ML20084E111

From kanterella
Revision as of 02:41, 18 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
AO 50-244/74-19:on 741204,during Monthly Surveillance Test PT-9,undervoltage Relay 274/11B Failed.Caused by Scale Accumulation on Armature Plunger Opposite Upper Guide Bearing.Plunger Polished
ML20084E111
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/05/1974
From: Platt C
ROCHESTER GAS & ELECTRIC CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20084E113 List:
References
AO-50-244-74-19, NUDOCS 8304140107
Download: ML20084E111 (1)


Text

. -

t____.., ._: . . . _ _ .-

~  ! (

( k ,. . _,

. . , . _ - _ . . .., e. ,

'. , '. *:' '1.l j Q .u.

g. 3 _y \[ .....

ROC ll ESTER GAS AND ELECTRIC CORPORATION o 69 EAST AVGNUE. .iOCHESTER. H.Y.14M9 T c L E P**ON I aata coot tie 546 2700 Ginna Station December 5, 1974 Mr. James P. O'Reilly, Director l Directorate of Regulatory Operations

Region 1 y

( U. S. Atcmic Energy Cc= mission (.

i 631 Park Avenue '

k King of Prussia, Pa. 19406

\,

I

Subject:

Abnormal Occurrence 74-19: Failure of Undervoltage Belay During k Monthly Surveillance Test

{ Ginna Station

! Docket #50-244 t

i i

Dear Mr. O'iicilly:

I During the pcrformance of the Monthly Serveillance Procedure PT-9, "Under-voltage and i'nderfrequency Protection" on Dcccaber 4, 1974, upon opening the knife switches for the solenoid coil of primary undervoltage device .

274/118. It was discovcred that tne device armature did not irop down to asswae its' de-caergized position. As a result of this f ailure to operate, the Reactor Trip Undervoltage Protection sir,nal was not generated for this i relay. The knife switches were it=ediately opened again, an<' this second l t'ime the relay operated properly. The other thrce undervoltage relays on the 4160 volt bus were tested and they operated properly.

RG&E Relay Department was contacted and a relay can came to the station to l Investigate the failure. .

4 f

A scale accumulation was noted on the armature plunger opposite the area of

, the upper guide bearing. Thi accumulation uas similar to that reported as l abnormal occurrence 73-1 on May 29, 1973. All four undervoltage relays were

removed, cac at a tire, and the scale accumulation was removed and the plun-l ter polished. Upon returning the devices to service, the applicable sect' ion of PT-9 procedure was performed to verify operability.

l f Very truly yours, g41401oy741213 ADOCK 05000244

/bi Y~

S Charles E. Platt PDR Superintendent cc: Mr. J. F. O' Leary, AEC ,g[i .

Mr. G. J. Swarthout, RC&E Hr. L. D. L'hite, Jr. RG&E

$J //>yk

- "t. 2, .i v .L mn sun soloN

^T ,