ML20084M488

From kanterella
Revision as of 17:51, 13 May 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1983
ML20084M488
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/12/1983
From: Lease R, Might A, Will Smith, Suensson B, Svensson B
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
NUDOCS 8306020186
Download: ML20084M488 (8)


Text

  • .

e CPIR.CC DATA RI? ORT . .

DCC:C"' NO. 50-316 DATI 4-12-83 COM?L.~. IC I'f A. Miaht

-L.." :s.u.C.N:. 616 -4 6'. - 5 901 C???X'NG 5 ATUI Donald C. Cook 2 Nor:s . ,

I. Uc.: N.. s .. ... - -

-. R*. of".

..,.. .3.. :o C 11 arch 1983 r

3411 *

3. LI::= sed Th---' Pewer (MW:): '
4. N =e:I:i ?.2:in;(Cro:s Mwe): 1133 -
5. Desi;= I :=i=1 R.::ia:(Nec 51We): 1100 .
6. St- : :::= Depe .d.:ble C:p::i:7 (Gross MWe): IIl8 1082 T. Maxi === De-- d-N: C:::.M (Ne MWe): .

. S. If Ch:=;es 0 =:in C:p::i:y R::i=;s (1:=s Nc=her 3 Throu;.h 7) SI :: L:s: Report. Give R: sons:

9. Power Leve! To Which R=:= iced.!! Any (N : Mwe):
10. Resons For R..=i:: ices.If A=y: .

T..isMor.th Y:.-to-Ca:. . Cu==I::ive

11. Hours != Reper.ia; ?:: icd 744 2160 45.984
12. Numb : Cf Hou:s R==::t W2. s C:i:i- ! 744 1682.5 32.495.9 0 0 0
13. Re:c:: R :::ve Sh :down Ecus
14. Ho== Ce===:ce Cn-Line 744- 1602.8 31.564.5 0 0 0
15. Uni: R: serve Sh=:down Ec.:=

2.533,602 5,117,364 101,381.595

16. Cross Th==:1 I:::;y C4===:ed (MwH)
17. Cross Ee =i=1I=...;7 Gent =: d ptwH) 839,930 , , ,

1.687,980 32.645.730

13. Ne: E::=.=! In: ;y Genen::d (.'.;W~c:) 812.309 _ .628.920 1 31,468.712 l 19. Uni: Se:rie .::::=r .

100 74.2 73.1 100~ 74.2 73.1 l 20. Uci: Ar-II:bi!!:7 ::::or I. Uni: C::::i:/ 7::: r (Usi=; .'.!DC Ser) - 100.9 69.7 68.7

22. Uni: C:c=ci:y .::::or (Usin; DIF. Neti 99.3 68.6 67.8
23. Uni: . or: d C:::;e R::, 0 1.6 13.4
24. Shutdows Scheduled Over Nec 5 Stcaths (Type. 0:te.: d Ou=:ica of I::h1: .

1 r

~5. If Shu: Down A: Ind Cf Report ?:riod. Estim::ed D::e of 5::: up:

. 5. Units !a Tes: 5:::us IPnor o C ====i:10; =:ical: Fore =st Acnie ed INIT.A L C7.IT*CA LITY ' ~

INITIAL I .I:~R:C;W

. . . _ ,- . . . s. .o ;-

C O..........s. ...A m. m.

pp i 8306020186 830412 PDR ADOCK 05000316 R PDR

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-316 UNIT 2 DATE 4-5-83 COMPLETED BY A. Hight TELEPHONE 616-465-5901-MONTH March, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-Net) (MWe-Net) 1 1092 17 1093 2 1092 18 1096 3 1082 19 1080 4 1087 20 1093 5 1085 21 1097 6 1091 22 1095 7 1090 1091 23 8 1092 24 1095

^

9 1095 1089 25 10 1094 25 1074 11 1091 27 1099 12 1085 28 1104

{

l 13 1c92 1

29 1102 l

14 1092 30 1099 15 1086

1 1105 16 1086 INSTRUCTIONS On this forn.at list the average daily unit power level in MWe-Net for each day in the reporting month. Ccmoute to the nearest whole megawatt.

I IlNil'SiltilDOWNS AND POWER ltElitlCTIONS I4 ~ Ah (( ook - Unit 2-DATE -83 COhlPI E IED liY B.A. Svensson Hi Polt I klON ill March, 1983 -

g,gy, o g 616/465-5901 i

SHEET 1 of 1

- c c

.5 ii 3 3 EE I icensce E ' 8., L Canse A Concosive No D ale R i' @ s .2 s $ livens Fy $"E e- Atuon so F yE $ 3yg e

itepos # Ja' O EO o

l'sevent itecausence c

O There were no Unit shucdowns or sig-nificant power reductions during the month. The Unit operated at a ca-pacity factor of 100.9% (Using MDC Net).

I 2 3 .I 1 ; l'euccil iteamn: kleilio.1: lixintne G . Instenilsons S: S licilnicil A l ainspaner.: 1.ntine (l;nplais:) 1 -hlannat f.is Picp.nanon of D.isa 11 hl.ainten.suce or Test 2 klannat Scsani. '..nisy St eens l'o I.iicusee C Itefncling .l Antoni.itic & s.un. I:. vent Itepose il l'It) I: ale Niitti G.

In Hegulainiy itesissi.ison -l Oilies flixplani) Olvil )

l' Opesaios Isaining & Iitenw I namin.asion it Ailinumisalive s G Opes.asional 1 stos (lixpl.inen talnhai ! S ame Sonoce P8///) ll Ollies (lixpl.nn)

(- .

Docket No.:

. 50-316 Unit Name: D. C. Cook Unit 2

. Completed By: R. S. Lease Telephone: (616) 465-5901 Date: 4/8/83 Fage: 1 of 2 MONTHLY OPERATING ACTIVITIES - MARCH 1983 Highlights:

The Unit entered the reporting period operating at 100% power and remained in service for the entire period. There were seven minor load reductions, but none of them to less than 95% power.

Total electrical generation was 839,930 MWH.

Summary:

3/2/83 Engineered Safety Feature Fan 2-HV-AES-2 was inoperable for a 44-1/3 hour period starting at 1647 hours0.0191 days <br />0.458 hours <br />0.00272 weeks <br />6.266835e-4 months <br /> to replace the drive motor due to a failed motor bearing.

3/3/83 Unit power reduction was initiated at 1805 hours0.0209 days <br />0.501 hours <br />0.00298 weeks <br />6.868025e-4 months <br /> due to a "Hi Coil Temperature" alarm on Phase 3 of the Main Transformer.

Unit power was held at 98 % while the alarm was checked for validity. It was determined that the alarm setpoint had drifteri.

The setpoint was adjusted and the Unit returned to 100% power.

Total time below 100% was 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.

3/4/83 Turbine Stop Valve "A", Train "A", valve closed indicating-switch to the Reactor Protection System was replaced during a 3-2/3 hour period. The Protection Channel was in trip during the switch replacement.

3/5/83 Unit power was reduced to 95% for testing of turbine valves.

Total time below 100% was 3-3/4 hours.

3/11/83 The Unit 2 Diesel Fire Pump was inoperable for a 7h hour period to replace a broken bolt on the Generator.

! Unit power was reduced to 95% for testing of turbine valves.

-l Total time below 100% was 5-3/4 hours.

3/17/83 The Detector Tube of Radiation Monitor R-25 failed at 1505 hours0.0174 days <br />0.418 hours <br />0.00249 weeks <br />5.726525e-4 months <br />.

The Tube was renewed and the monitor returned to service at 0907 hours0.0105 days <br />0.252 hours <br />0.0015 weeks <br />3.451135e-4 months <br /> March 24, 1983.

3/19/83 Unit power was reduced -to 95% for testing of turbine valves.

Total time below 100% was 4h hours.

Later this same day Unit power was again reduced to 95% for replacement and testing of one of the closed indicating switchs of Turbine Stop Valve "C" that had malfunctioned during the previous valve test. Total time below 100% was 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

, Docket No.: 50-316 Unit Name: D. C. Cook Unit 2 Completed By: R.'S. Lease

. . Telephone: -(616):465-5901 Date: 4/8/83 Page: 2 of 2 3/25/83 Unit power was reduced to 95% for testing of. turbine valves.

Total time below 100% was 4-3/4 hours. During this valve testing the Reheater Coils automatically valved out of service when Drain Valve MRV-421 failed closed.

3/26/83 After repair to valve MRV-421 Unit power was reduced to 95%

to return the Reheater Coils to service. Total time below 100% was 5k hours.

Main Condenser Halfs were out of service,' one half at a time, for a total of 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> during the reporting period for identification and repair of circulating water leaks.

1 i

l t

l L

l i

t l

i l

1

d DOCKET NO. 50 - 316

, UNIT NAME D. C. Cook - Unit No. 2 DATE 4-12-83 COMPLETED BY B. A. Svensson TELEPHONE (616) 465-5901 PAGE 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE MARCH, 1983 M-1 The control cable to IMO-256, boron injection tank inlet valve, was found to have damaged insulation. Replaced the cable.

M-2 Engineered safety features ventilation fan, HV-AES-2, was re-moved from service due to failure of the inboard motor bearing, causing the motor to overheat. The motor was replaced and the unit tested.

M-3 No. 4 boric acid transfer pump was leaking from pump flanges and seal water lines. Replaced the pump.

C&I-l Surveillance testing of reactor logic trains A and B revealed a problem with train B "High Rate Flux Trip", position 13 on switch D. The problem was localized in universal circuit card A212. After replacing the defective card, surveillance test STP.145 was satisfactorily completed on the solid state pro-tection system train B.

C&I-2 The containment fire detection system 12-volt power supply was repaired by the installation of a new transformer. The system was tested for proper operation.

C&I-3 Main steam power operated relief valve, MRV-243, had control air leaks at the valve. positioner and at the booster relays.

Both positioner and boosters were disassembled, repaired, and reinstalled. The positioner was' adjusted for proper valve operation.

I i

1

/ i l

1 I

mwm

~~~L IN0 LANA & MICHIGAN ELECTRIC COMPANY ,

DONALD C. COOK NUCLEAR PLAh"r l P.O. Box 458 Bddenan,;Mkhigan 49106 (616) 465-5901 l

April 12, 1983 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 i Technical Specification 6.9.1.6, the attached Monthly Operating Report for the Month of March, 1983 is submitted.

Sincerely, L-d - DN' W. G. Smith, Jr.

Plant Manager WGS:ab Attachments cc: R. S. Hunter J. E. Dolan M. P. Alexich R. W. Jurgensen NRC Region III E. n. Swanson l R. O. Bruggee (NSAC)

R. C. Callen S. J. Mierzwa R. F. Kroeger H. L. Sobel J. D. Huebner J. M. Hennigan A. F. Kozlowski R. F. Hering J. F. Stietzel PNSRC File

'fl