MONTHYEARL-99-033, Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions1999-10-0404 October 1999 Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions ML20212C5831999-09-15015 September 1999 Application for Amends to Licenses NPF-2 & NPF-8,committing Util to Transfer Certain CTS Requirements Into Util Controlled Documents & Specifying Schedule for Performing New & Revised ITS Surveillances.Revised License Pages,Encl ML20210R5181999-08-12012 August 1999 Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16,based on risk-informed Approach for Evaluation of SG Tube Structural Integrity.Marked Page of Current License,Included L-99-018, Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity1999-04-30030 April 1999 Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity L-99-013, Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl1999-04-0202 April 1999 Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl ML20155J4391998-11-0606 November 1998 Application for Amends to Licenses NPF-2 & NPF-8,requesting Change to TS Nuclear Instrumentation Sys Power Range Daily Surveillance Requirement ML20154K2451998-10-12012 October 1998 Application for Amends to Licenses NPF-2 & NPF-8,revising Section 6 of TS by Recognizing Addl Mgt Positions Associated with SG Replacement Project & Providing Ability to Approve Procedures Re Project Which May Affect Nuclear Safety ML20216F7051998-03-12012 March 1998 Application for Amends to Licenses NPF-2 & NPF-8 to Revise Existing TS in Entirety.Amend Consists Primarily of Conversion of Current TS to Improved Ts,Per NUREG-1431,rev 1.Vols 1-10 Contain Listed Attachments ML20198H3561998-01-0707 January 1998 Application for Amends to Licenses NPF-2 & NPF-8,adding Note to TS to Specifically Indicate Normal or Emergency Power Supply May Be Inoperable in Modes 5 or 6 Provided That Requirements of TS 3.8.1.2 Are Satisified ML20198E6531997-12-31031 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Nis IR Neutron Flux Reactor Trip Setpoint & Allowable Value to Be Consistent W/W Std TS,NUREG-1431,Rev 1.Proprietary Safety Analysis,Encl.Proprietary Info Withheld ML20198E2891997-12-30030 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Requirements for Auxiliary Bldg & Svc Water Bldg Batteries, Per NRC Staff Concerns as Described in URI 50-348/97-201 & 50-364/97-201 & NOV 50-348/97-11 & 50-364/97-11 ML20211P5811997-10-16016 October 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Number of Allowable Charging Pumps Capable of Injecting in RCS When Temperature of One or More of RCS Cold Leg Temperatures Is Less than 180 F ML20211A6811997-09-17017 September 1997 Application for Amends to Licenses NPF-2 & NPF-8,amending Primary Coolant Specific Activity,Per GL 95-05 ML20216C9231997-09-0303 September 1997 Application for Amend to License NPF-2,allowing Reduction in Available Paths to Min of 50% w/3 Per Core Quadrant. Non-proprietary & Proprietary W Repts CAA-97-234 & CAA-97-235,encl.Proprietary Info,Withheld ML20149K0971997-07-23023 July 1997 Application for Amends to Licenses NPF-2 & NPF-8,relocating RCS P/T Limits from TS to Proposed PT Limits Rept IAW Guidance Provided by GL 96-03, Relocation of P/T Limit Curves & LTOP Protection Sys Limits ML20148R7351997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating Requirements Necessary to Change Basis for Prevention of Criticality in Fuel Storage Pool.Change Eliminates Credit for Boraflex as Neutron Absorbing Matl ML20148Q0981997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising & Clarifying Requirements for CR Emergency & Penetration Room Filtration Sys & Related Storage Pool Ventilation Sys & Revises Radiation Monitoring Instrumentation Channels ML20148K7421997-06-13013 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,proposing Changes Found in Tech Specs 3/4.9.13, Storage Pool Ventilation (Fuel Movement) ML20140A3861997-05-28028 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,clarifying That Testing of Each Shared EDG to Comply W/Sr 4.8.1.1.2.e Is Only Required Once Per Five Years on a Per EDG Basis,Not on Per Unit Basis ML20148E5851997-05-27027 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Applicable Modes for Source Range Nuclear Instrumentation & Providing Allowances for an Exception to Requirements for State of Power Supplies for RHR Discharge to Pump Valves ML20138B9161997-04-23023 April 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Proposed TS Pages to Include Footnote Concerning Filter Pressure Drop Testing & Mechanical Heater Testing ML20137H6011997-03-25025 March 1997 Application for Amend to License NPF-2,requesting Implementation of voltage-based Alternate Repair Criteria, Per GL 95-05 ML20136F8141997-03-0707 March 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising TS 3/4.6.3 Re Containment Isolation Valves Surveillance Requirements ML20135C6511997-02-24024 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,requesting Revision & Clarification to Surveillance Requirements for Control Room Emergency Filtration Sys,Penetration Room Filtration Sys & Containment Purge Exhaust Filter ML20135C8311997-02-14014 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Specified Max Power Level & Definition of Rated Thermal Power ML20138G9451996-12-26026 December 1996 Application for Amends to Licenses NPF-2 & NPF-8,reflecting Guidance in GL 95-05, SG Tube Support Plate Voltage-Based Repair..., to Use Revised Accident Leakage Limit of 20 Gpm & Include 50% of Rpc Ndds in Calculation.W/O Unit 2 TSs ML20134K5501996-11-15015 November 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting Deletion of TS 3.6.2.2 Re Containment Spray Additive Sys ML20128F8681996-09-30030 September 1996 Application for Amends to Licenses NPF-2 & NPF-8,relocating cycle-specific Core Operating Parameter Limits to Colr. Proposed Changes Based on Guidance Found in NRC GL 88-16, WOG-90-016,NUREG-1431 & VEGP COLR Approved by NRC ML20117G2911996-08-30030 August 1996 Application for Amend to License NPF-8,requesting Deletion of References to Cycle Specific L* Criteria ML20117D2201996-08-23023 August 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting to Allow Use of Elevated Sleeve ML20113B6931996-06-24024 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,deleting Requirement for Surveillance of Manual SI Input to Reactor Trip Circuitry Until Next Unit Shutdown ML20113A7991996-06-20020 June 1996 Application to Revise Ts,Reflecting Implementation of 10CFR50,App J,Option B & Represent Crossed Beneficial Licensee Actions ML20112G9711996-06-12012 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,providing Improved Operating Margins as Well as Increased Flexibility W/Respect to Core Designs & Plant Operating Strategy. Rev 2 to NSD-NT-OPL-96-152 Withheld ML20107J9551996-04-23023 April 1996 Application for Amend to License NPF-8,requesting Unit 2 Cycle 11 TS Change for SG Tubes Remaining in Svc ML20107J1521996-04-22022 April 1996 Application for Amend to License NPF-8,reflecting Implementation of New F* Criteria Based on Maintaining Existing Safety Margins for SG Tube Structural Integrity Concurrent W/Allowance for NDE Eddy Current Uncertainty ML20101L9041996-03-29029 March 1996 Application for Amend to License NPF-8,revising TS 3/4.4.6, Steam Generators & Associated Bases,Reflecting Guidance in GL 95-05.Responses to GL & Revised TS Encl ML20095L0161995-12-19019 December 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising Tech Specs Section 3/.7.7 Re Control Room Emergency Ventilation Sys ML20098B0911995-09-26026 September 1995 Application for Amends to Licenses NPF-2 & NPF-8,changing TS 4.6.1.3 to Incorporate Improvements to Containment Air Lock Testing Ref in Chapter 3.6,containment Sys of NUREG-1431, Sts,Westinghouse Plants ML20092F3821995-09-15015 September 1995 Application for Amend to License NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements ML20084P4901995-05-31031 May 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Associated W/Steam Generator Tube Support Plate voltage- Based Repair Criteria ML20080R8201995-03-0606 March 1995 Application for Amends to Licenses NPF-2 & NPF-8,relocating Seismic & Meteorological Monitoring Instrumentation TSs to FSAR ML20078P8331995-02-14014 February 1995 Application for Amend to Licenses NPF-2 & NPF-8 Re Permanent voltage-based Repair Criteria for Outside Diameter Stress Corrosion Cracking at SG Tube Support Plates for Both Units at Plant ML20077R4071995-01-0909 January 1995 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating line-item TS Improvements to Reduce Surveillance Requirements for Testing During Power Operation in Response to GL 93-05 ML20078S7531994-12-19019 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Pages for Mssv,Per NRC Information Notice 94-060, Potential Overpressurization of Main Steam Sys ML20077E3461994-12-0707 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS to Reflect Guidance in Draft GL 94-XX, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking ML20078B5451994-10-20020 October 1994 Application for Amends to Licenses NPF-2 & NPF-8,proposing TS 3/4.3.3.6 & Associated Bases,Which Will Delete Requirements for Chlorine Detection Sys from Units 1 & 2 TS ML20072F3401994-08-17017 August 1994 Application for Amends to Licenses NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements. Rev 1 to WCAP-13787 & Proprietary Rev 1 to WCAP-13632, Elimination of Pressure... encl.WCAP-13632,Rev 1 Withheld ML20070A1001994-06-17017 June 1994 Application for Amend to License NPF-2,revising TS 3/4.2.3 to Increase Nuclear Enthalpy Rise Hot Channel Factor Limit from 1.65 to 1.70 for Vantage 5 Fuel,In Order to Provide Greater Flexibility in Farley Unit 1 Core Design ML20069K2781994-06-10010 June 1994 Application for Amends to Licenses NPF-2 & NPF-8,changing RTS & ESFAS Setpoints Associated W/Sg Water Level. Westinghouse Nonproprietary & Proprietary Version of Rept, SG Lower Level Tap... Encl.Proprietary Rept Withheld ML20064C2111994-02-23023 February 1994 Application for Amend to License NPF-2,revising TS, to Allow Implementation of 2 Volt Interim Plugging Criteria 1999-09-15
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARL-99-033, Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions1999-10-0404 October 1999 Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions ML20212C5831999-09-15015 September 1999 Application for Amends to Licenses NPF-2 & NPF-8,committing Util to Transfer Certain CTS Requirements Into Util Controlled Documents & Specifying Schedule for Performing New & Revised ITS Surveillances.Revised License Pages,Encl ML20210R5181999-08-12012 August 1999 Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16,based on risk-informed Approach for Evaluation of SG Tube Structural Integrity.Marked Page of Current License,Included L-99-018, Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity1999-04-30030 April 1999 Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity L-99-013, Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl1999-04-0202 April 1999 Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl ML20155J4391998-11-0606 November 1998 Application for Amends to Licenses NPF-2 & NPF-8,requesting Change to TS Nuclear Instrumentation Sys Power Range Daily Surveillance Requirement ML20154K2451998-10-12012 October 1998 Application for Amends to Licenses NPF-2 & NPF-8,revising Section 6 of TS by Recognizing Addl Mgt Positions Associated with SG Replacement Project & Providing Ability to Approve Procedures Re Project Which May Affect Nuclear Safety ML20216F7051998-03-12012 March 1998 Application for Amends to Licenses NPF-2 & NPF-8 to Revise Existing TS in Entirety.Amend Consists Primarily of Conversion of Current TS to Improved Ts,Per NUREG-1431,rev 1.Vols 1-10 Contain Listed Attachments ML20198H3561998-01-0707 January 1998 Application for Amends to Licenses NPF-2 & NPF-8,adding Note to TS to Specifically Indicate Normal or Emergency Power Supply May Be Inoperable in Modes 5 or 6 Provided That Requirements of TS 3.8.1.2 Are Satisified ML20198E6531997-12-31031 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Nis IR Neutron Flux Reactor Trip Setpoint & Allowable Value to Be Consistent W/W Std TS,NUREG-1431,Rev 1.Proprietary Safety Analysis,Encl.Proprietary Info Withheld ML20198E2891997-12-30030 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Requirements for Auxiliary Bldg & Svc Water Bldg Batteries, Per NRC Staff Concerns as Described in URI 50-348/97-201 & 50-364/97-201 & NOV 50-348/97-11 & 50-364/97-11 ML20198R5181997-10-29029 October 1997 Amends 132 & 124 to Licenses NPF-02 & NPF-08,respectively, Changing TS 3/4.4.9, Specific Activity & Associated Bases to Reduce Limit Associated W/Dose Equivalent iodine-131 ML20211P5811997-10-16016 October 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Number of Allowable Charging Pumps Capable of Injecting in RCS When Temperature of One or More of RCS Cold Leg Temperatures Is Less than 180 F ML20211A6811997-09-17017 September 1997 Application for Amends to Licenses NPF-2 & NPF-8,amending Primary Coolant Specific Activity,Per GL 95-05 ML20216C9231997-09-0303 September 1997 Application for Amend to License NPF-2,allowing Reduction in Available Paths to Min of 50% w/3 Per Core Quadrant. Non-proprietary & Proprietary W Repts CAA-97-234 & CAA-97-235,encl.Proprietary Info,Withheld ML20149K0971997-07-23023 July 1997 Application for Amends to Licenses NPF-2 & NPF-8,relocating RCS P/T Limits from TS to Proposed PT Limits Rept IAW Guidance Provided by GL 96-03, Relocation of P/T Limit Curves & LTOP Protection Sys Limits ML20148R7351997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating Requirements Necessary to Change Basis for Prevention of Criticality in Fuel Storage Pool.Change Eliminates Credit for Boraflex as Neutron Absorbing Matl ML20148Q0981997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising & Clarifying Requirements for CR Emergency & Penetration Room Filtration Sys & Related Storage Pool Ventilation Sys & Revises Radiation Monitoring Instrumentation Channels ML20148K7421997-06-13013 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,proposing Changes Found in Tech Specs 3/4.9.13, Storage Pool Ventilation (Fuel Movement) ML20140A3861997-05-28028 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,clarifying That Testing of Each Shared EDG to Comply W/Sr 4.8.1.1.2.e Is Only Required Once Per Five Years on a Per EDG Basis,Not on Per Unit Basis ML20148E5851997-05-27027 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Applicable Modes for Source Range Nuclear Instrumentation & Providing Allowances for an Exception to Requirements for State of Power Supplies for RHR Discharge to Pump Valves ML20138B9161997-04-23023 April 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Proposed TS Pages to Include Footnote Concerning Filter Pressure Drop Testing & Mechanical Heater Testing ML20137H6011997-03-25025 March 1997 Application for Amend to License NPF-2,requesting Implementation of voltage-based Alternate Repair Criteria, Per GL 95-05 ML20137E2891997-03-24024 March 1997 Amends 125 & 119 to Licenses NPF-2 & NPF-8,respectively, Revising TS to Incorporate Latest Revised Topical Repts Governing Installation of Laser Welded SG Tube Sleeves ML20136F8141997-03-0707 March 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising TS 3/4.6.3 Re Containment Isolation Valves Surveillance Requirements ML20135C6511997-02-24024 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,requesting Revision & Clarification to Surveillance Requirements for Control Room Emergency Filtration Sys,Penetration Room Filtration Sys & Containment Purge Exhaust Filter ML20135C8311997-02-14014 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Specified Max Power Level & Definition of Rated Thermal Power ML20138G9451996-12-26026 December 1996 Application for Amends to Licenses NPF-2 & NPF-8,reflecting Guidance in GL 95-05, SG Tube Support Plate Voltage-Based Repair..., to Use Revised Accident Leakage Limit of 20 Gpm & Include 50% of Rpc Ndds in Calculation.W/O Unit 2 TSs ML20134K5501996-11-15015 November 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting Deletion of TS 3.6.2.2 Re Containment Spray Additive Sys ML20128F8681996-09-30030 September 1996 Application for Amends to Licenses NPF-2 & NPF-8,relocating cycle-specific Core Operating Parameter Limits to Colr. Proposed Changes Based on Guidance Found in NRC GL 88-16, WOG-90-016,NUREG-1431 & VEGP COLR Approved by NRC ML20117G2911996-08-30030 August 1996 Application for Amend to License NPF-8,requesting Deletion of References to Cycle Specific L* Criteria ML20117D2201996-08-23023 August 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting to Allow Use of Elevated Sleeve ML20113B6931996-06-24024 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,deleting Requirement for Surveillance of Manual SI Input to Reactor Trip Circuitry Until Next Unit Shutdown ML20113A7991996-06-20020 June 1996 Application to Revise Ts,Reflecting Implementation of 10CFR50,App J,Option B & Represent Crossed Beneficial Licensee Actions ML20112G9711996-06-12012 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,providing Improved Operating Margins as Well as Increased Flexibility W/Respect to Core Designs & Plant Operating Strategy. Rev 2 to NSD-NT-OPL-96-152 Withheld ML20107J9551996-04-23023 April 1996 Application for Amend to License NPF-8,requesting Unit 2 Cycle 11 TS Change for SG Tubes Remaining in Svc ML20107J1521996-04-22022 April 1996 Application for Amend to License NPF-8,reflecting Implementation of New F* Criteria Based on Maintaining Existing Safety Margins for SG Tube Structural Integrity Concurrent W/Allowance for NDE Eddy Current Uncertainty ML20101L9041996-03-29029 March 1996 Application for Amend to License NPF-8,revising TS 3/4.4.6, Steam Generators & Associated Bases,Reflecting Guidance in GL 95-05.Responses to GL & Revised TS Encl ML20095L0161995-12-19019 December 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising Tech Specs Section 3/.7.7 Re Control Room Emergency Ventilation Sys ML20098B0911995-09-26026 September 1995 Application for Amends to Licenses NPF-2 & NPF-8,changing TS 4.6.1.3 to Incorporate Improvements to Containment Air Lock Testing Ref in Chapter 3.6,containment Sys of NUREG-1431, Sts,Westinghouse Plants ML20092F3821995-09-15015 September 1995 Application for Amend to License NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements ML20084P4901995-05-31031 May 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Associated W/Steam Generator Tube Support Plate voltage- Based Repair Criteria ML20080R8201995-03-0606 March 1995 Application for Amends to Licenses NPF-2 & NPF-8,relocating Seismic & Meteorological Monitoring Instrumentation TSs to FSAR ML20078P8331995-02-14014 February 1995 Application for Amend to Licenses NPF-2 & NPF-8 Re Permanent voltage-based Repair Criteria for Outside Diameter Stress Corrosion Cracking at SG Tube Support Plates for Both Units at Plant ML20077R4071995-01-0909 January 1995 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating line-item TS Improvements to Reduce Surveillance Requirements for Testing During Power Operation in Response to GL 93-05 ML20078S7531994-12-19019 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Pages for Mssv,Per NRC Information Notice 94-060, Potential Overpressurization of Main Steam Sys ML20077E3461994-12-0707 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS to Reflect Guidance in Draft GL 94-XX, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking ML20078B5451994-10-20020 October 1994 Application for Amends to Licenses NPF-2 & NPF-8,proposing TS 3/4.3.3.6 & Associated Bases,Which Will Delete Requirements for Chlorine Detection Sys from Units 1 & 2 TS ML20072F3401994-08-17017 August 1994 Application for Amends to Licenses NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements. Rev 1 to WCAP-13787 & Proprietary Rev 1 to WCAP-13632, Elimination of Pressure... encl.WCAP-13632,Rev 1 Withheld ML20070A1001994-06-17017 June 1994 Application for Amend to License NPF-2,revising TS 3/4.2.3 to Increase Nuclear Enthalpy Rise Hot Channel Factor Limit from 1.65 to 1.70 for Vantage 5 Fuel,In Order to Provide Greater Flexibility in Farley Unit 1 Core Design 1999-09-15
[Table view] |
Text
~- . .- .- .. . ~ - - ~-. . . . - ..
W '* i Soutnern Nuclxr Operating Comp:ny !
' J'- Pos! Offico Box 1295
. .. Birmingham Alabima 35201
' Telephone (205) 868 5131 o... uo,.y Southern Nudear Operating Company
~ Vice President Farley Project April 23, 1996 the southem electnc system
. Docket No.:' 50-364
. U. S. Nuclear Regulatory Commission i - ATTN.: Document Control Desk Washington, D. C. 20555 2-Joseph M. Farley Nuclear Plant - Unit 2 L* Tubesheet Region Cycle 11 Specific Plunning Criterion Ladies and Gentlemen:
l On April 22, 1996, Southern Nuclear (SNC) submitted a Unit 2 Technical Specification j change concerning L* Tubesheet Region Plugging Criterion. On April 22,1996, SNC l requested and NRC Staff approved Enforcement Discretion for Farley Unit 2. The basis for l this Enforcement Discretion is described in SNC letter to the 'NRC dated April 23,1996 which described the Unit 2 cycle 11 specific L* criteria. l Enclosed is SNC's request for a Unit 2 Cycle 11 only Technical Specification change for Steam Generator Tubes remaining in service that meet the L* criteria described in the SNC
} April 23,1996 Enforcement Discretion letter. ;
E It is requested that the NRC approve the Unit 2 Cycle 11 specific L* Technical Specification change. Attachment I contains a Significant Hazards Consideration analysis. SNC has determined that the proposed license amendment will not significantly affect the quality of the human environment. Attachment 2 provides page change instructions and revised technical specification pages and bases. Attachment 3 provides corresponding marked-up existing l technical specification pages and bases pages. !
, A copy of the proposed changes is being sent to Dr. D. E. Williamson, the Alabama State l
- Designee, in accordance with 10 CFR 50.91(b)(1).
4 If there are any questions, please advise.
l 9604200330 960423 Respectfully submitted, PDR ADOCK 05000364 P
, PDR gg j Dave Morey Sworn to amisubscribed before me thgidayof A k ,1996.
yyaave . aA a5b" V
]
0 0\
Notar}Public My Commission Expires: YO?>12e y e /,, /9W \\
- s. ::
U. S. Nuclear Regulatory Commission . Page 2 Attachments:
- 1. Significant Hazards Evaluation
- 2. Technical Specification Pages
- 3. Marked Up Proposed Technical Specification Pages cc: Mr. S. D. Ebneter, Region II Administrator Mr. B. L. Siegel, NRR Senior Project Manager Mr. T. M. Ross, FNP Sr. Resident Inspector Dr. Donald E. Williamson, State Department of Public Health -
4 t
2 i
. s r 4
4 4
Attachment 1 4
Sinnificant Hazards Evaluation p
h
~
CYCLE 11 La TUBESHEET REGION PLUGGING CRITERION FARLEY NUCLEAR PLANT UNIT 2
. SIGNIFICANT HAZARDS CONSIDERATION ANALYSIS INTRODUCTION As required by 10 CFR 50.91(a)(1) this analysis is provided to demonstrate that a proposed license amendment for the J. M. Farley Nuclear Plant Unit 2 steam generators involves no significant hazard consideration. In accordance with the three factor test of 10 CFR 50.92(c),
implementation of the proposed license amendment (Technical Specification Change) was analyzed using the following standards and found not to: 1) involve a significant increase in the probability or consequences of an accident previously evaluated; or 2) create the possibility of a new or different kind of accident from any accident previously evaluated; or,3) involve a ,
significant reduction in a margin of safety.
Operation with 6 or more tubes that fail to meet the F* technical specification but meet the criteria for L' as described below is acceptable. The basis for this is provided in SNC submittal " Joseph M. Farley Nuclear Plant Unit 2 L* Tubesheet Region Plugging Criterion" dated April 22,1996. All structural integrity and leakage requirements of draft Reg. Guide 1.121 continue to be met for the tubes in question. The " Joseph M. Farley Nuclear Plant Unit 2 L* Tubesheet Region Plugging Criterion" technical specification submittal dated April 22, 1996 supports our safety basis for continued operation. It should be noted that the values of L* criterion in the " Joseph M. Farley Nuclear Plant Unit 2 L* Tubesheet Region Plugging Criterion" dated April 22,1996, bound the values of the Unit 2 cycle 11 specific L* criterion associated with this submittal. This submittal is intended to support a cycle specific one time ,
technical specification change using the measured L* criterion presented below. i 1
Unit 2 Cycle 11 Specific L* Criterion I Parameter Measured L* Base L* critericin criterion for Cycle 11 Minimum distance of SRE 2.07 inches 1.84 inches Maximum number of distinct degradation areas in a band 5 15 Maximum inclination angle within a single band 15 degrees 30 degrees l Maximum crack length .39 inches .5 inches Minimum distance of SRE from the bottom of the transition 1.45 inches .56 inches roll to the top of the indication l
Provided below is a excerpt from the " Joseph M. Farley Nuclear Plant Unit 2 L* Tubesheet l Region Plugging Criterion" technical specification submittal dated April 22,1996 to support our safety basis for this technical specification change. This execrpt combined with the margins noted above from the base L* c:iterica form the basis for this significant hazards evaluation.
l
.j_ ,
. BEGIN EXCERPT
~
. DESCRIPTION OF THE AMENDMENT REQUEST
~
The L* criterion assesses indications of degradation within the roll expanded region of steam generator tubes based upon location of the indication, the axial length of the indication and the inclination angle of the indications. The tubes to which the criteria are applied must meet the following restrictions:
i e Each tube must be inspected using the RPC probe or other advanced NDE inspection method for a minimum distance of 3.1 inches below the bottom of the roll transition or the . ;
top of the tubesheet, whichever is lower. This is termed the inspection region.
- - A minimum length of sound roll expansion of 0.50 inch plus allowance for eddy current
! measurement uncertainty extending down from the bottom of the roll expansion or the top
- of the tubesheet, whichever is lower, must be established. This is termed L* length.
!
- For tubes where a single degradation band is evidenced within the inspection region, an aggregate distance of sound roll expansion of 1,74 inch minimum plus allowance for eddy current measurement uncertainty, must be established. This aggregate distance includes i
the L* length. Single band degradation is limited to 0.50 inch axial length, with an inclination angle of not more than 30 degrees from the vertical, and limited to 15 distinct l degradation areas within the band. SNC has administratively limited the number of distinct degradation areas in the band to 15, although the Westinghouse support documentation justifies up to 30 such areas.
. For tubes where multiple degradation bands (maximum of two) are detected within the inspection region, an aggregate distance of sound roll expansion of 1.87 inch plus allowance for eddy current measurement uncertainty, must be established. Multiple degradation bands are limited to 0.5 inch axial length each, with an inclination angle of no 4
more than 30 degrees from the vertical, and limited to 15 distinct degradation areas within each band. SNC has administratively limited the number of distinct degradation areas in the band to 15, although the Westinghouse support documentationjustifies up to 30 such areas.
If any of these items is not validated, the tube must be repaired.
The total length of aggregate sound roll expansion needed to prevent pullout during all plant conditions for the single and multiple band degradation cases is termed the pullout load react'.on length (PLRL). This term is equivalent to the L* distance.
l 1
i 2
l 1
1
l
. # r j EVALUATION i i- ,
. The proposed license amendment (Technical Specification change) addresses the action ;
required when degradation has been detected in the top portion (within the F* distance) of the :
mechanically expanded portion of steam generator tubes within the tubesheet region. The i presence of the tubesheet enhances the integrity of degraded tubes in that region by precluding
- tube deformation beyond the expanded outside diameter. The roll expansion of the tube into the tubesheet provides a barrier to significant leakage for through wall cracking of the tube in the expanded region. L* criterion approved for implementation at similar plants include provisions which account for the support of the tubesheet in the portion of the tubes below the i top of the tubesheet. The previously approved (at Farley Unit 2 and similar plants) F* criterion was not established to address degradation in the top portion of the tube expansion.
F*/L* Pluuning Criteria Comoarison 5 As stated previously, the L* criterion is essentially an extension of the existing F*
methodology. WCAP-11306 Rev. 2 provides the basis for the F* criterion currently licensed at Farley Unit 2. Both criteria (F* and L*) provide for stmetural integrity of the tube during all plant conditions by verification of SRE lengths. The SRE lengths provide for resistance 4
load capabilities such that the most limiting postulated pressure developed end cap loading defined in Regulatory Guide 1.121 is balanced. In the F* criterion, a SRE length of 1.54 inch plus allowance for eddy current uncertainty measurements must be established below either the bottom of the roll transition, or the top of tubesheet, whichever is lower. The F* distance of ,
1.54 inch is established based on faulted condition loadings and represents the limiting RG !
1.121 loading. The F* criterion precludes primary to secondary leakage during all plant !
conditions. The L* criterion addresses tubes which contain axial or nearly axially oriented eddy current indications within the F* length. The L* criterion includes a minimum length of SPE immediately below the bottom of the roll transition or top of tubesheet, whichever is lower, which precludes significant leakage during all plant conditions. This distance plus allowance for eddy current measurement uncertainty is termed L* length. The SRE length above a crack is summed with the SRE length below the crack tc ensure structural integrity
+
during all plant conditions. This distance of total aggregate SRE is termed L* distance. In both the F* and L' evaluation bases, circumferential separation of the tube is postulated below either the F* or L* distance. Verification of the SRE F* or L* distances provides for structural integrity even for the postulated condition of a tube separation below the F* or L
- distance. Tube rupture can occur if a F* or L* tube is postulated to separate and lift out of the tubesheet due to the end cap load. Verification of the F* or L* distance prevents tube hft from occurring and therefore prevents the possibility of a tube rupture even for a tube postulated to become separated below the F* or L* distance.
L' Evaluation Discussion l
. The proposed change designates a portion of the tube for which tube degradation of a defmed
- type does not necessitate remedial action except as dictated for compliance with tube leakage i
limits as set forth in the Farley Nuclear Plant Unit 2 Technical Specifications. As noted above, 1 the area subject to this change is in the expanded portion of the tube within the tubesheet of
- the steam generators. The length of mechanical expansion required to resist significant leakage
- for all normal operating and postulated accident conditions is designated L* length. Tubes whose integrity is ascertained using L* length will not contribute significantly to off' site dose.
In addition to determining that the expansion of the tube within the L* length is not degraded, ,
4 a determination of the condition of tube degradation in the portion of the tube below the L*
l length must be made to verify that the degraded tube has sufficient structural integrity, i The proposed amendment would modify Technical Specification 3/4.4.6 " Steam Generator Surveillance Requirements" which provides tube inspection requirements and acceptance
- ~
criteria to determine the level of degradation for which the tube may remain in service. The proposed amendment would add definitions required for the L* criterion and prescribe the portion of the tube subject to the criteria. The proposed Technical Specification changes
- accompany this analysis.
1 ANALYSIS 1
Conformance of the proposed amendments to the standards for a determination of no significant hazard as defined in 10 CFR 50.92 (three factor test) is shown in the following:
- 1. Operation of the Farley Nuclear Plant Unit 2 steam generators in accordance with the proposed license amendment does not involve a significant increase in the probability or
. consequences of an accident previously evaluated.
The supporting technical evaluations of the subject criteria demonstrate that the presence of the tubesheet enhances the tube integrity in the region of the hardroll by precluding tube deformation beyond its initial expanded outside diameter. The resistance to both tube rupture and tube collapse is strengthened by the presence of the tubesheet in that region. The result of i 1 the hardroll of the tube into the tubesheet is an interference fit between the tube and the i
tubesheet. Tube rupture can not occur because the contact between the tube and tubesheet
, does not permit sufficient movement of tube material. In a similar manner, the tubesheet does not permit sufficient movement of tube material to permit buckling collapse of the tube during postulated LOCA loadings.
The type of degradation for which the L* criterion has been developed (cracking with an axial or near axial orientation) has been found not to significantly reduce the axial strength of a tube.
An evaluation including analysis and testing has been done to determine the strength reduction for axial loads with simulated axial and near axial cracks. This evaluation provides the basis 4
for the r.cceptance criteria for tube degradation subject to the L* criterion.
The SRE L* length is sufficient to preclude significant leakage from tube degradation located below the L* length. The existing Technical Specification leak rate requirements and accident
. analysis assumptions remain unchanged in the unlikely event that significant leakage from this region does occur. Any leakage from the tube within the tubesheet at any elevation in the tubesheet is fully bounded by the existing steam generator tube rupture analysis included in the
.; o
~
. Farley Nuclect Plant Final Safety Andysis Report. A conservative leakage allowance for each L* tube is provided to determine the impact of L* criterion upon offsite doses in the event of a
, postulated double ended guillotine break of the main steam line outside of containment, but upstream of the main steam line isolation valves. Since Farley Unit 2 has implemented the Interim Plugging Criteria (IPC) for ODSCC at the tube support plates, projected steam line break (SLB) leakage at the end of the next successive operating cycle must be evaluated. Per l Generic Letter 95-05, plants implementing the IPC can utilize SLB leakage limits higher than i i the originally assumed 1.0 gpm primary to secondary leakage value provided an analysis of offsite doses consistent with the Standard Review Plan methodology is performed This
! analysis performed for the Farley Unit 2 plant indicates that primary to secondary leakage of i 11.2 gpm in the faulted loop (0.1 gpm in the intact loops) will result in offsite doses at the site boundary ofless than 10% of the 10 CFR 100 guidelines. The total projected SLB leakage
- ' from all leakage sources must remain below this value. Per attachment 4 addressing the L*
methodology, the number of tube ends to which L* criterion can be applied is limited to 600
- per steam generator. Using a bounding SLB leakage allowance per L* tube, the SLB leakage component from 600 L* tube ends will be less than 0.33 gpm in the faulted loop. The ,
2 proposed L* criterion does not adversely impact any other previously evaluated design basis l accident. . As the current Unit 2 IPC SLB leakage has been calculated to be less than 2 gpm in the faulted loop, a SLB leakage margin of over 9 gpm is provided for this cycle As noted above, tube rupture and pullout is not expected for tubes using the L* criterion. In i addition to the L* length, a minimum length of SRE below the identified degradation must be established. The aggregate L* distance of SRE provides the structural integrity to prevent tube pullout. Conservatively, it is assumed that the degraded band length does not provide any support in resisting tube pullout.
Therefore SNC concludes that Operation of the Farley Nuclear Plant Unit 2 steam generators
, in accordance with the proposed license amendment does not involve a significant increase in 4 the probability or consequences of an accident previously evaluated.
- 2. The proposed license amendment does not create the possibility of a new or different l l- kind of accident from any accident previously evaluated.
4
- ' Implementation of the proposed L* criterion does not introduce any significant changes to the plant design basis. Use of the criterion does not provide a mechanism to result in an accident initiated outside of the region of the tubesheet expansion. The structural integrity of L* tubes will be maintained during all plant conditions. Any hypothetical accident as a result of any tube
- degradation in the expanded portion of the tube would be bounded by the existing tube rupture accident analysis. Ifit is postulated that a circumferential separation of an L* tube were to occur below the PLRL, tube stmetural and leakage integrity will be maintained during all plant conditions. Verification of the L* distance of non-degraded tube roll expansion prevents the !
postulated separated tube from lifting out of the tubesheet during all plant conditions.
- Verification of the L* criterion prevents tube displacement of any magnitude, and therefore,
, postulated axial cracks existing a minimum of 0.5 inch from either the bottom of the roll transition or top of tubesheet, whichever is lower, from migrating out of the tubesheet.
j Therefore, SNC concludes that the proposed license amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.
__ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ -- e v 7
. ; . a <
- 3. The proposed license am:ndment does not involve a significant reduction in a margin ofsafety.
. 1 The use of the L* criterion has been concluded to maintain the integrity of the tube bundle commensurate with the requirements of draft Regulatory Guide 1.121 under normal and postulated accident conditions. The safety factors used in the verification of the strength of the degraded tube are consistent with the safety factors in the ASME Boiler and Pressure Vessel Code used in steam generator design. The L* length has been verified by testing to be greater than the length of roll expansion required to preclude significant leakage during normal and postulated accident conditions. The leak testing acceptance criteria are based on the primary to secondary leakage limit in the Technical Specifications and the leakage assumptions used in the FSAR accident analyses. The L* distance provides for structural integrity during all plant conditions.
Implementation of the L* criterion will decrease the number of tubes which must be taken out of service with tube plugs or repaired with sleeves. Both plugs and sleeves reduce the RCS flow margin, thus implementation of the L* criterion will maintain the margin of flow that would otherwise be reduced in the event ofincreased plugging or sleeving.
Therefore, SNC, concludes based on the above, it is concluded that the proposed change does not result in a significant reduction in a loss of margin with respect to plant safety as defined in the Final Safety Analysis Report or the bases of the FNP technical specifications.
CONCLUSION Based on the preceding analysis, it is concluded that operation of Ae Farley Nuclear Plant Unit 2 steam generators in accordance with the proposed amendment dces not involve a significant hazards consideration as defined in 10 CFR 50.92.
4 END OF EXCERPT Based on the analysis provided above it is concluded that operation of the Farley Nuclear Plant in accordance with this proposed amendment for the remainder of Cycle 11 does not involve a
- significant hazards consideration as defined in 10 CFR 50.92.
l I
f
- + 2 __ . _ _ _ .
.,' . s :
+
a Attachment 2 Revised Technical Specification Pages l
1 i
l l
1 l
l l
l l