Proposed TS 3/4.8.1.1 Re EDG Surveillance Requirements Changes
ML20078R233
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 12/15/1994
From:
Public Service Enterprise Group
To:
Shared Package
ML20078R223 List:
References
NUDOCS 9412230256
Download: ML20078R233 (2)


Text

-

l ATTACHMENT 2 TECHNICAL SPECIFICATION PAGES WITH PEN AND INK CHANGES LICENSE AMENDMENT APPLICATION 94-31, NLR-N94213 EDG SURVEILIANCE REQUIREMENT CHANCES ,

FACILITY OPERATING LICENSE NPF-57 HOPE CREEK GENERATING STATION DOCKET NO. 50-354 The following Technical Specifications have been revised to reflect the proposed changes:

Technical Soecification Page 4.8.1.1.2.h.1 3/4 8-6

)

P "b 9412j$

F.,

gOCK 05000354 1 PDR i

. 1

> . ELECTRICAL POWER SYSTEMS ,

SURVElLLANCE RE0UIREMENTS (Continued)

3. Within 2 weeks after obtaining the sample, verify that the other properties specified in Table 1 of ASTM-D975-77 and Regulatory Guide 1.137, Position 2.a, tre met when tested in accordance with ASTH-0975-77.
g. Deleted  :
h. At least once per 18 months #, during shutdown, by:
1. gjggy{gg jf.gygppg g.jjg,gggyggjgygggggggfj(.-

Y ' "" '3d um ry .w....~..u'_ 3u ' X. .v'....Yon" ' .'" u" ' s ? ""i. ".'.'"."6v"'"

. n u u,-"'.._".".",'"c'".""'"

u

2. Verifying the diesel generator capability to reject a load of greater than or equal to that of the RHR pump motor (1003 kW) for each diesel generator while maintaining voltage at 4160 t 420 volts and frequency at 60 1 1.2 Hz. t
3. Verifying the diesel generator capability to reject a load of 4430 kW without tripping. The generator voltage shall not exceed 4785 volts during and following the load rejection.
4. Simulating a loss of offsite power by itself, and:

a) Verifying loss of power is detected and deenergization of the emergency busses and load shedding from the emergency  :

I busses.

l b) Verifying the diesel generator starts

  • on the auto-start i signal, energizes the emergency busses with permanently connected loads within 10 seconds after receipt of the l start signal, enercizes the autoconnected shutdown loads through the load sequencer and operates for greater than or equal to 5 minutes while its generator is loaded with the shutdown loads. After energization, the steady state voltage and frequency of the emergency busses shall be i maintained at 4160 1 420 volts and 60 t 1.2 Hz during this I test.
  • This diesel generator start (10 sec) and subsequent loading (130 sec) from l ambient conditions may be preceded by an engine prelube period and/or other j warmup procedures recommended by the manufacturer so that mechanical stress and wear on the diesel engine is minimized.
  1. For any start of a diesel generator, the diesel must be loaded in accordance with the manufacturer's recommendations.

i HOPE CREEK 3/48-6 Amendment No. 65


e--,, -

- - --*--y 1