NRR E-mail Capture - Sequoyah Nuclear Plant, Unit 1 - Acceptance of License Amendment Request to Change the Frequency of Steam Generator Tube Inspections
ML20076B607
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/16/2020
From: Perry Buckberg
NRC/NRR/DORL/LPL2-2
To: Gerald Williams
Tennessee Valley Authority
References
L-2020-LLA-0030
Download: ML20076B607 (3)


Text

From: Buckberg, Perry Sent: Monday, March 16, 2020 10:22 AM To: 'Williams, Gordon Robert' Cc: Hulvey, Kimberly Dawn; Shoop, Undine

Subject:

Sequoyah Nuclear Plant, Unit 1 - Acceptance of License Amendment Request to Change the Frequency of Steam Generator Tube Inspections (EPID L-2020-LLA-0030)

Gordon, By letter dated February 24, 2020 (Agencywide Documents Access and Management System Accession No. ML20056C857), the Tennessee Valley Authority (TVA or the licensee) submitted a license amendment request (LAR) for Sequoyah Nuclear Plant, Units 1 and 2. The purpose of this communication is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your LAR, and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment.

Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 220 hours0.00255 days <br />0.0611 hours <br />3.637566e-4 weeks <br />8.371e-5 months <br /> to complete. The NRC staff expects to complete the review in approximately 12 months, which will be in March 2021. If there are emergent complexities or challenges in our review that would cause changes to this forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.

If you have any questions, please contact me at (301) 415-1383 or by e-mail at Perry.Buckberg@nrc.gov.

U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Perry Buckberg Senior Project Manager / Agency 2.206 Petition Coordinator

office: (301)415-1383 perry.buckberg@nrc.gov Mail Stop O-8B1a, Washington, DC, 20555-0001

Hearing Identifier: NRR_DRMA Email Number: 480 Mail Envelope Properties (BY5PR09MB4216E018407903AD134EEE1B9AF90)

Subject:

Sequoyah Nuclear Plant, Unit 1 - Acceptance of License Amendment Request to Change the Frequency of Steam Generator Tube Inspections (EPID L-2020-LLA-0030)

Sent Date: 3/16/2020 10:21:42 AM Received Date: 3/16/2020 10:21:00 AM From: Buckberg, Perry Created By: Perry.Buckberg@nrc.gov Recipients:

"Hulvey, Kimberly Dawn" <kdhulvey@tva.gov>

Tracking Status: None "Shoop, Undine" <Undine.Shoop@nrc.gov>

Tracking Status: None

"'Williams, Gordon Robert'" <grwilliams1@tva.gov>

Tracking Status: None Post Office: BY5PR09MB4216.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2910 3/16/2020 10:21:00 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: