Special Rept:On 950917,noted Plant Vent Monitors Been Out of Svc for Longer than Allowed.Operators Annotate Log Books Each Time Equipment Operability Status Changes.Rept Delayed in Order to Provide Complete Response
ML20093B207
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 10/02/1995
From: Marsh W
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9510110286
Download: ML20093B207 (2)


Text

. _ _ _ _- __ . . . _ _ . . _ . _ . _ . _ . _ _ . . _ _ _ _

e

/

~

Southem Califomia Edison Company P. O. BOX 128 SAN CLEMENTE, CALIFORNIA 92674 0128

' TELEP 10NE WALTER C. MARSH l

U. S.-Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

' Docket No. 50-361 Special Report San Onofre Nuclear Generating Station, Unit 2

Reference:

Technical Specification 3.3.3.1 Technical Specification 3.3.3.1 requires Edison to maintain one plant vent stack (PVS) monitor (2RT-7865 or 3RT-7865) cperable when either Unit 2 or 3 is in Mode 1, 2, or 3. Due to -

non-uniform mixing in the common PVS plenum, Edison conservatively requires both PVS monitors to be operable when either Unit is in Mode 1, 2, or 3. When either monitor is '

inoperable for a period of greater than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, Edison conservatively implements the preplanned alternate method of monitoring the PVS (in accordance with TS 3.3.3.1, Action 19) for i both monitors and submits a special report to the NRC. This report is provided because less than two monitors were available for about 89 hours0.00103 days <br />0.0247 hours <br />1.471561e-4 weeks <br />3.38645e-5 months <br /> between September 13 and 17, 1995.

Between September 13 and 17, 1995, when Unit 2 was in Mode 1 and

. Unit 3 was in Modes 4 and 5; the Unit 2 PVS monitor '. 2 RT-7 8 65 )

was removed from service for about 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> to perform a routine surveillance and the alternate monitoring method was implemented for both 2RT-7865 and 3RT-7865. Due to an administrative change discussed below, 3RT-7865 was not returned to service when 2RT-7865 was returned to service. When reviewing the Unit 3 records on September 17, it was noted that the monitor (s) had been out of service for longer than allowed.

.The reason the monitors were inoperable for this period was an inappropriate' change to the equipment control administrative

' tracking process. This process uses three separate log books, one each for Units 2 and~3 (unit-specific books), and one for common equipment' (both-unit ' impact book) . Operators annotate the

, , log books each time equipment operability status changes. When a n .a 9510110286 951002 PDR S - . __

ADOCK 05000361 '/ 0

.PDR_ #

?

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .-r .,

." l l

Document Control Desk revisi.ng this process during the summer of 1995, Edison inappIopriately moved the common PVS monitors from the "both unit impact" log book to the unit-specific books (the monitor numbers are Unit specific, "2RT" and "3RT," but Edison's requirement to have them both operable was overlooked).

Edison has returned PVS monitor tracking to the "both unit impact" book. Because the preplanned alternate method of monitoring was in effect, there was no safety significance to this event.

This report was delayed in order to provide a complete response.

If you have any questions, please contact me.

Sincerely, h e ( W V

cc: L. J. Callan, Regional Administrator, NRC Region IV J. E. Dyer, Director, Division of Reactor Projects, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 & 3 t __ . __ . _