Proposed TS Section 3/4.7.1 Re Safety Valve Turbine Cycle
ML20116M509
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 11/13/1992
From:
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
Shared Package
ML20116M498 List:
References
NUDOCS 9211200303
Download: ML20116M509 (1)


Text

-

3/4.7 PLANT SYSTEN_5_

3/4.7.1 TURBINE CYCLE SAFETY VALVES LIMITlWi CON 0lTION FOR OPERAT!0H 3.7.1.1 All main steam line code safety valves associated with each steam generator shill be OPERABLE with lif t settings as specified in Table -h-7 -h J 1 - 2.

APPLICABILITY: H00E5 1, 2 and 3.

ACTIO,N,:

a. With 3 reactor coolant loops and associated steam generators in operation and with one or more main stears line code safety valves inoperable, operation in H0 DES 1, 2 and 3 may proceed provided, that within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, either the inoperable valve is restored to OPERABLE status or the Power Range Neutron Flux High Trip Setpoint is reduced per Table 3.7-1; otherwise, be in at least HOT STANOBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

' h (th 2 reactor coolant loops and associated steam generato.ti.l # ,4 cperntound with one or more main steam line coda-eafft'y valves associated wTira rating loop inopJrler,1@eration e , in H00E51, 2 and 3 may proceed prov t-wt' thin 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, either the inoper-able valve is restopa te1PERABL r the Power Range Neutron ,

Flux High Trip-htpoint is reduced per Ta otherwise, be in a tait'50T STANOBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and i SMulDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. N

% The prnvisions of Specificatior 3.0.4 are not applicable, b.

SURVEllLANCE REQUIREMENTS 4.7.1.1 No additional Surveillance Requirements other than those required by Specification 4.0.5.

Atc eai u;trp wut wn'i ' M b f fC" I 'f e f FCfm*'t) test M m e w*' t/7, a r cw tin fece.ips I' sow i.n cro ,w 1Anc J7-2.

SL M ER - UNIT 1 3/4 7-1 ,

9211200303 921113 PDR ADOCK 05000395 P PDR