Forwards Addl Info Re IE Bulletin 80-11, Masonry Wall Design, in Response to NRC Request
ML20083M730
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/26/1983
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Vassallo D
Office of Nuclear Reactor Regulation
References
REF-SSINS-6820 IEB-80-11, JPN-83-06, JPN-83-6, NUDOCS 8302010443
Download: ML20083M730 (3)


Text

, -.

POWER AUTHORITY OF THE STATE OF NEW YORK 10 CotuMaus CIRCLE NEW YORK N. Y.1o019 (212) 397 6200 "$[,$,'[NY,,',7, opsn.vene oppecen T8' U ST E E S WALTER T. MICINSKI sa"",,,', ,a;a"  :::'.= .r.

.....o............

GEORGE L. INGALLS *'"

.... c .. -a" January 26, 1983 Jo= =l,",,a;,5 c,H, ";= = = "

nicuaRo u. revss JPN-83-06 la,;*',=,=,"l

,, * *"' = "

ROSERT 4. MILLO NZ1 JOHN W. BOSTON FREDERICK R. CLARfC a saamme Pm mounus THOM AS R. FREY sana 6coum b Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing

Subject:

James A. FitzPatrick Nuclear Power Plant Docket 50-333 i

IE Bulletin 80-11, " Masonry Wall Design"

Dear Sir:

A member of your staff telephoned the Authority to request additional information regarding masonry wall design at our FitzPatrick Plant.

our response.

Attached to this letter is a summary of those questions and If you have any further questions, pleaca contact Mr. J.A. Gray, Jr.

j of my staff

(

Very truly yours, NqC) 'n -

J1 ."Baydd' l

' Executive Nice President Nuclear Generation l cc: fir . J . Linville Resident Inspector i U.S. Nuclear Regulatory Commission l P.O. Box 136 Lycoming, 13093 Sfn l 8302010443 830126 l PDR ADOCK 05000333 j Q PDR I

Attachment to OvN-83-06 POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Response to Oral Request for Additional Information Regarding Masonry Wall Design, IE Bulletin No. 80-11 QUESTION 1: Identify those masonry walls evaluated by the Power Authority which have stress factors greater than those specif'.ed by the NRC's Structural Engineering Branch for extreme environmental conditions - (1.5 for tension parallel to bed joint and 1.3 for tension normal to the bed joint and masonry shear) .

RESPONSE 1: Two masonry walls have calculated stress factors greater than 1.50 for tension parallel to the bed joint.

a. Wall No. PH-255-3 (Pumphouse) , stress factor:

1.57.

b. Wall No. EB-272-15 (Turbine Building) , stress factor: 1.65. This wall was formerly considered as wall Nos. EB-272-13. (see Ref. 1)

The only wall with a stress factor greater than 1.30 for tension normal to the bed joint is Wall No.

EB-272-11 (Turbine Building), with a stress factor of 1.32. This is only slightly over the 1.30 criteria. Although the Authority was told during discussions with NRC staff members that this wall could be omitted from this list, we have included it for completeness.

QUESTION 2: Identify the location of those masonry walls with stress factors greater than 1.30. Identify structures, systems and components in their immediate vicinity.

RESPONSE 2: This information was previously supplied to the NRC in a report entitled "IE Bulletin No. 80-11, (60 day Response) . " This report was submitted as an attachment to Refernece 1.

i l

/ . .

QUESTION 3: Provide jdstification for those masonry walls with stress factors in excess of 1.30.

RESPONSE 3: Refer to the Au .ority's response to to Question 5 of Reference 2 for a discussion of allowable stress factors.

References:

1. July 10, 1980 letter, R.J. Pasternak (PASNY) to B.H. Grier (USNRC) re-farding IE Bulletin No. 80-11 (JAFP-80-565)
2. June 17, 1982 letter, J.P. Bayne i

(PASNY) to D.B. Vassallo (USNRC) regarding request for additional l information on masonry wall design - (JPN-82-51) d l

f F