ML20087P820

From kanterella
Revision as of 03:16, 13 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Second Supplemental Response to State of Il Second Set of Interrogatories.Certificate of Svc Encl.Related Correspondence
ML20087P820
Person / Time
Site: Clinton Constellation icon.png
Issue date: 03/23/1984
From: Hall D
ILLINOIS POWER CO.
To:
ILLINOIS, STATE OF
References
OL, NUDOCS 8404090399
Download: ML20087P820 (53)


Text

n ,

lV 1 . w.sg& -

f:U' ColMETE0 U%fT 1 ('i UNITED STATES OF AMERICA ,84 / IPR -9 N0 24 NUCLEAR REGULATORY COMMISSION IN THE MATTER OF

.t:.s,jg'

) 3RANp!

l'j ILLINOIS POWER COMPANY, )

SOYLAND POWER COOPERATIVE, INC. )

and WESTERN ILLINOIS POWER )

COOPERATIVE, INC. ) Docket No. 50-461 OL

)

(Operating License for Clinton )

O Power Station, Unit 1) )

NOTICE O TO: Hugh K. Clark, Esq., Chairman P.O. Box 127A Kennedyville, Maryland 21645 Dr. George A. Ferguson School of Engineering

~~; Howard University 2300 Sixth Street, N.W.

Washington, D.C. 20059 Dr. Oscar-H. Paris Atomic Safety and Licensing Board a U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Executive Legal Director United States Nuclear Regulatory Commission Washington, D.C. 20555 Philip L. Willman Assistant Attorney General Environmental Control Division 160 North LaSalle Street Room 900 3 Chicago, Illinois 60601 Jean Foy 511 W. Nevada Urbana, Illinois 61808 J

0404090399 840323 PDR ADOCK 05000461 l

ns03

O Prairie Alliance O Box 2424 Station A Champaign, Illinois 61820 H 'bert H. Livermore L a. Nuclear Regulatory Commission O Clinton Nuclear Power Station RR 3, Box 229A Clinton, Illinois 61727 Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission O Washington, D.C. 20555 Atomic Safety and Licensing Appeal Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555

O

'PLEASE TAKE NOTICE that I have today filed with the Secretary of the United States Nuclear Regulatory Commission SECOND SUPPLEMENTAL RESPONSE OF ILLINOIS POWER TO THE STATE OF ILLINOIS' SECOND SET OF INTERROGATORIES TO APPLICANTS in the above-captioned matter. A copy of this document is attached C) hereto and hereby served upon you.

O -

0D WJh9 One of the Attorneys for Applicants Sheldon A. Zabel

.O Charles D. Fox IV SCHIFF HARDIN & WAITE 7200 Sears Tower 233 South Wacker Drive Chicago, Illinois 60606 (312) 876-1000 Dated: April 4, 1984

9
o

e O

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION c)

IN THE MATTER OF )

ILLINOIS POWER COMPANY, )

SOYLAND POwzR COOPERAT E, INC. )

O and WESTERN ILLINOIS POWER ) Docket No. 50-461 OL COOPERATIVE, INC. )

)

(Operatint, License for Clinton )

Power Station, Unit 1) )

O SECOND SUPPLEMENTAL RESPONSE OF ILLINOIS POWER TO THE STATE OF ILLINOIS' SECOND SET OF INTERROGATORIES TO APPLICANTS C)

Pursuant to Section 2.740(e) of the Rules of Prac-tice of the Nuclear Regulatory Commission, Illinois Power Company ("IP"), on behalf of itself, Soyland Power Coopera-() tive, Inc., and Western Illinois Power Cooperative, Inc.,

the Applicants for an operating license for Unit 1 of the Clinton Power Station (" Applicants"), hereby further supple-O ments through September 30, 1983, with respect to those in-terrogatories on Contention II, its RESPONSE OF ILLINOIS POWER TO THE STATE OF ILLINOIS' SECOND SET OF INTERROGATORIES O TO APPLICANTS, dated December 15, 1981 (the " Response"), and its SUPPLEMENTAL RESPONSE OF ILLINOIS POWER TO THE STATE OF ILLINOIS' SECOND SET OF INTERROGATORIES TO APPLICANTS, dated O March 16, 1982 (the "First Supplemental Response"), as follows:

'O c

O

[ General Interrogatory No. 1: Identify all persons who have assisted in any way in the preparation of each answer to each interrogatory below and describe c) the substance of each person's assistance.]

ANSWER: All information for this Second Supplemental Response was prepared under the supervision and direction O of w. connell, Illinois Power Manager-Quality Assurance.

[ General Interrogatory No. 2: Identify all docu-ments that were relied upon to provide an answer O to each interrogatory below, and describe the sub-stance of each document so used.]

ANSWER: Relevant documents have been made available to the State of Illinois on December 6, 7, and 8, 1983.  ;

O

[ General Interrogatory No. 3: Identify all persons whom IP plans to call to testify as to each conten-tion, and state the qualifications of each person so identified.]

- C)

ANSWER: Illinois Power has not yet determined which persons it will call as witnesses on Contention II should a hearing prove necessary.

!O

[ General Interrogatory No. 4: Describe for each interrogatory any additional research or work, if I any, that IP plans to do that will affect the answer.]

'O ANSWER: Illinois Power is continuously engaged in monitor-ing information that may affect the design, construction or operation of the C-linton Power Station. Unless otherwise O

noted, or unless new information indicates the need for fur-t ther investigation, Illinois Power does not plan to conduct

'O o

O further research or work which may affect the answers rela-O tive to a particular interrogatory. -

[5. Identify the persons who were, but are no longer, employed on the inspection staff of O Baldwin Associates' (;B A) Department of Quality l Control (QC). For each person so identified state: i

a. his qualifications for the position O b. his performance in the position
c. the time period of his employment in the position;and
e. the reason for termination of employ-O ment.) -

ANSWER: See Exhibit A.

() [d. the substance of any complaints made by him to IP, BA, or NRC about QA/QC pro-gram;)

ANSWER: To the best of Illinois Power's information, there have been no such complaints.

[6. State how many persons are now employed on the QC inspection staff.]

ANSWER: Ninety-seven individuals are presently employed on the Baldwin Associates QC inspection staff.

[6.a. State how many of that number are undergoing

.O training to meet the requirements for the position. Describe what training they are receiving.]

.O l

lO l

l

'O

, ANSWER Thirty individuals are undergoing training. Seven-O teen of these are new employees receiving training for initial certification. Thirteen individuals are being trained for advanced certifications. The general training description for QC personnel is the same as provided in the answer to Interrogatory No. 6.a. of the First Response.

O [7. State how many persons are now employed in the BA QC Department.]

ANSWER: One hundred twenty-four individuals are presently employed in the Baldwin Associates QC Department.

[7.a. State how many of the number are undergoing training to meet the requirements for the position. Describe the positions for which

, () they are receiving training and the type of training involved.]

t ANSWER: Thirty individuals are undergoing training. Seven-teen of these are new employees receiving training for initial O certification. Thirteen individuals are being trained for advanced certifications. The general training description for QC personnel is the same as provided in the answer to

4) Interrogatory No. 6.a. of the First Response.

[8. Identify those persons who were, but are no longer, employed on the inspection staff of BA's piping department. For each person so

13 identified state:
a. his qualifications for the position;
b. his performance in the position;
O l t I

lO

.O

c. the time period of his employment in the position;
d. the substance of any complain's he made to IP, BA, or NRC about the Qa/QC program; and i

O e. the reason for termination of employment.]

ANSWER: BaIdwin Associates Piping Department does not have an inspection staff. Inspection activities are performed by g Baldwin Associates Quality Control employees responsible for mechanical inspection. See Exhibit A for Baldwin Associates Quality Control personnel.

O

[9. Identify those persons who are now employed on the inspection staff of BA's Piping Depart-ment. For each person so identified state:

a. his duties and responsibilities; O
b. his qualifications for the position; and
c. the substance of any complaints he had made to IP, BA, or NRC about the QA/QC program.]

ANSWER: Baldwin Associates' Piping Department does not have an inspection staff.

Inspection activities relating to piping is performed by Baldwin Associates' Quality Control employees responsible for mechanical inspection. See Exhib-it B for information requested with respect to Baldwin As-sociates' Quality Control employees responsible for mechani-O cal inspections.

9 D

~.

O i

, () [10. Identify each person who is now employed in i

the BA small bore design group. For each person so identified state:

a. his duties and responsibilities; and
b. his qualifications for the position;]

O )

\

ANSWER: See Exhibit C. j

[c. the substance of any complaints he had O

made to IP, BA, or NRC about the QA/QC program.]

ANSWER: To the best of Illinois Power's knowledge, there have been no such complaints.

O

[11. Describe the current QA system for the docu-mentation of procurement and specification requirements,

a. Describe the changes if any, that IP has O made in this system since the issuance of IE Inspection Report 50-461/81-05.]

ANSWER: The following changes have been made since the

O First Supplemental Response.
1. For procurement where contracts are still open, Engineering Change Notices ("ECNs") have been issued where necessary. The ECNs modify the documentation handling requirements to achieve consistency with the project documentation system.
2. For procurement where final payment has been made, Illinois Power and Baldwin Associates have de-veloped documentation checklists and are obtaining further documentation where necessary.

O

O

[ll.b. Identify all those persons who are respon-sible for the changes, if any, that IP had made in this system.]

! C)

I ANSWER: The persons responsible are J. D. Geier, Illinois Power Manager-Nuclear Station Engineering Department;

.g J. E. Findley, Baldwin Associates Manager of Quality and Technical Services until September 1983; L. Osborn, Baldwin Associates Manager of Quality and Technical Services since O September 1983; and L. Moore, Baldwin Associates Resident Engineer.

[11.c. Identify all those persons who are responsi-

.O ble for the management, operation and imple-mentation of this system.]

4 ANSWER: The persons responsible are J. D. Geier, Illinois Power Manager-Nuclear Station Engineering Department; W.

40 Connell, Illinois Power Manager-Quality Assurance; J. E.

l Findley, Baldwin Associates Manager of Quality and Technical Services until September 1983; L. Osborn, Baldwin Associates Manager of Quality and Technical Services since September 1983; and L. Moore, Baldwin Associates, Resident Engineer.

t () [12. Describe the current system of using travelers to detail installation and inspection require-i ments.

O .

'O O

O

a. Describe the changes, if any, that IP l C) has made in this system since the issu-ance of IE Inspection Report 50-461/81-05.]

ANSWER: " Travelers," which are used in the fabrication and installation of items, are now generated by the Traveler O

Preparation and Review Group ("TPRG"). TPRG is a combina-tion of representatives from Baldwin Associates' Engineer-ing, Technical Services, and Quality Control. Where appro-O priate on particular travelers, TPRG will include representa-tives of Illinois Power, General Electric and the Authorized Nuclear Inspector. TPRG, as part of its review, allows for

'O the application of " hold points" and sequence steps to permit controlled inspections to take place during the performance of work.

O After TPRG generates a traveler, the traveler is sent to the Traveler Tracking System ("TTS") as the central holding area for open traveler packets in accordance with O

Procedure BAP 2.32. From TTS, the travelers are issued on an allotment basis to Baldwin Associates' superintendents to proceed with the field work. Allotments to superintendents

O are based on schedules of work to do known as " Level III Schedules." The appropriate official of each of Baldwin l Associates' Construction, Engineering, Technical Services, 10 I and Quality Control signs the Level III schedule to verify O

O

O that each can provide the manpower to support the time frames shown on the travelers.

When Construction has completed work on a particu-lar traveler, the superintendent submits the traveler to Quality Control for final acceptance in the field. Upon Quality control's acceptance, the superintendent signs the traveler to show his acceptance.

O The traveler is then forwarded through TTS to TPRG. l TPRG personnel will review all documents for concurrence to procedures, drawings, and architectural engineering design

.O documents. After acceptance by TPRG, the traveler is for-warded to the Document Records Center as a permanent plant record.

g Baldwin Associates' Quality Assurance is respon-sible for the review of permanent records in accordance with BAP 2.20. This review is being conducted under the super-vision of the manager of Baldwin Associates' Quality Assur-ance by the Document Review Group. Discrepancies are noted on Document Exception Lists (" DEL's") which must be resolved before Baldwin Associates will consider a Traveler to have been accepted. Illinois Power Quality Assurance reviews in

.O detail a percentage of the traveler documentation previously accepted by Baldwin Associates' Quality Assurance.

!Q

_g_

l O

O l

[12.b. Identify all those persons who are respon-sible for the changes, if any, that IP had C) made in this system.]

ANSWER: The persons responsible are W. Connell, Illinois 4

Power Manager-Quality Assurance; J. E. Findley, Baldwin O Associates Manager of Quality and Technical Services until September 1983; and L. Osborn, Baldwin Associates Manager of Quality and Technical Services since September 1983.

O

[12.c. Identify all those persons who are responsi-ble for the management, operation, and imple-mentation of this system.]

ANSWER: The persons responsible are D. P. Hall, Illinois Power Vice President; W. Connell, Illinois Power Manager-Quality Assurance; J. H. MacKinnon, Illinois Power Project Manager; W. Harrington, Baldwin Associates Project Manager; J. E. Findley, Baldwin Associates Manager of Quality.and Technical Services until September 1983; and L. Osborn, Baldwin Associates Manager of Quality and Technical Services since September 1983.

[13. State the basis for IP's conclusion that the C) requirement that vendors acquire written au-thorization from IP, prior to shipment, to substitute a certificate of compliance for missing documentation is unrealistic.]

ANSWER: The answer to Interrogatory No. 13 in the First O supplemental Response is still valid, i

O iO

O

[14. Describe the QA system of document accounta-

, c) bility and control that IP believes assures compliance with requirements for issuance of materials and equipment for installation or use at CPS-1.]

ANSWER: The answer to Interrogatory No. 14 in the First O supplemental Response is still valid.

[15. State what IP believes is the purpose of Pro-cedures BA 2.20 and BA 2.3 and describe what

'O procedures IP uses to meet this purpose.]

ANSWER: Ths answer to Interrogatory No. 15 in the First Supplemental Respc.3e is still valid.

!b [16. Describe the system IP is using to inspect safety-related pipe hangers.]

ANSWER: The system used to inspect safety-related pipe

C) hangers is described in BAP 3.2.5, Rev. 4, and QCI 300, Rev. 5.

[16.a. Describe the changes, if any, that IP had made in this system since the issuance of IE Inspection 50-461/81-05.]

'O ANSWER: The system used to inspect safety related pipe hangers is described in BAP 3.2.5, Rev. 4, and OCI 300 Rev. 5.

The following changes have been made to the system since the 43 First Supplemental Response.

1. Pipe whip restraints were added to the scope of Phase II inspections. Phase II inspections are

{

lc) performed after the pipe has been connected to the

! supports.

() i I

10

'C)

C) 2. The timing of Phase III inspections was changed from " prior to system functional testing" to " prior to system turnover." Phase III is a re-inspection O of piping systems to verify that construction of adjacent or nearby items has not resulted in damage to completed piping systems and has not caused any O physical interferences with the piping systems.

Another separate inspection is performed immediately prior to system functional testing to verify that

'O all adjustable supports are correctly set.

3. New checklists were added for inspection of Sliding-Type Supports and Multi-Directional Clamp Hangers.

() 4. Inspection criteria for the following were added or clarified:

a) Jam nuts; b) Bending of pipe clamps for field fit-up;

.O c) variable spring hangers; d) Angularity of supports attached to embed plates; e) Offset (from center of plate) for attachments to expansion anchor plates; f) Clearance between box-type supports and pipe;

O and g) Clearanca between shear lugs and pipe clamps.
5. A table was added to show the correlation between l Sargent & Lundy and the American Welding Society (O

weld symbols.

1

-()

O

~

l l

O O 6. Installation tolerances which are specified by the manufacturer of component supports were added to the procedure.

O

[16.b. State the average maximum time span between hanger installation and QC inspection.]

ANSWER: The maximum time span between receipt of a traveler o for hanger inspection and the completion of the final Quality Control inspection is one to two days.

[16.c. State whether this system requires documenta-O tion of who installed the hanger components and when installation was completed.]

ANSWER: The answer to Interrogatory No.16.c. in the First Supplemental Response is still valid.

O

[16.d. Identify all those persons who were responsi-ble for the changes, if any, that IP had made in this system.]

O ANSWER: The persons responsible are J. E. Findley, Baldwin Associates Manager of Quality and Technical Services until September 1983, and L. Osborn, Baldwin Associates Manager of O Quality and Technical Services since September 1983.

[16.e. Identify all those persons who are responsi- 1 ble for the management, operation, and imple-  !

mentation of this system.;

O ANSWER: The persons responsible are W. C. Gerstner, Illi-noi T Power Executive Vice President; D. P. Hall, Illinois Power Vice President; W. Connell, Illinois Power Manager-O l

O

-- - _ _ _ =_

O Quality Assurance; J. E. Findley, Baldwin Associates Manager of Quality and Technical Services until September 1983; and L. Osborn, Baldwin Associates Manager of Quality and Technical Services since September 1983.

[17. Describe IP's system to ensure that welders are familiar with welding procedures and pa-rameters.

O a. Describe the changes, if any, that IP has made in this system since the issu-ance of IE Inspection Report 50-461/81-05.

b. Identify all those persons who were re-O sponsible for changes, if any, that IP made in this system.
c. Identify all those persons who are re-sponsible for management, operation, and implementation of this system.]

ANSWER: All welders are tested and certified to weld proce-dure specifications in accordance with project procedures.

After certification, each welder is issued a copy of the

" Welding Procedure Specification Handbook" (JV-493 ) which is controlled in accordance with Project Document Control Pro-cedures. Furthermore, specific weld procedures are avail-able and controlled at various document control centers.

Technical Service Welding Inspectors check welders prior to welding. The purpose of this pre-welding inspection is to ensure that each welder has a copy of the " Welding Procedure Specification Handbook" with him when conducting welding activities.

i

O

O

[18. Describe the record and document control system that IP uses to correlate IP audit findings O to the necessary corrective actions.

a. Describe the changes, if any, that IP had made in this system since the issu-ance of IP Inspection Report 50-461/81-0 05.]

ANSWER: Th'e method used to correlate corrective actions to audit findings is to document the corrective action taken on g the respective audit finding form. Furthermore, the Audit Team Leader's evaluation of corrective action and the veri-fication of corrective action is documented on the audit g finding form. Upon completion of these, actions, a formal close-out of the audit finding is performed by the Supervisor-Audits.

O

[18.b. Identify all those persons who are responsi-ble for the changes, if any, that IP had made in this system.

c. Identify all those persons who are responsi-O ble for the management, operation and imple-mentation of this system.]

ANSWER: The persons responsible are W. Connell, Illinois Power Manager of Quality Assurance and R. E. Campbell, Illi-O nois Power Director of Quality Systems & Audits.

[19. Describe the system that IP uses to control the' time taken between the completion and g QA/QC inspection of work.

a. Describe the changes, if any, that IP had made in this system since the issu-ance of IE Inspection Report 50-461/81-05.

O O

__ _ _ _ _ _ - - _ _ _ _ . . - _ __ a

O

b. Identify all those persons who are re-sponsible for the changes, if any, that
O IP had made in this system.
c. Identify all those persons who are re-sponsible for the management, operation, and implementation of this system.]

iO ANSWER: Travelers, which are work and inspection sequence i

i documents used to control fabrication and installation of items, are prepared by a Traveler Preparation and Review O Group ("TPRG"). TPRG, as part of its review, designates

" hold points" and sequence steps for performance of Quality Control inspections. This includes final inspection after O completion of work.

l After the required inspections are designated on f

travelers by the TPRG, the travelers are sent to the Traveler

C) Tracking section ("TTS"). The TTS controls issuance of travelers to Baldwin Associates discipline / area superinten-l i

dents who are responsible from performing installation and O fabrication. Travelers are issued by the TTS in accordance with allocations that are based on project schedules and the availability of Quality Control personnel to perform inspec-1 (D tions of the completed work. Superintendents cannot with-draw travelers beyond the predetermined allocation except when authorized by the Project Manager, the Baldwin As-C) sociates Manager of Quality and Technical services, and the ,

supervisor-Traveler Tracking.

O -

C)'

1 O

[22. Identify all S&L, BA, or GE documents, known to IP, specifically calling into question the C) judgment, experience, capability or commit-ment to quality of IP regarding the construc-tion or proposed operation of CPS-l.)

ANSWER: To the best of Illinois Power's knowledge, none

() since the First Supplemental Response.

[23. State whether IP has any knowledge of any IP, BA, or S&L employee resigning his position or otherwise being terminated on account of dis-C) agreement or dissatisfaction with the quality of construction or engineering work, or man-agement decisions or policies relating to the construction or proposed operation of CPS-1 and, if so, identify documents or otherwise provide details pertaining to any such occur-O rences.)

ANSWER: To the best of Illinois Power's knowledge, none since the First Supplemental Response.

O

[24. State whether IP has any knowledge of any IP BA or S&L employee lodging a complaint with

IP concerning disagreement or dissatisfaction with the quality of construction or engineer-ing work, or decisions or policies relating O to the construction or proposed operation of CPS-1, which complaint did not result in the resignation or termination of that employee, and, if so, identify documents or otherwise provide details pertaining to any such occur-rences.)

ANSWER: The answer to Interrogatory No. 24 in the First Supplemental Response is still valid, except that, to date, 74 Quality Reports have been submitted. In accordance with

)

the agreement with the State of Illinois of June 25, 1982,  !

and the Agreed Protective Order dated August 2, 1982, Illinois lO l

i lO w

' C)

() Power will produce documents relating to Quality Reports to the State of Illinois in a separate filing.

ILLINOIS POWER COMPANY

O By

D.P. Hall Vice President

' C) i Sheldon A. Zabel Charles D. Fox IV SCHIFF HARDIN & WAITE 7200 Sears Tower O 233 South Wacker Drive Chicago, Illinois 60606 (312) 876-1000 Dated: '

N3 , 1984

! C)

O O

l O

l

()

l i

l lO

O .

STATE OF ILLINOIS )

O ) sS COUNTY OF MACON )

D.P. Hall, being duly sworn, deposes and says that

!O 'he is Vice President of Illinois Power Company, one of the Applicants in this proceeding; that he has read, or has know-ledge of, the foregoing Second Supplemental Answers of Illinois O Power Company to the State of Illinots' Second Set of Inter-rogatories to Applicant; and that the same are true and correct to the best of his knowledge, information, and belief.

O

/

D.P. Hall

- s ,t SUBSCRIBED AND 3 WORN to before me this cFd day of AnuL , 1984

/

O ,

N/ALs $s >J Notary Public My Cammission Expitc3 . I E*

  • 4 i

\

O '

l -

\ . 'n' l k

8

- . - - E

'O

.O EXHIBIT A Second Supplemental Response of Illinois Power to the State of Illinois'Second

O Set of Interrogatories to Applicants O

O

.O O

'O l

10

.0 4

I

'O

FULL NAME TOTAL bA

& ADDRESS LEVEL CERTIFIED EMPLOYMENT Richard'S. Acevedo II Pip / Mech. 15 Months 2940 San Pasqual- 12-15-82 to Pasadena, Ca. 3-18-83 Craig- E. Anderson '

III QC Mgr. 13 Months 2303 B. Melrose 7-1-82 to Champaign, Ill. 61820 8-3-83 Randy Beeker II Vendor 59 Months 802 Tyle'r Surveillance 5-4-76 to M:nticello, Illinois Engineer 4-24-81 Dennis L. Bell. II Civil / 11 Months 6-28-78 to

~

R. R. 5,- Box ~ 385 Structural Donnellon, Florida '

5-15-79 Gerald Bitner ~, II Hydro & 7 Months Town & Country Hotel ~

Turnover 8-17-82 to Rt. 54 West Coord. 2-25-83 Clinton, Illinois jChrisBlenstraub 11 Piping / 12 Months

- 2313 Anchor Dr. Mechanical 7-2-79 to Bloomington, Ill. Inspector 7-11-80 David Boehm I Electrical 19 Months 211 Third St. Inspector 1-4-82 to Lincoln, Illinois 62656 7-5-83 John (Mike) Brimm I Material 4 Months 158 Lori Lynn ,

Control 2-11-81 *

. Decatur, Illinois Inspector 5-27-81 O e e e e e o e e e e

m TOTAL BA FULL NMIE EMPLOYMENT LEVEL CERTIFIED

& ADDRESS II Electrical 8 Months Wayne Bookman Inspector 1-7-81 to 401 S. Honroe St. 8-11-81 Clinton, Illinois 61727 t l

I Piping / 3 Months Bobby G. Brown Mechanical 6-15-81 to 217 Sorrento Drive Inspector 9-11-81 Tcrre Haute, Ind.

III QC Manager 34 Months C. Bennette Brown ~9-7 E" P.O. Box 306 5-3-78 Clincon, Illinois Civil / 12 Honths II Eric Bergamyer Structural 8-16-78 to RFD 6 Inspector 9-2-77 Bloomington, Illinois Not Certed 7 Days Tracy L. Browning 11-16-81 to 1311 Hersey Rd., Apt. #8 T/A 11-23-81 Bloomington, Ill I Civil / 12 Months Paul E. Bryant Structural 8-16-82 to P.O. Box 48 Inspector 8-12-83 Clinton, Ill III Civil /  ?

Robert Buck Structural 7-74 to 3220 Vining Drive  ?

Decatur, Illinois Electrical 18 Months II Scott Buck [ Inspector 6-17-81 to R.R. #1, Box 27 8-13-82

'HcLean, Illinois 61754

~

4 O O 9 3 g g g

a FULL NAME TOTAL hA

& ADDRESS LEVEL CERTI FI ED EMPLOYMENT Michael D. Bunch II Piping / 19 Months 445 W. Roberts 7-31-80 to Mt. Zion, Illinois 62549 2-9-82 Michael Byers II Vendor . 69 Months RR #2, Box 212 Surveillance 4-5-77 to Ridgeview Acres Engineer 2-23-82 Clinton,-Illinois Ronald Campbell III Senior 18 Months

! RR-2,_30 Deerhaven Drive Piping / 8-18-80 to Bloominton, Illinois Mechanical Engr. 2-23-82 Randy Callison I Civil / 15 Months R. R. #2 St ruct ural 7-23-76 to Ecnnar City. Illinois 10-31-77

-Joe Cavato _ ,

.II Mate rials 23 Months 4030 Buckingham Drive Control 8-2-76 to i Dacatur, Illinois 7-5-78 Jrck Cherry NOT Materials 4 Months

  1. 1 Hillshire Ct.

CERTED Control 1-19-83 to Decatur, Illinois Receiving 4-22-83 l l

l

.Ontries W.-Clark II Electrical 10 Months 13 7th Dr. Inspector 9-30-81 to Decatur, Illinois. 7-30-82 Ccry Conner. ,

II Vendor 7 Months a 2 Striegel Ct. Surveillance 4-5-77 to

. N e raal, - Illinois 10-31-77 O- O e _

e .

e e e e e e .. , _ _

g

l l FULL NAME TOTAL BA f 6 ADDRESS LEVEL CERTIFIED EMPLOYMLNT Michael D. Cook II Piping / 62 Months Mechanical 6-28-78 to 143 Wisconsin Drive I,ecatur, Illinois Inspector 8-12-82 William L. Cook Electrical 6 Months ,

' 906 E. Johnson Clinton, Illinois David Cordy II Electrical 21 Months 907 Westbrook Dr. Engineer 5-4-80 to Mahomet, Illinois 9-15-81 II Piping / 43 Months Frederick E. Creamer Mechanical 7-11 to P.O. Box.871 . 2-13-81 Clinton, Illinois N/A Not Certed Summer help Daniel Cummings 5-25-78 to .

50 Park Lane ~

Clinton,-Illinois 9-5-78 II M/P 18 Months Mylcs Denny 603 E. Washington St.

5-15-78 to 1-21-81 Clinton, Illinois II Electrical 17 Months Warren.Dixon 10-5-81 to liighway 54 3-29-83 Clinton, Illinois II Piping / 17 Months Rickard Emerson 3-11-81 t,o 3244 Bluebird Drive Mechanical 8-12-82 Decrtur, Illinois O * - - - - _ _ _

  • * * *
  • e e e _ _ _ _

FUI.L tWlE TOTAL hA

& ADDRESS LEVEL CERTIFIED EMPLOYMGT Michael R. Evans II Piping / 29 Months 1515 E. Washington St. Mechanical 6-15-77 to Clinton, Illinois 12-31-80 Michrel Fiorentini' II Electrical 10 Months 1714 Hoover Drive 4-19-82 to Normal, Illinois 2-28-83 Thomas Flannery II Vendor 6 Months 11111 Crest Apt. 2 Surveillance 9-16-81 to box 438, RR 2, 2-23-82 Clinton, Illinois Donald " Scott" Foster II Electrical 5 Months 6 Hillcrest 10-6-80 to Clintcn, Illinois 2-27-81 Douglas Fuller I Electrical 3 Months Rt. #7 1-29-81 to Krnny, Illinois 3-3-81 Victor Gallup I Electric 20 Months R.R. 1 3-24-81 to Shsrman, Illinois 62684 10-6-82 Larry Casaway I Electrical 4 Months 518 S. Isabella 1-14-81 to

'C1inton, Illinois 5-19-81 Morgan Gassman, Jr. II Piping / 6 Months RR 2 Box 437 Mechanical & 1-5-81 to Clinton, Illinois Training Coord. 6-16-83

~~

'O' 9 O' e e e e e e e e

FULL NAME TOTAL BA

& ADDRESS LEVEL CERTIFIED EMPLOYMENT Larry Celbert III QC Manager 29 Months RR 1, Box 5 licyworth Illinois 11-26-80 to 4-28-82 5

John Colden II Piping / 13 Months 521 W. Williams St. Mechanical 9-28-81 to-Monticello, Illinois i' 10-26-82 Phillip Gorden I Storage & 13 Months 905 E. Warren Maintenance 2-15-82 to Mow 22qua, Illinois 1-28-83 Clifford Cordon N/A Not Certed 1 Month 139-15 28th. Road 4-20-81 to Flushing, New York 5-29-81 David Graumenz I Electrical 4 Months Apt. #17' 8-10-81 to 1730 S. Fairview 12-22-81 D2catur, Illinois Jeff rey Creachuck N/A Not certed 5 Months 105 E. Orr Apt. E 6-8-82 to Ncmal, Illinois 11-29-82 Joeaph Cuynn II Piping / 6 Months P.O. Box 46 Mechanical 3-3-81 to Cisco, Illinois 9-8-81 James Hall N/A Not certed 1 Month 414 Woodward St. 6-1-81 to Fcrmar City, Illinois 7-21-81 O e e S S 4_ . O e e e 9 _ __1_____

FULL NAME t'3 O TOTAL 11A L ADDRESS LEVEL CEltTI F1 En EMPLOYMENT Ronald lialverson II Piping / 30 Months 605 S. Center Mechanical 6-29-78 to Clinton, Illinois 12-8-80 James llannah II Vendor 1 Month 5173 Lade Rd. East Surveillance 4-13-81 to Cen va, Ohio 44041 5-1-81 Michael liarper I Electrical 12 Months 8-17-81 to 1728 E. North Street Clinton, Illinois 7-26-82 (llarold) Jack Harris III Senior 13 Months RR 4, Box 60 Electrical 3-23-81 to Champaign, Illinois Engineer 4-19-82 Robert lielton I Electrical 8 Months Apt. #1, Park Motel 10-22-80 to Clinton, Illinois 5-27-81 Ben llendricks II Vendor 43 Months 1307 W. Ereck Surveillance 7-10-78 to Urbana, Illinois 2-23-82 James lleyen I Electrical 5 Months 4542 Adams Drive 5-26-80 to Dscatur, Illinois 9-16-80 II P/M 24 Months.

-Joe Ilindman 10-19-77 to Brx 322, 109 S. East Coordinator Clinton, Illinois 1-9-81

%i U FUI.L NAME TOTAL BA

& ADDRESS LEVEL CERTIFIED EMPLOYMENT John Ilinthorn I Electrical 6 Months 1919 E. Clay Limited II l-26-81 to Decatur, Illinois 7-3-81 Ceo rge S. Iloke ,- Jr. II Electrical 3 Months 708 Albert 11111 Road -

7-10-78 to Westminister, Md.

10-3-78 Randy lloke I Piping / 28 Months 18 E. Julia Mechanical 6-20-79 Clinton, Illinois 11-3-81 John flook I Concrete / 16 Months 40 S. Catherine Rebar 5-16-77 to Lo Grange, Illinois 9-21-78 Fred flouseholder II Civil / 60 Months 307 W. Clark, Apt'. 302 Structural 1-5-76 to Champaign, Illinois 1-30-81 Terry Jennings I Ele ct rical 5 Months P.O. Box 122 5-28-81 to Niantic, Illinois 10-27-81 John Johnson II Civil / 31 Months 1222 Searle Drive Structural 8-23-78 to N3rmal, Illinois 2-27-81 terry Johnson - I Electrical 28 Months 60 W. Ilickory Point Rd. 5-9-77 to Decatur, Illinois 9-21-79

^O _ _ _ _ _ _ - _ - _ _ _ _ _

cw h

FUI.L NAME TOTAL BA 6 ADDRESS LEVEL CERTI FIED EMPLOYMENT John Paul Jones II Vendor 45 Months K. R. #1 Surveillance 5-24-76 to Clinton, Illinois 2-13-81 Clement C. Kamphaus N/A Not Certed 1 day 003 Weaver Drive 1-26-81 yrbana, Illinois Donald Kabuss I Electrical 8 Months Brx 58, RR 1 9-9-81 to Danvers, Illinois 4-16-82 Woodrow Kist II Civil / 8 Months RR 1 Structural 7-1-82 to Circo, Illinois 2-25-83 Drniel Kanakares II Staff 7 Months 304 S. Evergreen Engineer 8-16-82 to Bloomington, Illinois 2-25-83 Alan Koca II Piping / 27 Honths R. 1, Country Lane Ct. - -

Mechanical 8-3-7-7 to 11-5-79 Robe rt Knapp II Electrical 11 Months 28 Colonial Dr.#ve #2 9-17-82 to Clinton, Illinois 8-16-83 Rich:rd Kramer II Receiving 17 Months

  • 2664 Burgener Drive 11-17-77 to Dec:tur, Illinois 1-27-78 O 4 _ _

O _ _ _ _ _ _ _ _ _ _

e

  • 9 9 9 e e 9

FULL NMIE TOTAL liA

& ADDRESS LEVEL CERTIFIED EMPLOYMENT Thomas LaBaw None Not Cert 1 Month 268 N. Ash 3-10-81 to Maroa, Illinois 4-27-81 Cerald Lane II Electrical 14 Months 247 N. Wood St. 11-2-78 to Maroa, Illinois 1-14-81 Clen C. Lapsley II Civil / 9 Months 2501 N. East 96th Structural 10-8-76 to Stuart, Florida 7-22-77 William Langley Electrical P.O. Box 306 9-1-83 to Clinton, Illinois A. W. Layfield 3 Months R. R. 2 11-17-78 to -

Farmer City, Illinois 1-24-79 David Laurendine Not Certed 2 Months 21 Imperial Drive 11-13-78 to New Orleans, La. 4-27-81 Ricky Ledbetter N/A Not Certed 1 day 2912 Trent Street 4-3-80 Winston Salem, NC John Linehan III QC Manager 1974 to .

413 N. Monroe C11ntori, Illinois O 9 e e e e e e e e e

i A i

l FULL NAtE TOTAL BA 6' ADDRESS LEVEL CERTI FIED EMPLOYMENT Robert (Robbie) Lord, Jr. II Materials 31 Months 76 S. East St. Control 6-28-78 to Clinton, Illinois Receiving 5-8-81 Clifford Libby, Jr. III Material 26 Months Folly Pond Road Control 6-19-74 to Byverly, Mass. 8-27-76 Calvin Lunny II Piping / 30 Months P.O. Box 993 Mechanical 10-26-76 to Bay City, Texas 4-13-79 Allan Lynch I Piping / 10 Months 112 S. Jackson Mechanical 8-13-80 to Clinton, Illinois 6-12-81 Sam May II Piping / 24 Months

  1. 2 Mayfern .

Mechanical 3-2-81 to Fcrsyth, Illinois 3-4-83

~ Richard McCullough II Civil / 13 Months Structural 1-1-80 to 1522 W. Creen Chrmpaign, Illinois 2-28-81 Timothy McGuire II Electrical 24 Months Mt. Vernon, '

l-4-80 Illinois 12-20-81 Pator J. McKenna II Piping / 30 Months' 1706 E. Washington Mechanical 5-8-78 to 11-21-80

o. e e e e e e e e e _

e _

FULL NAME TOTAL BA

& ADDRESS LEVEL CERTIFIED EMPLOYMENT Martin W. herritt II Piping / 25 Months Box 390, R.R. #2 Mechanical 4-5-77 to Clinton, Illinois 3-20-78 George H. Montgomery II Storage & 9 Honths 1709 E. Washington St. Maintenance 5-18-81 to.

Clinton, Illinois I Piping / l-4-82 Mechanical Thomas C. Moran II Piping / 21 Months 42 Hodgson Ave. Mechanical 1-23-76 to Pittsburg, Pa. 11-77 Timothy D. Morrow II Piping / 46 Months R.R. 4 Mechanical 3-27-77 to Mahomet, Illinois 11-18-80 Helvin Murray II Vendor 12 Months 108 Cinger Creek Ct. Surveillance 2-16-81 to Bloomington, Illinois 2-23-82 Andrew Nielsen II Civil / 28 Months 21 Willowdale Structural 2-16-76 to St. Joesph, Illinois 6-2-78 Malcolm A. Norton II Civil / 6 Months 6058 North Dianne Lane Structural 5-18-81 to Mahomet, Illinois 11-9-81

. William J. O'Brien III Piping / 7 Months

. WYE Motel Mechanical 8-18-80 to Clinton, Illinois 3-17-81 O e G e e _p_ e e e e e e

fu;3 '-

LJ FULL NAME TOTAL hA L ADDRESS LEVEL CERTIFIED EMPLOYMENT Ivan C. Padget II Calibration 12 Months Lot 19 Wilderness Estates Salisbury Lab 4-15-81 to Pleasant Plains, Illinois 3-26-82 Donald Patterson I Civil / 27 Months R. R. #1 Structural 9-15-76 to Clinton, Illinois 12-15-78 R. C. Paulcheck III QC Manager 29 Months 3239 Field Court 4-20-74 to Decctur, Illinois 8-30-76 Scott Piepenbrink II Electrical 7 Months Box 30, R. R. I l-15-81 to Waynisv111e, Illinois 7-24-81 Michael L. Pinca I Electrical 24 Months 15 N. Quincy 9-19-77 to Clinton, Illinois ,

9-7-79 l

Mark J. Porter I Electrical 2 Months 63 Country Club Road 8-24-81 to

, Urbana, Illinois 10-16-81 J. M. Powers III Material 15 Months 409 Washington Street Control 8-30-76 to Shr:veport, La. 12-15-77 Victcr Pozzerle II Piping / 6 Months 7535 Dixie Drive Mechanical 1-5-83 to Hour. con Texas 6-3-83

_f) ,., .

)

G W LJ FULL NAME TOTAL liA

& ADDRESS LEVEL CERTI FI ED EMPLOYMENT Larry J. Prather I Electrical 20 Months 424 W. Prairie Ave, Apt. 6 6-11-79 to Decatur, Illinois 1-7-81 Coleman Price, Sr. II Vendor 20 Months 520 N. Maple Surveillance 6-12-80 to Clinton, Illinois 2-23-82 Thomas C. Quagliano I Electrical 17 Months 907 N. Westbrook 1-5-81 to Mahomet, Illinois 5-12-82 Art Rahm II Piping / 13 Months 51 Cateway Drive Mechanical 2-8-82 to Mt. Zion, Illinois .

1-5-83 Larry C. Ratliff II Electrical 10 Months 304 W. Walnut 11-9-81 to Chatham, Illinois 8-13-82 Kcvin M. Reeves II Piping / 29 Months 140 Magnolia Drive, P.O. Box 127 Mechanical 9-28-78 to Forsyth, Illinois 1-5-32 Htrry C. Reiling II Calibration 23 Months 1617 E. Washington, Box 373 Lab 4-5-78 to Clinton, Illinois 10-22-80 1.ntry Richardson

  • III Calibration 31 Months 1705 S. Country Club Road Lab 7-23-75 to Urbana, Illinois 2-24-78 O 9 e e e e e e e e e

FULL NAME TOTAL BA 6 ADDRESS LEVEL CERTIFIED EMPLOYMENT Roy J. Roberts II Civil / 22 Months 452 B. Granada Street Structural 10-13-76 to Ft. Pierce, Florida 1-3-78 Walter H. Shanks II Civil / 2 Months Rt. 4, Box 674 Structural 3-2-81 to Iuka, Mississippi 5-7-81 Cary Sharar I Materials 19 Months 8905 Marquis Street Control 4-4-77 to Clinton, Maryland 11-28-78 Larry R. Shaw II Piping / 4 Months Rt. 4, Box 601-2 Mechanical 5-7-79 to Lake of Woods Apts. 9-26-79 Mahomet, Illinois William R. Shinneman II Electrical 18 Months 335 Illinois, Box 38 1-23-80 to Deland, Illinois 6-24-81 B. J. Silverstone -

II Piping / 7 Months 2421 E. Washington Mechanical 5-9-80 to Clinton, Illinois 12-12-80 John Skelley I Material 12 Months 2610 E. Main Street Control 11-15-80 to Decatur, Illinois 10-21-81

h W FULL NAME TOTAL bA

& ADDRESS LEVEL CERTI FI ED EMPLOYMiliT A. Edward Skoog II Civil / 5 Months 203 E. Union S t ruct ural 4-12-78 to Mahomet, Illinois 11-1-79 Richard R. Smith II Electrical 17 Months 202 S. Ilickory 5-20-81 to P=ctum, Illinois 10-27-82 Willie 11. Smith II Electrical 2 Honths 621 St. Clair 3-1-83 to Detroit, Michigan 5-2-83 Warr:n (SKI) Sobolewski II Vendor 18 Months 209 E. Jefferson St. Surveillance 9-10-79 to Clinton, Illinois (Lead) 2-23-82 Kurt Sommer II Civil / 24 Months -

104 Scottsdale SQ. Structural 3-10-77 to Wintor Park, Florida 3-27-79 Jef fery D. Sprague (Jeff) II Materials 68 Months 308 S. Center Street Control 1-18-78 to Clinton, Illinois Supervisor 8-2-83 Chnrl;s A. Staffeld II Civil / 42 Months 318 N. Mulberry Street Structural 5-10-76 to Clinton, Illinois 1-6-81

^

Th:odare C. Stama II QC Training 12 Months 7377 Red Arrow Coordinator 3-16-81 to Stev:nsville, Michigan 3-12-82 O e e e e , , , , e e

... m FULL NAME TOTAL BA

& ADDRESS LEVEL CERTIFIED EMPLOYMENT Douglas H. Stephens II Vendor 12 Months P.O. Box 113 Surveillance 7-21-80 to 207 E. High Street 6-1-81 Farmer City, Illinois i

Kevin A. Stirewalt N/A N/A 1 Month 85 Mchawk 5-24-82 to Duight, Illinois 6-8-82 Rob 3rt E. Stout II Electrical 24 Months 2207 Todd Dr. , Apt. #11 1,26-81 to Blv :,ington, Illinois 1-11-83 Robart H. Sturgill I Electrical 18 Months R.R. 4, 28 Colonial Drive 10-1-81 to Clinton, Illinois 4-22-83 Cary Sutton II Civil / 31 Months N.E. 5th 'Avenut, Apt. f4 St'ructural 3-8-76 to Crystal River, Florida 11-6-79 Martin R. Tellez III 27 Months P.O. Box 306 Clinton,-Illinois Earl M. Thomas II Vendor 11 Months P.O. Box 306 Surveillance 3-6-81 to Clinton, Illinois 2-23-82

~

Fred L. Thompson

  • I Electrical 2 Months 395 Loma Drive 6-17-80 to For yth, Illinois 8-8-80

~"-

O 4 0 4 e e 4 e e o _ _ _

e _ _ _

FULL NAME TOTAL BA 6 ADDRESS LEVEL CERTI t'IED EMPLOYMENT Dennis C. Threact III Sr. 71 Months R.R. 2, Box 248A Electrical 4-4-77 to Bloomington, Illinois Engineer 3-9-83 Timothy F. Walker III Piping / 47 Months 2313 Anchor Drive Mechanical 4-5-77 to Bloomington, Illinois 8-15-80 Harold T. Washington II Electrical 5 Months 509 E. Clark, Apt. #35 1-5-81 to Champaign, Illinois 6-2-81 Michrel A. Watkins I Electrical 5 Months RR 2 2-18-81 to Clinton, Illinois 7-3-81 Rich,rd V, Whitehead II Electrical 11 Months 501 N. Grant Street 2-2-81 to Clinton, Illinois 1-11-83 Steven A. Wilber I Electrical 5 Months 215 N. Adams, Box 561 2-4-81 Cerra Cordo, Illinois 7-30-81 Robert G. Willi II Vendor 9 Months 104 Camelot Street Surveillance 6-29-81 to Bloomington, Illinois 2-23-82 4

J. C. Wilson, Jr. III Assistant 5 Honths*

800 Jackson QC 2-10-82 to Monticello, Illinois Manager 6-22-81 O e e e 9 9 9 9 4 8 8

~

FULL NAME TOTAL bA 6 ADDRESS LEVEL CERTIFIED EMPLOYMEtti Timothy C. Wilson I Calibration 19 Months R.R. 1, Box 39 Lab 11-16-81 to Monticello, Illinois 6-18-83 R. C. Wilson III Electrical 35 Months 204 W. 18th Terrace 8-18-75 to Rusrellville, Arkansas 7-26-78 Clarence E. Winfrey III Civil / 59 Months 2311 Calen Street , #42 Structural 5-24-76 to Champaign, Illinois 4-7-81 Donald D. Wooten I Electrical 6 Months 1917 Tracy, Apt. #12 4-27-81 to Bloomington, Illinois 10-30-81 Sam B. Wright II Pipin y,/ 4 Months 801 Willow Creek Mechanical 5-23-83 to LaParte, Texas 9-13-83 Chrries Zalewski II Civil / 42 Months 522 W. Green St. St ructu ral 6-2-76 to Champaign, Illinois 2-27 Merle L. Zumwalt II Civil / 3 Months 702 W. Virginia II Structural 5-16-79 Pr:ria, Illinois 8-17-79 O 9 9 _ ____

9 _

  1. 9 9 9 e 9 9

3 O

EXHIBIT B Second Supplemental Response of Illinois Power to the State of Illinois' Second Set of Interrogatories to Applicants 3

e e

e e

D 9

D

.===. ==a..==..== == ==== .....===..=====a======_. =_m ..==_==_====a==mu==maa========================

===u=== o==.

DUTIES / SUBSTM:CE OF NAME ADDRESS RESPONSIBILITIES QUALIFICATIONS ANY COMPLIANTS

==..........== == =..= ===== ==...=,

......... ............................. =........==.....===....=====. ==..=.. -

TODD MATLOCK, RR 1 l'I PII:C/IlECilANICAL CERTIFIED II NONE KNOWN Argenta, 11. INSPEC10lt Ilired: 5-20-81 DENNIS A. MCCAY, 201 S. 29th St. PIPING /IIECllANICAL TRAINING FOR NONE KNOJN Decatur, 11. INSPECT 0!t LEVEL II Ilired: 9-6-83 (NI:WilIRE)

DWICitT MILLER 34 Cateway Dr. PIPING /!!ECIIANICAL LEVEL II NONE K! OWN Mt. Zion, 11. INSPECTOR llired: 3-16-82 MICilAEL REYNOLDS 1376 W. !!arietta PIPING /flECilANICAL TRAINING FOR NONE KNOWN Decatur, 11. INSPECTOR LEVEL 11 llired: 9-21-83 (NEWilIRE)

JIM SWEARINGEN 604 Rayjon PI PING /MECllANICAL TRAINING FOR NONE KNOWN Oreana, 11. INSPECTOR LEVEL II Ili red : 5-16-83 BILL TAYLOR 745 Fawn Ct. PIPING /flECllANICAL CERTIFIED II NONE KNOUN Decatur, 11. I!!SPECTOR lifred: 10-25-82 LARRY CLARK 1219 E. Washington PIPING /flECilANICAL LEVEL III NONE KNOWN

. . Bloomington, 11. SR. DISCIPLINE Ilired: 1-26-81 J. W. CULIRIBER 303 N. Vine St. PIPING /llECilANICAL LEVEL 11 NONE K!10WN Moweaqua, 11. ENGIllEER 111 red: 12-11-30 DAVE PERKINS 1531 N. Woodland Dr. PII'ING/flECilANICAL LEVEL II NONE KNOW:4 Mt. Zion, I1. ENGIN!:El lit red : 3-23-81 BRIAN WEAVER 916 E. Adams St. PIPING /IlECilANICAL LEVEL II NONE KNOWN Clinton, 11. ENGINEER liired: 5-31-79 0 e G 9 9 9 e e e e' e

.== .== .-===.============.===u....====.u=.========== =================_==============m=======.=== =====......

DUTIES / SUBSTANCE OF NAME ADDRESS RESPONSIBILITIES QUALIFICATIONS ANY COMPLIANTS

. . . - _ = . - . . _ . . . . . = _ . . . - . _ . . . . . . _ _ = = = . . . . . = _ . . . . . _ = . . . . = _ _ = _ = = = . _ = . . = = = = . . _ . . . _ = . . - . . . . . _ . . . _ . . . . = - -

PilIL ADAMS RR 6, Box 188 PIPINC/l!ECilANICAL II NONE KNOWN Decatur, II. Ilired: 7-7-82 SEAN ADAMSON 303 E. Chestnut PIPING /MECilANICAL N/A NONE KNOWN Howcaqua, II. TECil ASSISTANT llired: 6-24-83 BILL ARMSTRONG 1312 W. Ilt. Gilead Rd. PIPINC/MECilANICAL II NONE KNOWN Decat u r, 11. INSPECTOR (LEAD)

Hired: 9-7-82 LARRY BECKER 108 Meadowbrook Dr. PIPING /f!ECilANICAL I NONE KNOWN Bloomington, 11. INSPECTOR TRAINING FOR Hired: 7-7-32 LEVEL II TIM BOLTZ 521 N. !! acon PIPING /!!ECilANICAL I NONE KNotC1 floweaqua, II. INSPECTOR TRAINING FOR llired: 3-24-82 LEVEL II KENWOOD BUSH RR 1, Box 418D PIPING /MECllANICAL II NONE KNOWN Ilonticello, I1. INSPI:CTOR liired: 1-5-83 PAUL BUSilMAN 609 llennanson PIPING /!!ECilANICAL II NONE KNOWN Moweaqua, 11. INSPECTOR llired: 3-24-82 CARY CAMP 1604 Ravina Pk. Rd. PIPING /HECilANICAL I NONE KNOWN Decatur, 11. INSPECTOR TRAINING FOR Hired: 5-16-83 LEVEL II EVELYN CAMPBELL 2069 Ramsey Dr. PIPING /MECilANICAL I NONE KNOWN Decatur, II. INSPECTOR TRAINING FOR Hired: 6-16-82 LEVEL II MICilAEL CHERRY Box 37 PIPING /MECIIANICAL II NONE KNOWN Elwin, 11. INSPECTOR liired: 5-26-82 O O O 9 e e e e e e' e

2 ====, ..======. .. ========...==...=m_===============  :..==_==========u=================_:============ =..==......

DUTIES / SUBSTANCE OF NAME- ADDRESS RESPONSIBILITIES QUALIFICATIONS ANY COMPLIANTS j

.....................................................=......................==..==.............=..................... ...

JACK DIPPOLD RR 1, Box 20 PI PINC/11ECilANICAL CERTIFIED II NONE KNOWN Farina, II. INSPECTOR liired: 3-21-83 JEFF EATON 820 W. !!ain St. PIPINC/?!ECllANICAL CERTIFIED II NONE KNOWN Clinton, 11. INSPECTOR llired: 3-7-79 CEORCE CLTTEL 603 N. !!adison PIPINC/:!ECIIANICAL CERTIFIED 11 NONE KNOWN Clinton, 11. I!3SPECTOR llired: 2-16-82 CINDY HALE 3630 N. Broadway St. PIPINC/MECllANICAL CERTIFIED II NONE KNOWN Decatur, II. -

INSPECTOR llired: 4-27-81 TONY HURTADO 701 N. Plum PIPINC/t!ECilANICAL CERTIFIED II NONE KNOWN Farmer City, 11. I!JSPECTOR llired; 10-18-82 DENNIS M. JACKSON 2039 N. College PIPING /MECllANICAL CERTIFIED I NONE KNOWN Decatur, II . INSPECTOR TRAINING FOR .

Ilired: 12-21-81 LEVEL 11 f RICK KELLY RR 2 .

PIPING /t!ECllANICAL CERTIFIED II NONE KNOWN INSPECTOR Lincoln, II.

llired: 12-13-82 i

DON KERWOOD #10 Illini PIPINC/MECilANICAL TRAINING FOR NONE KNOWN Decatur, II. INSPECTOR LEVEL II Ilired: 8-1-83 (RElllRE)

FATIME LEYNES 320 W. Main, Apt. 5 PIPINC/flECIIANICAL N/A NONE KNOWN Decatur, 11. TECil ASSISTANT liired: 4-4-83 JOllN LONGSTREET 1020 N. Oakerest e PIPING /MECilANICAL TRAINING FOR NONE KN0llN Decatur,11. INSPECTOR LEVEL II Ilired: 9-14-83 (NEWHIRE)

O * * .

  • * * * *
  • o' _.

. ._-.--. -.-.-... ....-- . . - . - - -- - - ..- .- - - -~_ -..-_ - .....~ .-.- -

1 1, 0 4

!O.i EXHIBIT C l Second Supplemental Response of Illinois Power to the State of Illinois' Second Set of Interrogatories to Applicants t iO r

iO 4

1

?

?

1 l

2 -

'O -

e a

h 4-O

(

e 1

!O t

i m

i jO 1

1 I

[

jo

'I l

4 A

IOI i

~

4. , ,, ., . ,- , - .,- , , ,,,.. - . - , -.-#,,...,-,,mn . 4,ie . .[ .'wT.,

, . - , , - ,. .-.,-w....,,,-. ,_--,--w,.--.-~y,. . . . . _ - . , .~- , ,,,,,ver-~..+ - , .

Name & Address Position Duties / Responsibilities Qualifications J.;C. Levinsky Drafting Responsible for the super- Thirty (30) years experi-103 S. Williamsburg Dr. Supervisor vision of all personnel, ence in design and draft-Bloomington, IL 61701 time, production and ing of piping and related preparation of piping, systems. Inclu, des seven-instrumentation, elec- teen (17) years nuclear trical and miscellaneous related design and con-drawings for construction. struction. Five years post high school education in mechanical engineering, math and HVAC.

G. R. Smith Drafting Assistant Supervisor - Ten (10 years experience 303 Union St. Administrative Responsible to replace in construction piping Bloomington, IL 61701 Assistant supervisor in his absence. engineering, design and Responsible for organiza- drafting. Eight (8) years tion, timekeeping, pro- nuclear construction re-gress and production lated. Associate degree I reporting, senior coor- mechanical engineering l dinator supervises cleri- technology. I cal personnel.

A. L. Baker Coordinator Responsible for produc- Five (5) years at Clinton Piping tion of piping drawings site. B.A. in' Graphic 403 Woodlawn Road Lincoln, IL 62656 drafting and miscellaneous draw- Arts.

ings. Supervises checkers and draftsmen.

J. R. Rice Coordinator Responsible for production Three and one-half (3-1/2) 1308 Western Ave. Instrumen- of instrumentation tubing, years at Clinton site.

Champaign, IL 61820 tation isometric and miscellane- B.S. in Architecture.

Drafting ous instrument detail drawings. Supervises checkers and draftsmen.

IO O .O .O O e e e e e e

- - ~_ _ _ __ ~ -- . _ _ _ _ _ _ - _ _ _ . . _-, --- _

I Name & Address Position Duties / Responsibilities Qualifications ,

P. E. Peterson Coordinator Responsible for produc- Four (4) years nine (9)

P. O. Box 1 Electrical tion. Electrical hanger months nuclear related Heyworth, IL Drafting drawings and related mis- experience. Four (4) cellaneous drawings, mis- years drafting-high cellaneous graphics and school.

form work. Supervises checker and draftsmen. '

i R. . L . Pike Coordinator Responsible for the pro- Ten (10) years drafting 1502 Greenridge Dr. Instrumenta- duction and checking of experience; two (2) years 1 Urbana, IL 61801 tion Hanger instrumentation tubing nuclear related at Clinton

Drafting hanger drawings and mis- site. One (1) year tech-cellaneous drawings. nical school.

Supervises draftsmen.

S..L. Leach Senior Responsible for the pre- Six (6) years experience 1274 Brookfield Dr. Checker approval review of instru- in construction; Four (4)

D catur, IL 62521 Instrumen- mentation tubing, isomet- years nuclear related at

- tation ric and miscellaneous Clinton site. One (1)

Drafting instrument detail draw- semester structural steel

i. ings. Works closely with detailing at a community checkers and draftsmen. college.

Three (3) years nuclear Responsible for checking related experience at D. L. Reynolds Checker f P ii P ng and miscella- Clinton site. One (1) i

  1. 42 Morningside Estates Piping ne us drawings. Works year college.

i Lincoln, IL 62656 drafting closely with draftsmen.

R.' Jackson Checker Responsible for checking Two (2) years four (4) 503 S. Clinton St. Instrumen- of instrumentation tubing months nuclear related Clinton, IL 61727 tation isometric and miscellane- experience at Clinton Drafting ous instrument detail site. B. S. in Architec-drawings. ture.

O e. e e e e e e e , ,

Nnne & Address Position Duties / Responsibilities Qualifications Checker Respansible for checking Six (6) years nuclear J.. Wilson ,

Pipin9 of piping isometric and related experience. Two 6714 Trigate .

Missouri City, TX 77459 ,

Drafting miscellaneous drawings. (2) years,collegc.

t -

/

, iT. A. Andredpoulos [ Checker Responsible for checking Twenty (20) years con- '

/ Instrumen- of instrumentation tubing struction pipini~ engineer 1233 Freeport Dr. Four (4) years nu- ~~~

Bloomingdale, IL 60108 tation isometric and miscellane- ing.

Drafting ous instrament detail clear related. Six (6)  !*

~~ years fossil. Two (2) drawings.

. years at Clinton Power Station. Two (2) years college.

,7 ,

W. C. Cwiklik Checker Respon'sible for checking Nine (9) years mechanical Piping of piping isometric and engineering. One (1) 2083 Windward Ln. '

Hanover Park, IL 60103 Drafting miscellaneouse small bore year nuclear related; support detalls. four (4) years fossil.

High school education.

i e

~

l ,

7*  ;  ; y

' Prepares and revises pip-Draftsman F" 2-1/2 years experience at

)k G. W. Smith- ing isometric and miscel- Clinton Power Station.

3573 Hummingbird Dr. Piping D:catur, IL 62526 . Drafting laneous related drawings' Associate degree - in-f per design drawings and

~

strumentation' and process

.' as-built information. s control technology.

j; .

i, ( r Prepares and revises pip- Six (6) years drafting J. Porter __' Draftsman Piping ing isometric and miscel- experience; Two (2) years 934 N. West Jccksonville, IL 62650 Drafting laneous related drawin9s at.Clintoa Power Station, per design drawings and Associate degree - Applied as-built information. Scf.ence/ Drafting Tech.

Prepares traveler adden-dum sketches for field engineers.

^

O O

Name & Address Position Dut ies/Res pons ibi li ti es Qualifications R. A. Stavins Designer / Prepares and revises pip- Sixteen (16) years design 23214 Whispering Willow Dr. Draftsman ing isometric and miscel- and drafting. Six (6)

Spring, TX 77373 Piping laneous related drawings months at Clinton Power Drafting per design drawings and Station. Balance machine as-built information. and petrochemical. Asso-ciate degree Mechanical Technology.

J. A. Christensen Draftsman Prepares and revises pip- Four (4) years drafting 1736 N. Maple P iping ing isometric and miscel- experience. Five (5)

Decatur , IL 62526 Draftsman laneous related drawings months nuclear piping per design drawings and Clinton Power Station.

as-built istf ormation. Seven (7) months Civil /

Structural Clinton Power Station. B.S. in Archi-tecture.

B. Martinovic Designer / Prepares and revises pip- Twenty-two (22) years 1717 E. Washington #6 Draftsman ing isometric and miscel- experience - fourteen Clinton, IL 61727 Piping Draf t- laneous related drawings (14) months nuclear ex-ing per design drawings and perience. Ten (10) years as-built information. experience mechanical design; Eleven (11) years process piping design.

B.S. in Mechanical En-gineering.

T. A. George Draftsman Prepares and revises pip- Three (3) months at Clinton 224 Prospect Rd. , Apt. C-25 Pipin9 ing isometric and miscel- Power Station. Associate Bloomington, IL 61701 Drafting laneous related drawings Degree architectural Draf t-per design drawings and ing. Associate Degree as-built information. Structural Draf ting.

  • O O # # # _ __ 9

i Nrme & Address Position Duties / Responsibilities Qualifications ,

S. Hostetler Draftsman Prepares and revises pip- Two (2) years nuclear P.O. Box 306 Piping ing isometric and miscel- experience. One (1) year Clinton, IL 61727 Drafting laneous related drawings college.

per design drawings and ,

as-built information.

R. Picchietti Draftsman Prepares and revises in- Five (5) years drafting P.O. Box 1412 Instrumenta- strumentation tubing iso- experience; three (3)

Dloomington, IL 61701 tion Drafting metric and miscellaneous years at Clinton Power instrument detail draw- Station; two (2) years ings per design drawing college; two (2) years and as-built information, technical school.

T. Saffaripour Draftsman Prepares and revises in- Seventeen (17) years 300 Shelbourne Dr. 158 Instrumenta- strumentation tubing iso- drafting experience; two Normal, IL 61761 tion Drafting metric and miscellaneous (2) years at Clinton Pow-instrument detail draw- er Station. Assoc. de-ings per design drawing gree Civil / Structural and as-built information. Engineering; three (3) years technical school.

J. B. Leninger Designer / Prepares and revises in- Twenty-one (21) years 6712 Kincaid Dr. Draftsman strumentation tubing iso- engineering experience; Woodridge, IL 60517 Instrumenta- metric and miscellaneous sixteen (16) years in tion Drafting instrument detail draw- power generation related; ings per design drawing seven (7) years nuclear and as-built information. related).

D. Auer Jr. Draftsman Assists instrumentation Two (2) months at Clinton 1402 Chadwick Dr. Instrumcnta- drafting coordinator with Power Station; Two (2)

C rmal, IL 61761 tion Draftin9 record and information years college - Mechani-keeping; performs miscel- cal Technology.

laneous drafting duties.

O e e e e e e e e e e -

i Nare & Address Position Duties / Responsibilities Qualifications A. A. Kahn Designer / Responsible for checking Four (4) years instrumen- '

210 Prospect Ave. Checker of instrumentation tubing tation designer. B.S. in cloomington, IL Instrumenta- isometric and miscellane- Mechanical Engineering.

tion Drafting ous instrument detail  !

drawings.

l J. Lawhorn Draftsman Prepares and revises in- Four (4) years nuclear 109 Elizabeth St. Instrumenta- strumentation tubing _ iso- experience drafting in-Clinton, IL 61727 tion Drafting metric and miscellaneous strumentation tubing iso- ,

instrument detail draw- metrics and hanger de-ings per design drawing tails. Two (2) years and as-built information, technical school.

i i

J. Mathern Draftsman - Prepares and revises de- Four (4) years experience j 54 Gray's Lane Instrumenta- tail drawings of instru- machine detail drafting;

-Decatur, IL 62526 tion Hanger mentation tubing supports One (1) year mechanical Drafting and miscellaneous related drafting; Jr. College

- details per design draw-

! ing and as-built informa-tion.

S. Randolph Draftsman Prepares and revises de- Six (6) years drafting 3868 Camelot'Dr., Apt. #1H Instrumenta- tail drawings of instru- experience; Two (2) years Dscatur, IL 62526 tion Hanger mentation tubing supports nuclear experience; 1 1/2 Drafting and miscellaneous related years college.

details per design draw-ing and as-built informa-tion.

T O e e e o e , , , , ,

Name & Address Position Duties / Responsibilities Qualifications R. A. Chapman Designer / Review Electrical hanger 3 1/2 years experience; 2707 Jamar Tr. 9112 Chec<er and miscellaneous related Two (2) years Clinton D:catur, IL Electrical drawings for completeness Power Station; Two (2)

Drafting prior to engineer's re- years Voc/ Tech. Drafting.

view and approval.

J. S. Thomas Draftsman Prepare and revise elec- 2 1/2 years at Clinton 550 W. North, Apt. 1 Electrical trical hanger and miscel- Power Station. 4 years D;ctur, IL 62522 Drafting laneous related drawings drafting high school.

per design and as-built information.

R. L. Barnhart Draftsman Prepare and revise elec- 2 1/2 years at Clinton 2045 N. Union St. Electrical trical hanger and miscel- Power Station; One (1)

D;catur, IL 62526 Drafting laneous related drawings year mechanical drafting; per design and as-built One (1) year architectur-information. al drafting. Voc/ Tech School.

G. Trotter Draftsman Prepare and revise elec- 3 1/2 years drafting; 1424 N. Oakland Electrical trical hanger and miscel- 1 1/2 years at Clinton D;catur, IL 62521 Drafting laneous related drawings Power Station; 4 years per design and as-built mechanical / architectural

~

information. drafting. Voc/ Tech School.

A. Kistner Draftsman Prepare and revise elec-549 E. South St. Electrical trical hanger and miscel-Mowegua, IL 62526 Drafting laneous related drawings per design and as-built information. Miscellane-ous general drafting (forms, charts, graphs' 17 years drafting 3 1/2 years at Clinton Power etc.) for Jobwide depart-ments and personnel. station. 2 years indus-trial engineering course.

O O O 8 8 _ ____ ___ _ _ __ _ G

Name & Address Position Duties / Responsibilities Qualifications t

S. A. Nihiser Technical Responsible to maintain 2 1/2 years at Clinton 630 W. North, Apt. il Assis*. ant records and storage of Power Station.

Dicatur, IL 62522 Electrical electrical discipline Drafting drawings.

L. Pierce Technical Responsible to maintain Two (2) years at Clinton RR2, Box 175 Assistant drawing files and logs Power Station. Two (2)

Clinton, IL 61727 Drafting pertaining to piping and year degree, legal and j Department instrumentation drawings. executive secretarial  !

(Piping, in- college.

strumentation groups)

P. D. Bessler Jr. Draftsman Responsible to maintain Five (5) years at Clinton 97 Willesrob Rd., Apt. lA Drafting drawing files and logs Power Station.

Dloomington, IL 61701 Department pertaining to piping and instrumentation drawings and miscellaneous draft-ing.

J. D. Peasley Jr. Draftsman Responsible to maintain Two (2) years miscellane- '

405 E. Cole St., Box 132 Drafting drawing files and logs ous drafting. Two (2)

Hsyworth, IL 61745 Department pertaining to piping and years college.

Instrumentation drawings and miscellaneous draft-ing.

i O e e e e e e e e e e

O-CERTIFICATE OF SERVICE O

I hereby certify that an original and two con-formed copies of the foregoing document were served upon  !

s

'O the following:

Secretary of the Commission i

United States Nuclear Regulatory Commission Washington, D.C. 20555

, Attention: Docketing and Service Branch and that,one copy of the foregoing document was served upon each of the following:

L 10 Hugh K. Clark, Esq., Chairman P.O. Box 127A Kennedyville, Maryland 21645 Dr. George A. Ferguson School of Engineering l C) noward University 2300 Sixth Street, N.W.

Washington, D.C.

Dr. Oscar H. Paris Atomic Safety and Licensing Board 1(3 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 i

Executive Legal Director United States Nuclear Regulatory Cummission

. Washington, D.C. 20555 .

'O Philip L. Willman Assistant Attorney General <

Environmental Control Division 160 North LaSalle Street Room 900 '

C) Chicago, Illinois 60601 Jean Foy 511 W. Nevada Urbana, Illinois. 61808 C) ,

l3 L

- .. - = _ . - . __

I O

Prairie Alliance Box 2424 a()

Station A Champaign, Illinois 61820 lierbert !!. Livermore U.S. Nuclear Regulatory Commission RR 3, Box 229A

() Clinton, Illinois 61727 Atomic Safety and Licensing Board Panel i U.S. Nuclear Regulatory Commission Washington, D.C. 20555

() Atomic Safety and Licensing Appeal Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555 '

in each case by deposit in the United States Mail, postage

'O prepaid on April 4, 1984.

I

O c4 9 One of the Attorneys for Applicants Sheldon A. Zabel Charles D. Fox IV SCHIFF HARDIN & WAITE

() 7200 Sears Tower 233 South Wacker Drive I Chicago, Illinois 60606 (312) 876-1000

.O O

O v e