Notice of Violation,App a for Insp on 970202-0317.Violation Noted:On 970226,scaffolds Installed in safety-related Areas, Including a & B RHR Pump Rooms & Standby Liquid Control Pump Room in Rb,Lacked Appropriate Construction Documentation
ML20137W770
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 04/14/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20137W767 List:
References
50-354-97-01, 50-354-97-1, NUDOCS 9704180207
Download: ML20137W770 (2)


Text

.

APPENDIX A NOTICE OF VIOLATION i

Public Service Electric and Gas Company Docket No: 50-354 Hope Creek Generating Station License No: NPF-57 l

During an NRC inspection conducted on February 2,1997 to March 17,1997, a violation of NRC requirements was identified. In accordance with the " General Statement of Policy ,

and Procedure for NRC Enforcement Actions," NUREG-1600, the violation is listed below:

l 10 CFR 50 Appendix B Criterion V requires in part that activities affecting quality shall be accomplished in accordance with established procedures. These

procedures shallinclude appropriate quantitative or qualitative acceptance criteria.

J PSE&G Nuclear Administrative Procedure NC.NA-AP.ZZ-0023 (Q), Revision 4,

" Scaffolding and Transient Loads Control," requires that scaffolding installed in the

. (Hope Creek) station be appropriately tracked in a control log, periodically inspected ,

l for compliance with construction criteria, and promptly removed after completion of l I

the work activity requiring the scaffolding. '

1 Contrary to the above, on February 26,1997, it was determined that several scaffolds installed in safety-related areas, including the "A" and "B" RHR pump i rooms and the standby liquid control pump room in the reactor building of the Hope Creek station lacked appropriate construction documentation, had insufficient  ;

periodic inspections, and were not removed within a timely manner following the l work activities that required the temporary structures.

l l This is a Severity Level IV Violation (Supplement 1).  !

l Pursuant to the provisions of 10 CFR 2.201, Pubic Service Electric and Gas Company is l hereby required to submit a written statement or explanation to the U.S. Nuclear  !

Regulatory Commission, ATTN
Document Control Desk, Washington, D.C. 20555 with a {

l copy to the Regional Administrator, Region I, and a copy to the NRC Resident inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a

" Reply to a Notice of Violation" and should include for each violation: (1) the reason for j

] the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Your  !

. response may reference or include previous docketed correspondence, if the correspondence adequately addresses the required response. If an adequate reply is not l j received within the time specified in this Notice, an order or a Demand for Information may

be issued as to why the license should not be modified, suspended, or revoked, or I

< \

l I

9704180207 970414 l

, PDR ADOCK 05000354 G PDR e

i

. 2 Because your response will be placed in the NRC Public Document Room (PDR), to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction, if personal privacy or proprietary information is necessary to provide an acceptable response, then please provide j a bracketed copy of your response that identifies the information that should be protected  ;

and a redacted copy of your response that deletes such information. If you request I withholding of such material, you must specifically identify the portions of your response l l that you seek to have withheld and provide in detail the bases for your claim of I withholding (e.g., explain why the disclosure of information will create an unwarranted invasion of personal privacy or provide the information required by 10 CFR 2.790(b) to i support a request for withholding confidential commercial or financial information). If safeguards information is necessary to provide an acceptable response, please provide the level of protection describeu in 10 CFR 73.21.

'I Dated at King of Prussia, Pennsylvania this 14th day of April 1997 1