515-0618.No Violations Noted. Major Areas Inspected:Operational Safety,Plant Operations, Radiological Controls,Maint & Surveillance,Emergency Preparedness,Security & Engineering/Technical Support IR 05000029/19900051990-02-16016 February 1990 Physical Security Insp Rept 50-029/90-05 on 900207-09.No Violations Noted.Major Areas Inspected:Implementation of Safeguards Info & Personnel Access Control Programs at Corporate Ofc IR 05000029/19890111989-08-28028 August 1989 Insp Rept 50-029/89-11 on 890626-0731.Unresolved Items Noted Re Plant Operations Review Committee Actions to Address Task Force Investigation Results of 890725 Loss of Emergency Bus.Areas Investigated:Security & LERs IR 05000029/19890131989-08-23023 August 1989 Physical Security Insp Rept 50-029/89-13 on 890724-28.No Violations Noted.Major Areas Inspected:Action on Findings of NRC Regulatory Effectiveness Review,Mgt Support,Security Program Plan,Audits & Protected & Vital Area Physical IR 05000029/19890151989-08-15015 August 1989 Emergency Preparedness Insp Rept 50-029/89-15 on 890731-0803.No Violations Noted.Major Areas Inspected: Changes to Emergency Preparedness Program & Facilities, Equipment,Instrumentation & Supplies ML20246Q0301989-08-10010 August 1989 Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected: Corporate Engineering & Offsite Support for Plants & Implementation of Mods IR 05000029/19890121989-08-0101 August 1989 Insp Rept 50-029/89-12 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Sys, Transportation & Liquid & Gaseous Effluents Programs, Including:Mgt Controls,Audits,Qa & Program Implementation IR 05000029/19890091989-07-25025 July 1989 Insp Rept 50-029/89-09 on 890522-0625.No Violations Noted. Major Areas Inspected:Daytime & Backshifts of Previous Insp Findings,Operational Safety,Security,Plant Operations,Maint & Surveillance,Engineering Support & LERs IR 05000029/19890061989-07-14014 July 1989 Insp Rept 50-029/89-06 on 890410-0521.Violations Noted. Major Areas Inspected:Actions on Previous Insp Findings, Operational Safety,Security,Plant Operations,Maint & Surveillance,Engineering Support & Radiological Controls IR 05000029/19890081989-07-0606 July 1989 Insp Rept 50-029/89-08 on 890530-0601.No Violations Noted. Major Areas Inspected:Fire Protection/Prevention Program, Including Program Admin & Organization,Admin Control & Combustibles & Admin Control of Ignition Sources IR 05000029/19890071989-06-0707 June 1989 Insp Rept 50-029/89-07 on 890524-26.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Findings, Changes in Radiation Protection Program & ALARA IR 05000029/19890021989-05-0404 May 1989 Insp Rept 50-029/89-02 on 890228-0410.No Unacceptable Conditions Noted.Major Areas Inspected:Operation Safety, Security,Plant Operation,Maint & Surveillance,Engineering Support & Radiological Controls IR 05000029/19890051989-05-0202 May 1989 Insp Rept 50-029/89-05 on 890403-07.No Violations Noted. Major Areas Inspected:Review of Util Actions on NRC Identified Previous Concern Re Generic Ltr 83-28,Item 2.2.2, Vendor Interface & commercial-grade Item Program IR 05000029/19890041989-04-25025 April 1989 Partially Deleted Insp Rept 50-029/89-04 on 890403-07 (Ref 10CFR73.21).Noncompliance Noted.Major Areas Inspected: Licensee Action on Findings in NRC Rer,Mgt Support,Security Program Plans & Audits & Power Supply IR 05000029/19890011989-03-29029 March 1989 Insp Rept 50-029/89-01 on 890118-0227.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Insp Findings,Operational Safety Verification,Radiological Controls & Events Requiring Telephone Notification of NRC ML20206C5391988-11-0202 November 1988 Onsite Regular & Backshift Insp Rept 50-29/88-16 on 880802- 1003.Major Areas Inspected:Licensee Action on Previous Inspector Findings,Operational Safety Verification, Radiological Controls,Plant Events & Maint Observations IR 05000029/19880191988-09-30030 September 1988 Insp Rept 50-029/88-19 on 880909.No Violations Noted.Major Areas Inspected:Circumstances Surrounding Waste Shipments 88-15 & 88-16 from Licensee Facilities to Barnwell,Sc IR 05000029/19880171988-09-23023 September 1988 Insp Rept 50-029/88-17 on 880815-18.No Violations Noted. Major Areas inspected:pre-outage Evaluation,Review of Prior Insp Findings & Observation of in-plant Radiological Controls,Including Mgt & Organization & Personnel Training IR 05000029/19880151988-09-0707 September 1988 Insp Rept 50-029/88-15 on 880815-18.No Violations Noted. Major Areas Inspected:Radiochemical Measurements Program Using NRC Mobile Measurements Lab & Licensee Whole Body Counting Facility,Including Confirmatory Measurements IR 05000029/19880141988-08-11011 August 1988 Insp Rept 50-029/88-14 on 880718-22.No Violations Noted. Major Areas Inspected:Implementation of Provisions of Inservice Test Program for Pumps & Valves,Test Procedures & Results & Results of May 1987 Integrated Leak Rate Test IR 05000029/19880131988-08-0303 August 1988 Partially Deleted Physical Security Insp Rept 50-029/88-13 on 880711-15 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Security Organization,Locks,Keys & Combinations,Physical Barriers & Vital Areas IR 05000029/19880121988-07-15015 July 1988 Insp Rept 50-029/88-12 on 880620-24.No Violation Noted.Major Areas Inspected:Radwaste Insp Program,Including Training of Personnel,Procurement of Packaging,Delivery to Carriers, Records & Repts,Waste Classification & Labeling IR 05000029/19880091988-06-21021 June 1988 Onsite Regular & Backshift Insp Rept 50-029/88-09.Violations Noted.Major Areas Inspected:Previous Insp Findings,Bimonthly Safety Sys Verification,Operational Safety Verification, Radiological Controls & Emergency Exercise IR 05000029/19880081988-06-0202 June 1988 Insp Rept 50-029/88-08 on 880426-28.No Violations Noted. Major Areas Inspected:Emergency Preparedness Insp & Observation of Licensee Annual Emergency Exercise Performed on 880426 IR 05000029/19880051988-05-0606 May 1988 Insp Rept 50-029/88-05 on 880223-0331.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on Previous Findings,Operational Safety Verification,Lers, Radiological Controls & Maint & Surveillance Observations IR 05000029/19880021988-04-21021 April 1988 Insp Rept 50-029/88-02 on 880110-15.Violation Noted.Major Areas Inspected:Licensee Mgt,General Plant Operations, Control Room Operations,Surveillance Testing,Plant Maint Activities,Design Changes & Engineering Support IR 05000029/19880061988-04-11011 April 1988 Insp Rept 50-029/88-06 on 880420.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program IR 05000029/19880041988-03-31031 March 1988 Insp Rept 50-029/88-04 on 880208-11.Violation Noted.Major Areas Inspected:Licensee Implementation of Radiation Protection Program During Routine Operations,Including Status of Previously Identified Items & Mgt Controls IR 05000029/19880031988-03-25025 March 1988 Partially Withheld Physical Security Insp Rept 50-029/88-03 on 880208-11 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Plan & Implementing Procedures,Physical barriers-protected,vital & Access Control Areas ML20150C5051988-03-14014 March 1988 Insp Rept 50-29/88-01 on 880120-0222.No Violations Noted. Major Areas Inspected:Actions on Previous Insp Findings & Operational Safety Verification.Items of Concerns Include Dedicating Commercial Parts for Safety Class Generators IR 05000029/19870111988-02-19019 February 1988 Insp Rept 50-029/87-11 on 870721-1026.No Violations Noted. Two Unresolved Items Identified.Major Areas Inspected: Licensee Action of Previous Insp Findings,Nrc Bulletins & Operational Safety Verification ML20149J1711988-02-12012 February 1988 Insp Rept 50-029/87-16 on 871027-880119.Violations Noted. Major Areas Inspected:Operational Safety Verification, Radiological Controls,Events Requiring Telephone Notification to Nrc,Plant Events & Maint Operations IR 05000029/19870061987-12-0808 December 1987 Page 37 of Insp Rept 50-029/87-06 Re Mgt Meetings Inadvertently Omitted When Rept Distributed IR 05000029/19870151987-12-0202 December 1987 Special Insp Rept 50-029/87-15 on 871020.No Violations Noted.Major Areas Inspected:Resolution of Two Outstanding Issues Re Apparent Overexposure of Steam Generator Worker & Measurements Related to Hot Particles ML20236F6091987-10-23023 October 1987 Insp Rept 50-029/87-06 on 870427-0720.No Violations Noted. Three Inadequacies Noted.Major Areas Inspected:Licensee Action on Previous Findings,Operational Safety Verification & Radiological Controls IR 05000029/19870141987-10-15015 October 1987 Insp Rept 50-029/87-14 on 870831-0902.No Violations Noted. Major Areas Inspected:Licensed Operator Training Conducted Since Nov 1986 & Future Training IR 05000029/19870131987-09-15015 September 1987 Insp Rept 50-029/87-13 on 870830-0902.No Violations Noted. Major Areas Inspected:Changes to Emergency Preparedness Program,Licensee Reviews/Audits,Shift Staffing & Augmentation & Training ML20235E9111987-09-0303 September 1987 Insp Rept 50-029/87-07 on 870511-29.Violations Noted.Major Areas Inspected:Steam Generator Tube Eddy Current Surveillance Test Sampling,Eddy Current Data Analyses, Secondary Water Chemistry Controls & Visual Insps IR 05000029/19870121987-08-27027 August 1987 Insp Rept 50-029/87-12 on 870810-14.No Violations or Deviations Noted.Major Areas Inspected:Nonlicensed Staff Training & Followup on Previous Insp Findings IR 05000029/19870101987-08-21021 August 1987 Radiololgical Controls Insp Rept 50-029/87-10 on 870615-19. Violations Noted.Major Areas Inspected:Program to Control Exposure from Radioactive Particles & Circumstances Surrounding 870530 Incident of Exposure ML20235H2371987-07-0202 July 1987 Insp Rept 50-029/87-09 on 870518-22.Major Areas Inspected: Implementation of Radiation Protection Program During Refueling Outage,External Exposure Control & Control of Radiation Matl & Contamination.Listed Weaknesses Noted IR 05000029/19870161987-06-30030 June 1987 Enforcement Conference Rept 50-219/87-16 on 870610.Licensee Presented Background & Supplemental Info Re Violations Identified in Insp Rept 50-029/87-16 IR 05000029/19870081987-06-12012 June 1987 Partially Withheld Physical Security Insp Rept 50-029/87-08 on 870218-0522 (Ref 10CFR73.21).Violations Noted:Failure to Implement Compensatory Measures for Degraded Security Sys IR 05000029/19870021987-05-12012 May 1987 Insp Rept 50-029/87-02 on 870127-0417.Violations Noted: Failure to Provide Adequate Review Prior to Implementation of Temporary Change Request Re Main Coolant Pressure Channel 1990-09-07 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARIR 05000029/19990021999-08-0404 August 1999
[Table view]Insp Rept 50-029/99-02 on 990411-0714.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Safe Operation of Sf Pool,Radiological Controls,Organization & Mgt Controls & Auditing & C/As for Decommissioning Activities IR 05000029/19990011999-05-0505 May 1999 Insp Rept 50-029/99-01 on 990101-0411.No Violations Noted. Major Areas Inspected:Cold Weather Preparations for Spent Fuel Pool,Radiological Controls & self-assessment & Auditing & Corrective Actions for Decommissioning Activities IR 05000029/19980031998-10-0101 October 1998 Insp Rept 50-029/98-03 on 980601-0731.No Violations Noted. Major Areas Inspected:Decommissioning Activities,Including Mods to Spent Fuel Pool Bldg & Radiological Controls IR 05000029/19980011998-06-24024 June 1998 Insp Repts 50-029/98-01 & 50-029/98-02 on 980101-0331.No Violations Noted.Major Areas Inspected:Mod to SFP Bldg, Radiological Controls & Decommissioning Activities IR 05000029/19970021997-09-23023 September 1997 Insp Rept 50-029/97-02 on 970401-0814.No Violations Noted. Major Areas Inspected:Licensee Activities Re Decommissioning IR 05000029/19970011997-05-16016 May 1997 Insp Rept 50-029/97-01 on 970301-31.No Violations Noted. Major Areas Inspected:Facility Operations PNO-I-97-026, on 970427,Yankee Atomic Electric Will Begin Shipment of Reactor Vessel for Disposal.First Phase of Shipment Will Involve Heavy Haul Truck from Rowe,Ma Site to Railway Approx Six Miles Away Near Hoosac Tunnel1997-04-25025 April 1997 PNO-I-97-026:on 970427,Yankee Atomic Electric Will Begin Shipment of Reactor Vessel for Disposal.First Phase of Shipment Will Involve Heavy Haul Truck from Rowe,Ma Site to Railway Approx Six Miles Away Near Hoosac Tunnel IR 05000029/19960041997-01-24024 January 1997 Insp Rept 50-029/96-04 on 961119-21.No Violations Noted. Major Areas Inspected:Insp Verified by Observation, Documentation Review &/Or Discussions W/Responsible or Involved Plant Staff IR 05000029/19960031996-10-16016 October 1996 Insp Rept 50-029/96-03 on 960827-29.No Violations Noted. Major Areas Inspected:Operations,Rp Program,Including Operations,Staffing,Mgt & Licensee Experience in Identifying & Correcting Weaknesses Re Control of Radioactive Matls ML20059D6441993-12-28028 December 1993 Notice of Violation from Insp on 930826-1118.Violation Noted:On 930826,inspector Found Several Examples of High Radiation Areas Where Licensee Did Not Barricade or Properly Control Access to Prevent Inadvertent Entry IR 05000029/19930071993-12-28028 December 1993 Insp Rept 50-029/93-07 on 930826-1118.Violation Noted. Major Areas Inspected:Posting of Radiological Areas & Other Controls,Organization & Staffing,Exposure ALARA Program & Radiological Info Available to Workers PNO-I-93-070, on 931208,last Four SGs from Yankee Rowe Plant Transported by Heavy Hauler Truck & Trailer to Rail Line Approx Six Miles from Plant.One Protester Observed.States of Ma & VT Informed1993-12-0909 December 1993 PNO-I-93-070:on 931208,last Four SGs from Yankee Rowe Plant Transported by Heavy Hauler Truck & Trailer to Rail Line Approx Six Miles from Plant.One Protester Observed.States of Ma & VT Informed PNO-I-93-067, on 931207,painted-over School Bus Containing Protestors from Citizen Awareness Network & Greenpeace Blocked Yankee Rowe Access Route in Effort to Prevent Off Site Transport of Third of Four SGs1993-12-0707 December 1993 PNO-I-93-067:on 931207,painted-over School Bus Containing Protestors from Citizen Awareness Network & Greenpeace Blocked Yankee Rowe Access Route in Effort to Prevent Off Site Transport of Third of Four SGs ML20059M5771993-11-15015 November 1993 PNO-1-93-064A:on 931116 & 17,util Plans to Ship Two of Four Steam Generators from Plant to Radwaste Depository at Barnwell,Sc.Licensee Will Evaluate Weather Conditions on Morning of Transportation.Commonwealth of Ma Informed IR 05000029/19930081993-11-0909 November 1993 Insp Rept 50-029/93-08 on 931018-19.No Violations Noted. Major Areas Inspected:Mgt Support & Audits Protected Area Barriers,Detection & Assessment Aids Protected Area Access Control of Personnel,Alarm Stations & Communications IR 05000029/19930051993-08-18018 August 1993 Insp Rept 50-029/93-05 on 930510-0731.No Violations Noted. Major Areas Inspected:Operations,Maint Engineering & Plant Support,Including Radiological Controls,Security,Fire Protection & Housekeeping & Administration IR 05000029/19920111993-02-0505 February 1993 Insp Rept 50-029/92-11 on 921114-930201.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Control, Security,Engineering & Technical Support & Safety Assessment & Quality Verification IR 05000029/19920101992-11-23023 November 1992 Insp Rept 50-029/92-10 on 921104-06.One Open Items Noted. Major Areas Inspected:Contamination Monitoring of Guardhouse,Postings & Other Controls,Radiological Control of Work in Progress & Organization & Staffing ML20127F1051992-11-23023 November 1992 Corrected Cover Page for Insp Rept 50-029/92-10 on 921104-06.No Radiological Safety Concerns or Violations Noted.Major Areas Inspected:Contamination Monitoring at Guardhouse,Postings & Other Controls Observed During Tours IR 05000029/19900231990-12-0505 December 1990 Insp Rept 50-029/90-23 on 901105-09.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Controls & Radiological Environ Monitoring Programs ML20062H0801990-11-19019 November 1990 Insp Rept 50-029/90-21 on 901015-19.Noncited Violation Noted.Areas Inspected:Response to Bulletin 79-14 Re Seismic Analysis of as-built safety-related Piping Sys PNO-I-90-096, on 901109,reactor Manually Tripped Following Receipt of Alarms Indicating Automatic Scram Occurred1990-11-0909 November 1990 PNO-I-90-096:on 901109,reactor Manually Tripped Following Receipt of Alarms Indicating Automatic Scram Occurred ML20197H7151990-11-0606 November 1990 Notice of Violation from Insp on 900821-1001.Violation Noted:Corrective Action Implemented as Result of Failures of Emergency Lighting Surveillance Test Failed to Preclude Repetition of Failures IR 05000029/19900161990-11-0606 November 1990 Insp Rept 50-029/90-16 on 900821-1001.Violation Noted.Major Areas Inspected:Daytime & Backshifts in Areas of Plant Operations,Radiological Controls,Maint & Surveillance, Emergency Preparedness,Security ML20058D2871990-10-19019 October 1990 Notice of Violation from Insp on 900802-27.Violation Noted:Failure to Adequately Test EDGs After Major Overhaul IR 05000029/19900811990-09-28028 September 1990 Insp Rept 50-029/90-81 on 900709-20 & 0806-10.Weaknesses & Unresolved Item Noted.Major Areas Inspected:Maint Program IR 05000029/19900121990-09-24024 September 1990 Insp Rept 50-029/90-12 on 900619-0820.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Security,Engineering/Technical Support,Safety Assessment/Quality Verification & Repts ML20058D3651990-09-14014 September 1990 Insp Rept 50-029/90-17 on 900730-0803.No Violations Noted. Major Areas Inspected:Audit of Licensee Action in Response to Recommendation Described in Generic Ltr 88-17 ML20059K7171990-09-0707 September 1990 Insp Rept 50-029/90-14 on 900802-27.Violations Noted Re Failure to Demonstrate Emergency Diesel Generators Operability at Required Capacity Under Design Basis Conditions.Major Areas Inspected:Emergency Diesel Generator IR 05000029/19900131990-08-0303 August 1990 Insp Rept 50-029/90-13 on 900709-13.One Noncited Violation Noted.Major Areas Inspected:Implementation of Radiation Protection Program During Current Refueling Outage & Review of Training & Qualification of Contractor Technicians IR 05000029/19900111990-08-0101 August 1990 Insp Rept 50-029/90-11 on 900619-22.No Violations or Deviations Noted.Major Areas Inspected:Safety Injection Tank Design & Replacement Procedures Together W/Walkdown of Safety Injection Sys Pumps,Valves & Piping IR 05000029/19900061990-07-24024 July 1990 Exam Rept 50-029/90-06OL on 900619-21.Exam Results:All Three Candidates Passed Exams & Issued Licenses IR 05000029/19900091990-07-16016 July 1990 Insp Rept 50-029/90-09 on 900515-0618.No Violations Noted. Major Areas Inspected:Operational Safety,Plant Operations, Radiological Controls,Maint & Surveillance,Emergency Preparedness,Security & Engineering/Technical Support PNO-I-90-042, on 900519,security Discovered Unauthorized Firearm Behind Seat of Contractor Truck in Protected Area. Driver Stated Weapon Hidden Under Numerous Other Items & Slipped His Mind.Firearm Almost Rusted Closed1990-05-21021 May 1990 PNO-I-90-042:on 900519,security Discovered Unauthorized Firearm Behind Seat of Contractor Truck in Protected Area. Driver Stated Weapon Hidden Under Numerous Other Items & Slipped His Mind.Firearm Almost Rusted Closed IR 05000029/19900051990-02-16016 February 1990 Physical Security Insp Rept 50-029/90-05 on 900207-09.No Violations Noted.Major Areas Inspected:Implementation of Safeguards Info & Personnel Access Control Programs at Corporate Ofc IR 05000029/19890111989-08-28028 August 1989 Insp Rept 50-029/89-11 on 890626-0731.Unresolved Items Noted Re Plant Operations Review Committee Actions to Address Task Force Investigation Results of 890725 Loss of Emergency Bus.Areas Investigated:Security & LERs PNO-I-89-073, on 890825,when Tagging Removed on 5-inch Diameter Bypass Line,Pressure Boundary Leakage Discovered from Defect in Socket Weld Connection Between Vent & Bypass Lines.Plant Shutdown.Leakage Rate Less than 1 Gpm1989-08-25025 August 1989 PNO-I-89-073:on 890825,when Tagging Removed on 5-inch Diameter Bypass Line,Pressure Boundary Leakage Discovered from Defect in Socket Weld Connection Between Vent & Bypass Lines.Plant Shutdown.Leakage Rate Less than 1 Gpm IR 05000029/19890131989-08-23023 August 1989 Physical Security Insp Rept 50-029/89-13 on 890724-28.No Violations Noted.Major Areas Inspected:Action on Findings of NRC Regulatory Effectiveness Review,Mgt Support,Security Program Plan,Audits & Protected & Vital Area Physical PNO-I-89-071, on 890816,licensee Began Controlled Power Reduction to 20% of Rated Power to Investigate Leaking Inlet Flange of Safety Valve Located on Bypass Line of Main Coolant Loop 2.Flange Become Encrusted W/Solidified Boron1989-08-17017 August 1989 PNO-I-89-071:on 890816,licensee Began Controlled Power Reduction to 20% of Rated Power to Investigate Leaking Inlet Flange of Safety Valve Located on Bypass Line of Main Coolant Loop 2.Flange Become Encrusted W/Solidified Boron IR 05000029/19890151989-08-15015 August 1989 Emergency Preparedness Insp Rept 50-029/89-15 on 890731-0803.No Violations Noted.Major Areas Inspected: Changes to Emergency Preparedness Program & Facilities, Equipment,Instrumentation & Supplies ML20246Q0301989-08-10010 August 1989 Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected: Corporate Engineering & Offsite Support for Plants & Implementation of Mods IR 05000029/19890031989-08-0909 August 1989 Requalification Exam Rept 50-029/89-03OL on 890620-30.Exam Results:Six Senior Reactor Operators (SRO) & Six Reactor Operators Passed Exams.Three SROs Failed One or More Portions of Exams IR 05000029/19890121989-08-0101 August 1989 Insp Rept 50-029/89-12 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Sys, Transportation & Liquid & Gaseous Effluents Programs, Including:Mgt Controls,Audits,Qa & Program Implementation IR 05000029/19890091989-07-25025 July 1989 Insp Rept 50-029/89-09 on 890522-0625.No Violations Noted. Major Areas Inspected:Daytime & Backshifts of Previous Insp Findings,Operational Safety,Security,Plant Operations,Maint & Surveillance,Engineering Support & LERs IR 05000029/19890101989-07-20020 July 1989 Insp Rept 50-029/89-10 on 890705-07.No Violations Noted. Major Areas Inspected:Operational Radiological Environ Monitoring Program Including Mgt Controls & Licensee Program for QC of Analytical Measurements ML20247B0801989-07-14014 July 1989 Notice of Violation from Insp on 890410-0521.Violation Noted:Licensee Failed to Properly Restore Circuitry Configuration of Module in Control Room Main Fire Panel During Surveillance Testing IR 05000029/19890061989-07-14014 July 1989 Insp Rept 50-029/89-06 on 890410-0521.Violations Noted. Major Areas Inspected:Actions on Previous Insp Findings, Operational Safety,Security,Plant Operations,Maint & Surveillance,Engineering Support & Radiological Controls IR 05000029/19890081989-07-0606 July 1989 Insp Rept 50-029/89-08 on 890530-0601.No Violations Noted. Major Areas Inspected:Fire Protection/Prevention Program, Including Program Admin & Organization,Admin Control & Combustibles & Admin Control of Ignition Sources IR 05000029/19890071989-06-0707 June 1989 Insp Rept 50-029/89-07 on 890524-26.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Findings, Changes in Radiation Protection Program & ALARA IR 05000029/19890021989-05-0404 May 1989 Insp Rept 50-029/89-02 on 890228-0410.No Unacceptable Conditions Noted.Major Areas Inspected:Operation Safety, Security,Plant Operation,Maint & Surveillance,Engineering Support & Radiological Controls 1999-08-04 |
Inspection Report - Yankee Rowe - 1985023 | |
---|---|
Text
?,,
.
4-U'.S. NUCLEAR REGULATORY COMMISSION
REGION I
~ Report N . Docket N License No. OPR-3 Priority -
Category C
= Licensee: Yankee Atomic Electric Company 1671 Worcester Road Framingham, Massachusetts 01701 Facility Name: Yankee Nuclear Power Station
.,
Inspection At: Rowe, Massachusetts u
L Inspection Conducted: October 28 to November 1, 1985 Inspectors: _
wjm // 27 Tifcfna , Radia' tion Specialist ' date sails JohnMcFadd'en','RadiafionSpecialist n date Approved by: M.%4 Mohamed Shar:Taky, Chief,/
& #/27 /24'
'
dat'e PWR Radiation Protection Section Inspection Summary:
Inspection on October 28 to November 1, 1985 (Report No. 50-29/85-23)
Areas Inspected: Routine, unannounced inspection of the licensee's radiation protection program includirig: ALARA implementation during the outage; control of work;-frisking; posting and control of high radiation exclusion areas; control of radioactive material; and the evaluation of a worker uptake. This inspection involved 74 inspector-hours onsite by two region-based inspector Results: No items of noncompliance were identifie as120ph [
O L l
~ '
, , , ,
L:
lE f... j
'
~?, :e 4 , +'
_
.
,
t Y
' -
DETAILS
..
~
~
1.0j: Persons Contacted
'
!Duringthecourseofthisroutineinkpection,thefollowingpersonnel
"were contacted or. interviewed:
'
1.'l-, Licensee Personnel-
,N.- St. Laurenti Plant Su'perintendent T. K. Henderson,-Technical Director B. L. Drawbridge,' Assistant: Plant Superintendent G. M..Babineau,. Radiation Protection _ Manager R.;Mellor,' Chemistry Manager e
. NRC Personnel
'
,
H. Eichenholz,; Senior Resident Inspector
- All personnel listed above attended -the exit interview on November 1,198 .
-
12.0 ^LPurpose c IThepurpo_se-ofthisroutineoutage.frspsetionwastoreviewthEIfcensee's-radiation protection program with . respect to the following. elements:
'
. ,
- - .ALARALImplementation:
. * .
. Radiation Work Permits-
- 7 -
se Frisking. . .
~*- ; Control of/High; Radiation Exclusion. Areas
. . .
-
.
"'
<
-* ;. -Control'of Radioactive Material p;f
.. .
- Evaluation of Worker llptake' of Radioactive Material
'
- '
,
.
.
?3.0EALARA Implementation
'
,
jThe'11censeei s' implementation-of.an ALARA program for the refueling outage
- .was-reviewed against criteria containcJ in:
V
- ' 10 CFR 20.1 Purpose . .
-*: . Regulatory. Guides:8.8 and'8.10
~
'
, .* - Procedure No. OP-8020,' "Alara Review Procedure," Revision 1
.
i a: . Draft; Procedure No.-0P-8020A,'" Implementation and Documentation of-
-ALARA: Job Reviews"
- <
4 The.-licensee's; performance relative to these criteria was determined from V- ; discussions with the Radiation Protection-Manager and ALARA coordinator, ,
f 1ALARA reviews, and'observationeof work in progress.
,
er 1
. . . . .
- p LWithin the. scope of thit review, no violations were identifie Licensee 4 strengths ~and weaknesses were noted as follows:
-
~
-
g >
-,
p r .
- ~ ' -
-
0+, ~~.,.-i . . . -
m -
,
s : -Z m ,
, .
- , ,
-The:ltcensee has drafted but has not fully implemented an improved ALARA procedure. The corporate HP_ group demonstrated good preplanning by
' publishing ALARA. reviews :of all :significant Engineering Design Change .
' Requests:. scheduled to be done this outage. Reactor. fuel integrity will be-
' checked with~ ultrasonics rather.than sipping which should result in dose
- '
- saving >
1The ALARA Coordinator position'_has been vacant for several months an'd was filled by a temporary subcontractor at the beginning of the outage. Ther o :has been no formal corporate'or station policy regarding an ALARA' progra .Althoughian annual-goal for personnel exposure: exists, there have been-no-exposure goals established.for the outage. .There is no system to track exposure associated with ~a specific work package. Implemen_tation of these _ ,
- ALARA program elements is unresolved and will be reviewed in a future
- inspection (85-23-01).
24.0 Radiation Work Permit's
. The licensee's program to control outage work and protect workers using a radiation work permit system was reviewed against criteria contained in:
Techdical-Specification 6.8, Procedures
'
-
'
+ , -
' Regulatory Guide 1.33.(November 1972), Appendix A, Section G.5,-
" Personnel-Monitoring and Special Work Permit" c
t-' 10 CFR 19.'12, Instruction.to workers
-
-
10 CFR _20, Standards for Protection Against Radiation
-
,
' --
. Procedure 0P-8415,. Radiation Work Permits
-
'
The': licensee's. performance relative to these' criteria was determined by a4 review.of the: issuance p~rocess for radiation work permits, interviews with-
. workers, . observation ,of work in . progress, and interviews ~ with HP 'techni-cians in-the work are _
..W ithin'the scope of this review, no violations were identifie Licensee
= strengths _and weaknesses were noted.as follows:
.
The licensee has iss'ued a " Radiological Work. Practices Policy Statement" -
to site personnel. ' This document emphasizes the need to follow RWP requiremerits as well as other work' practices. Also included is a four-r, . step disciplinary action policy that provides for worker.te'rmination fo failure to. comply _with radiation protection requirements. The inspector
-
noted that-this policy indicated-a strong and clear management support of
~_the RP requirement .
.
The inspector noted thatLthe current RWP procedure does not provide guidance for issuance of extremity monitoring. A review of completed
~
,
.
.-
,,,I 2- l 1
_
F4 ,
. . .
- .
?
.
n
The licensee's performance relative to these criteria was determined by:
Tours of the reactor containment, auxiliary building, and protected area
- - Observation of surface contamination surveys and decontamination activities
- - Discussions.with RP personnel
'* : Review of RWPs'and survey records During tours of the reactor containment and protected areas, radioactive components removed during the outage appeared to be adequately labeled-and stored in adequately controlled areas. The control and removal of radioactive waste was also adequately addressed by the license Removable surface contamination surveys were being performed once per shift in six plant areas including the VC charging floor. Recent survey maps were observed on.the radiological status board in the vicinity of the main control poin ~
-Observation and discussion with RP personnel indicated that step-off pads (SOPS) were used as single units and were to be treated as being contaminated. But licensee procedure OP-8100, titled Establishing and Posting:of Con. trol Areas, did not reflect this actual practice. In addition to. defining a contamination-controlled area, this procedure states that access controls,.similar to.those shown in figures in the
- procedure, are to be used. For moderately contaminated areas, one figure indicated that two contiguous SOPS (outer one clean /ianer one contamin-ated)'are to be placed at the access point. For highly contaminated areas, another> figure indicated that a clean S0P is to be placed at an outer access point,and that two contiguous SOPS (outer one pettatially contaminated / inner one contaninated) are to be placed at an inner access point. 'RP personnel stated that radiation worker training included-instruction and demonstration of access control using contaminated SOPS and that this practice was not causing any confusion. Differences between written procedures and actual plant practice is a problem which was identified in previous inspection The licensee has made a commit-ment to the NRC to review all RP procedures and to have procedures reflect practice. Continued allocation of significant resources to this review process were evident'during this inspectio Within the scope of this review, no violations were identifie .
l' . .
p -
-
- (* *i
. .
'9.0 Evaluation-of Worker Uptake of Radioactive Material The. licensee's methods _of-evaluating an uptake of airborne radioactive material by two worker's~on October ~22, 1985, was reviewed against criteria
~
. contained .in:
4 c- 10 CFR:20.103, Exposure of Individuals to Concentrations of Radio-active Materials in Air in Restricted Area :
_ Regulatory Guide 8.9, Acceptable Concepts, Models, Equations, 'and
.
Assumptions'for a Bioassay Progra Regulatory. Guide 8.26, Applications of Bioassay for Fission and Activation Product =IE Notice 82-18,- Assessment of Intakes of Radioactive Material by
-
worker The;1tcercee'sLperformance relative to these criteria was determined by
. discussions with the health physicist conducting the evaluation and a
. review of bioassay data, t
- The licensee's data indicates that two workers experienced uptakes of 42.8~MPC-hours and 26 MPC-hours of airborne radioactive dust. The elimin-ation of these uptakes was evaluated using urine and fecal analysis and
? .whole~ body' counting. The analytical methods were determined to be ade-squateland.no worker overexposure had occurre = 10.0 ExitvInterview-The inspector met with. licensee personnel-denoted in Section 1.1 at.th conclusion of the inspection _on November 1, 1985. The scope and findings ofo the . inspection were discussed at that time,
,
a
.t k-