ML20071H910

From kanterella
Revision as of 09:14, 23 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Interim Deficiency Rept Re Tech Spec 3.6.1.3 Concerning Operability of Containment Air Lock.Investigation Continuing.Complete Rept Will Be Provided by 830603
ML20071H910
Person / Time
Site: Mcguire
Issue date: 05/18/1983
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8305250525
Download: ML20071H910 (1)


Text

DuxE POWER GOMPAhT P.O. BOX 33180 CHARLOTTE. N.C. 28242 HAL H. TIJCKER reternoxz voce rewesmant (704) 373-4531

= ==. --mio. May 18, 1983 Mr. James P. O'Reilly, Regional Administrator U. S.-Nuclear Regulatory Commission Region II 101 Marietta Street NW, Suite 2000 Atlanta, Georgia 30303 Re: McGuire Nuclear Station, Unit 2 Docket No. 50-370

Dear Mr. O'Reilly:

Reportable Occurrence Report R0-370/83-08 was to have been submitted by May 18, 1983. This 30 day reportable occurrence (pursuant to T.S. 6.9.1.11) concerns T.S. 3.6.1.3, "Each containment air lock shall be operable...", which was violated on April 18, 1983. At this time, investigation of the incident and preparation of a report are not yet complete. The complete report will now be submitted by June 3, 1983.

Very truly yours, G 4 al B. Tucker PBN:jfw cc: Document Control Desk Records Center U. S. Nuclear Regulatory Commission Institute of Nuclear Power Operations Washington, D. C. 20555 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 Mr. W. T. Orders NRC Resident Inspector McGuire Nuclear Station i

I

!~ -

r l

8305250525 830518 * ~s gDRADOCK 05000370 QyBCIALCO$b l PDR 7~

....-