MONTHYEARML20211J9861999-09-0101 September 1999 Application for Amends to Licenses DPR-53 & DPR-69,changing Definition of Azimuthal Power Tilt in TS 1.1,correcting Peak Linear Heat Rate Safety Limit in TS 2.1.1.2 & Correcting Dc Voltage Range Listed in Surveillance Requirement 3.3.6.2 ML20211G7591999-08-27027 August 1999 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.13 to Allow Placement of One or More Fuel Assemblies on SFP Rack Spacers to Support Fuel Reconstruction Activities During Continuing Fuel Assembly Movement ML20196E2101998-11-30030 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,allowing Repair of Defective SG Tubes with leak-limiting Alloy 800 sleeves.Non-proprietary Rev 03-P to CEN-633-NP & Proprietary Rev 03-P to CEN-633-P,encl.Proprietary Info Withheld ML20195K3711998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,removing TS Originally Developed from Reg Guide 1.35 & Implementing Requirements of 1992 Edition Through 1992 Addenda of ASME B&PV Code Section Xi,Subsections IWE & Iwl,Per 10CFR50.55a ML20196A6001998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69, Requesting Indirect Transfer of Control,Pursuant to 10CFR72.50,of Matls License SNM-2505 for Plant ISFSI ML20195J7131998-11-19019 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.6, SWS, by Adding One SWS Heat Exchanger Inoperable as New Condition for LCO 3.7.6 ML20154N1861998-10-16016 October 1998 Application for Amends to Licenses DPR-53 & DPR-69 to Incorporate Revised TS 3.3.1 & 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20236S1341998-07-20020 July 1998 Application for Amend to License DPR-59,implementing Mod That Involves Replacing SW Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20236S5591998-07-20020 July 1998 Application for Amend to Licenses DPR-53 & DPR-69,providing Alternate Cooling Water Supply to Maintain EDGs Operability During 1999 Refueling Outage ML20198K9591998-01-12012 January 1998 Rev 11 to 961204 Application for Amends to Licenses DPR-53 & DPR-69,converting to Improved Sts,Per NUREG-1432 ML20217K6591997-10-22022 October 1997 Application for Amends to Licenses DPR-53 & DPR-69, Incorporating Both Steady State & Transient Degraded Voltage Setpoints Into Tss,As Opposed to Current Single Degraded Voltage Setpoint ML20211J2691997-10-0202 October 1997 Application for Amend to License DPR-53,revising TS to Reflect New Electrical Capacity for 1B Edg.Significant Hazards Considerations Associated W/Change Have Been Evaluated ML20141F9181997-05-16016 May 1997 Application for Amend to License DPR-53,implementing Mod Involves Replacing Service Water Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20136A9751997-03-0606 March 1997 Application for Amend to License DPR-69,allowing Mod to Unit 2 SW Sys Which Constitutes Unreviewed Safety Question in 10CFR50.59 ML20134D2871997-01-31031 January 1997 Application for Amends to Licenses DPR-53 & DPR-69,changing to Support Larger Number of Plugged SG Tubes for Future Operating Cycles ML20149M0801996-12-0404 December 1996 Application for Amends to Licenses DPR-53 & DPR-69,revising TSs to Be Generally Consistent w/NUREG-1432,Rev 1,thus Replacing 2 Current Sets of TSs W/Single Set Applicable to Both Units ML20135A5171996-11-26026 November 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J,To Require Types B & C Containment Leakage Rate Testing to Be Performed on performance-based Testing Schedule ML20128H5971996-10-0303 October 1996 Application for Amend to License DPR-53,changing Provisions for Receiving,Possessing & Using Byproduct,Source & Special Nuclear Matl at Plant ML20117L7801996-09-10010 September 1996 Application for Amends to Licenses DPR-53 & DPR-69 Requesting Extension of ESFAS Automatic Actuation Logic Surveillance from Monthly to Quarterly ML20116F8231996-08-0101 August 1996 Application for Amends to Licenses DPR-53 & DPR-69,allowing Use of Blind Flanges During Modes 1-4 in Plant Containment Purge Sys ML20116E3571996-07-26026 July 1996 Application for Amends to Licenses DPR-53 & DPR-69,to Repair Defective SG Tubes by Electrosleeving ML20117J1911996-05-28028 May 1996 Application for Amend to License DPR-53 & DPR-69,requesting Exigent Amends to Allow Installation of Proposed Modification of Unit 1 & 2 Service Water (SRW) Systems ML20101K5911996-03-28028 March 1996 Application for Amends to Licenses DPR-53 & DPR-69, Requesting to Reduce Moderator Temp Coefficient Limit Shown on TS Figure 3.1.1-1 ML20101D8211996-03-15015 March 1996 Suppl to LAR Re Sleeving Option for SG Tube Repair.Proposes Rev to TS Wording in Attachments (A-3) & (A-4) by Removing Generic Ref to Technical Repts & Replace W/Ref to Specfic Approved Repts ML20096D4291996-01-16016 January 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J to Require Type a Containment Lrt to Be Performed on performance-based Testing Schedule ML20095K2701995-12-21021 December 1995 Application for Amends to Licenses DPR-53 & DPR-59, Requesting Temporary Exemption & TS Change to Allow Placement of Four Lead Test Fuel Assemblies in Unit 1 Reactor Core During Cycles 13,14 & 15 ML20095C7421995-12-0707 December 1995 Application for Amends to Licenses DPR-53 & DPR-69 to Add Analysis Technique to List of Approved Core Operating Limits Analytical Methods in TS for Plant ML20094S1481995-11-30030 November 1995 Application for Amends to Licenses DPR-53 & DPR-59,allowing Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20094D6131995-11-0101 November 1995 Application for Amends to Licenses DPR-53 & DPR-69,upgrading ESF Electrical Sys at Plant to Provide Addl Protection from Loss of Electrical Power ML20093M4141995-10-20020 October 1995 Application for Amend to License DPR-53,extending 18-month Surveillances to 960331 ML20098C0661995-10-0202 October 1995 Application for Amend to License DPR-69,requesting Extension of Unit 2 TS Action Statements 3.7.6.1.a & B from 7 Days to 30 Days for Loss of Emergency Power to Support 1996 Refueling Outage ML20086N2341995-07-13013 July 1995 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 5.2.1 to Allow Use of Lead Fuel Assemblies & Requests Temporary Exemption from Requirements of 10CFR50.46, 10CFR50.44 & 10CFR50,App K for Ccnpp Unit 1 ML20085D4901995-06-0909 June 1995 Application for Amends to Licenses DPR-53 & DPR-69, Implementing Changes to Radiological Effluent TS Per GL 89-01 ML20084R0111995-06-0606 June 1995 Application for Amends to Licenses DPR-53 & DPR-69.Amends Would Revise TSs to Extend Certain 18-month Frequency Surveillances to Refueling Interval ML20084P9681995-06-0202 June 1995 Application for Amends to Licenses DPR-53 & DPR-69,proposing TS Re Pressurizer Safety Valves Lift Tolerance ML20087H9141995-04-28028 April 1995 Application for Emergency Amend to License DPR-53.Amend Would Revise CREVS TSs to Provide an Extension of Allowed Outage Time ML20081D0411995-03-15015 March 1995 Application for Amends to Licenses DPR-53 & DPR-69 to Reformat Current Administrative Controls Section & Relocate Several Requirements to Other Documents & Programs ML20079A5771995-02-24024 February 1995 Application for Amend to License DPR-69,allowing Extension of Interval Between First & Second Type a Test During Second Service Period & Extension of Second Service Period to 12 Years to Coincide w/1999 Plant Inservice Insp ML20078G8161995-01-31031 January 1995 Application for Amends to Licenses DPR-53 & DPR-69,revising TS to Increase Min Amount of Trisodium Phosphate Dodecahydrate Verified in TS Surveillance ML20073G2401994-09-23023 September 1994 Application for Amends to Licenses DPR-53 & DPR-69,allowing one-time Extension from 7 to 14 Days of AOT for Dedicated Class 1E Emergency Power Source During 1995 Refueling Outage ML20071P4421994-08-0404 August 1994 Application for Amend to License DPR-53 & DPR-69,eliminating TS 3/4.3.3.3 for Seismic Monitoring Instrumentation, Relocating Requirements for Operation & Testing of Seismic Monitoring Instrumentation to Plant Updated FSAR ML20149E8321994-08-0202 August 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising Surveillances Associated W/Edgs to Add High Crankcase Pressure to EDG Trips Which Are Verified to Be Automatically Bypassed on Safety Injection Actuation Signal ML20071N2961994-08-0202 August 1994 Application for Amends to Licenses DPR-53 & DPR-69, Incorporating TS 3.9.1, Refueling Operations,Boron Concentration ML20069H6471994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.6.2.2.d,extending Surveillance Interval from 18 to 24 Months ML20069H6191994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.8.1.1.1.b,extending Alternate Offsite Power Circuit Surveillance Frequency from 18 to 24 Months ML20069H6311994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.7.1.2.c,extending Interval for Three Auxiliary Feedwater Surveillance Requirements from 18 to 24 Months ML20069C3921994-05-27027 May 1994 Application for Amend to License DPR-69,revising Heatup & Cooldown Curves & LTOP Controls for Unit 2 to Support Mods to LTOP Sys Scheduled for Spring 1995 Refueling Outage ML20069C2801994-05-27027 May 1994 Application for Amends to Licenses DPR-53 & DPR-69, Revising TS Surveillance Test Interval from Monthly to Quarterly for Several Channel Functional Tests for RPS & ESFAS ML20058K2831993-12-0808 December 1993 Application for Amends to Licenses DPR-53 & DPR-69,revising TS Associated W/Content of Design Features ML20059L4051993-11-11011 November 1993 Application for Amends to Licenses DPR-53 & DPR-69,revising TSs by Relocating Tables of Response Time Limits for Reactor Protection Sys & ESFAS Instruments from TSs to Updated FSAR 1999-09-01
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20211J9861999-09-0101 September 1999 Application for Amends to Licenses DPR-53 & DPR-69,changing Definition of Azimuthal Power Tilt in TS 1.1,correcting Peak Linear Heat Rate Safety Limit in TS 2.1.1.2 & Correcting Dc Voltage Range Listed in Surveillance Requirement 3.3.6.2 ML20211G7591999-08-27027 August 1999 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.13 to Allow Placement of One or More Fuel Assemblies on SFP Rack Spacers to Support Fuel Reconstruction Activities During Continuing Fuel Assembly Movement ML20196E2101998-11-30030 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,allowing Repair of Defective SG Tubes with leak-limiting Alloy 800 sleeves.Non-proprietary Rev 03-P to CEN-633-NP & Proprietary Rev 03-P to CEN-633-P,encl.Proprietary Info Withheld ML20195K3711998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,removing TS Originally Developed from Reg Guide 1.35 & Implementing Requirements of 1992 Edition Through 1992 Addenda of ASME B&PV Code Section Xi,Subsections IWE & Iwl,Per 10CFR50.55a ML20196A6001998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69, Requesting Indirect Transfer of Control,Pursuant to 10CFR72.50,of Matls License SNM-2505 for Plant ISFSI ML20195J7131998-11-19019 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.6, SWS, by Adding One SWS Heat Exchanger Inoperable as New Condition for LCO 3.7.6 ML20154N1861998-10-16016 October 1998 Application for Amends to Licenses DPR-53 & DPR-69 to Incorporate Revised TS 3.3.1 & 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20236S1341998-07-20020 July 1998 Application for Amend to License DPR-59,implementing Mod That Involves Replacing SW Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20236S5591998-07-20020 July 1998 Application for Amend to Licenses DPR-53 & DPR-69,providing Alternate Cooling Water Supply to Maintain EDGs Operability During 1999 Refueling Outage ML20198K9591998-01-12012 January 1998 Rev 11 to 961204 Application for Amends to Licenses DPR-53 & DPR-69,converting to Improved Sts,Per NUREG-1432 ML20217K6591997-10-22022 October 1997 Application for Amends to Licenses DPR-53 & DPR-69, Incorporating Both Steady State & Transient Degraded Voltage Setpoints Into Tss,As Opposed to Current Single Degraded Voltage Setpoint ML20211J2691997-10-0202 October 1997 Application for Amend to License DPR-53,revising TS to Reflect New Electrical Capacity for 1B Edg.Significant Hazards Considerations Associated W/Change Have Been Evaluated ML20141F9181997-05-16016 May 1997 Application for Amend to License DPR-53,implementing Mod Involves Replacing Service Water Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20136A9751997-03-0606 March 1997 Application for Amend to License DPR-69,allowing Mod to Unit 2 SW Sys Which Constitutes Unreviewed Safety Question in 10CFR50.59 ML20134D2871997-01-31031 January 1997 Application for Amends to Licenses DPR-53 & DPR-69,changing to Support Larger Number of Plugged SG Tubes for Future Operating Cycles ML20149M0801996-12-0404 December 1996 Application for Amends to Licenses DPR-53 & DPR-69,revising TSs to Be Generally Consistent w/NUREG-1432,Rev 1,thus Replacing 2 Current Sets of TSs W/Single Set Applicable to Both Units ML20135A5171996-11-26026 November 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J,To Require Types B & C Containment Leakage Rate Testing to Be Performed on performance-based Testing Schedule ML20128H5971996-10-0303 October 1996 Application for Amend to License DPR-53,changing Provisions for Receiving,Possessing & Using Byproduct,Source & Special Nuclear Matl at Plant ML20117L7801996-09-10010 September 1996 Application for Amends to Licenses DPR-53 & DPR-69 Requesting Extension of ESFAS Automatic Actuation Logic Surveillance from Monthly to Quarterly ML20116F8231996-08-0101 August 1996 Application for Amends to Licenses DPR-53 & DPR-69,allowing Use of Blind Flanges During Modes 1-4 in Plant Containment Purge Sys ML20116E3571996-07-26026 July 1996 Application for Amends to Licenses DPR-53 & DPR-69,to Repair Defective SG Tubes by Electrosleeving ML20117J1911996-05-28028 May 1996 Application for Amend to License DPR-53 & DPR-69,requesting Exigent Amends to Allow Installation of Proposed Modification of Unit 1 & 2 Service Water (SRW) Systems ML20101K5911996-03-28028 March 1996 Application for Amends to Licenses DPR-53 & DPR-69, Requesting to Reduce Moderator Temp Coefficient Limit Shown on TS Figure 3.1.1-1 ML20101D8211996-03-15015 March 1996 Suppl to LAR Re Sleeving Option for SG Tube Repair.Proposes Rev to TS Wording in Attachments (A-3) & (A-4) by Removing Generic Ref to Technical Repts & Replace W/Ref to Specfic Approved Repts ML20096D4291996-01-16016 January 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J to Require Type a Containment Lrt to Be Performed on performance-based Testing Schedule ML20095K2701995-12-21021 December 1995 Application for Amends to Licenses DPR-53 & DPR-59, Requesting Temporary Exemption & TS Change to Allow Placement of Four Lead Test Fuel Assemblies in Unit 1 Reactor Core During Cycles 13,14 & 15 ML20095C7421995-12-0707 December 1995 Application for Amends to Licenses DPR-53 & DPR-69 to Add Analysis Technique to List of Approved Core Operating Limits Analytical Methods in TS for Plant ML20094S1481995-11-30030 November 1995 Application for Amends to Licenses DPR-53 & DPR-59,allowing Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20094D6131995-11-0101 November 1995 Application for Amends to Licenses DPR-53 & DPR-69,upgrading ESF Electrical Sys at Plant to Provide Addl Protection from Loss of Electrical Power ML20093M4141995-10-20020 October 1995 Application for Amend to License DPR-53,extending 18-month Surveillances to 960331 ML20098C0661995-10-0202 October 1995 Application for Amend to License DPR-69,requesting Extension of Unit 2 TS Action Statements 3.7.6.1.a & B from 7 Days to 30 Days for Loss of Emergency Power to Support 1996 Refueling Outage ML20086N2341995-07-13013 July 1995 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 5.2.1 to Allow Use of Lead Fuel Assemblies & Requests Temporary Exemption from Requirements of 10CFR50.46, 10CFR50.44 & 10CFR50,App K for Ccnpp Unit 1 ML20085D4901995-06-0909 June 1995 Application for Amends to Licenses DPR-53 & DPR-69, Implementing Changes to Radiological Effluent TS Per GL 89-01 ML20084R0111995-06-0606 June 1995 Application for Amends to Licenses DPR-53 & DPR-69.Amends Would Revise TSs to Extend Certain 18-month Frequency Surveillances to Refueling Interval ML20084P9681995-06-0202 June 1995 Application for Amends to Licenses DPR-53 & DPR-69,proposing TS Re Pressurizer Safety Valves Lift Tolerance ML20087H9141995-04-28028 April 1995 Application for Emergency Amend to License DPR-53.Amend Would Revise CREVS TSs to Provide an Extension of Allowed Outage Time ML20081D0411995-03-15015 March 1995 Application for Amends to Licenses DPR-53 & DPR-69 to Reformat Current Administrative Controls Section & Relocate Several Requirements to Other Documents & Programs ML20079A5771995-02-24024 February 1995 Application for Amend to License DPR-69,allowing Extension of Interval Between First & Second Type a Test During Second Service Period & Extension of Second Service Period to 12 Years to Coincide w/1999 Plant Inservice Insp ML20078G8161995-01-31031 January 1995 Application for Amends to Licenses DPR-53 & DPR-69,revising TS to Increase Min Amount of Trisodium Phosphate Dodecahydrate Verified in TS Surveillance ML20073G2401994-09-23023 September 1994 Application for Amends to Licenses DPR-53 & DPR-69,allowing one-time Extension from 7 to 14 Days of AOT for Dedicated Class 1E Emergency Power Source During 1995 Refueling Outage ML20071P4421994-08-0404 August 1994 Application for Amend to License DPR-53 & DPR-69,eliminating TS 3/4.3.3.3 for Seismic Monitoring Instrumentation, Relocating Requirements for Operation & Testing of Seismic Monitoring Instrumentation to Plant Updated FSAR ML20149E8321994-08-0202 August 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising Surveillances Associated W/Edgs to Add High Crankcase Pressure to EDG Trips Which Are Verified to Be Automatically Bypassed on Safety Injection Actuation Signal ML20071N2961994-08-0202 August 1994 Application for Amends to Licenses DPR-53 & DPR-69, Incorporating TS 3.9.1, Refueling Operations,Boron Concentration ML20069H6471994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.6.2.2.d,extending Surveillance Interval from 18 to 24 Months ML20069H6191994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.8.1.1.1.b,extending Alternate Offsite Power Circuit Surveillance Frequency from 18 to 24 Months ML20069H6311994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.7.1.2.c,extending Interval for Three Auxiliary Feedwater Surveillance Requirements from 18 to 24 Months ML20069C3921994-05-27027 May 1994 Application for Amend to License DPR-69,revising Heatup & Cooldown Curves & LTOP Controls for Unit 2 to Support Mods to LTOP Sys Scheduled for Spring 1995 Refueling Outage ML20069C2801994-05-27027 May 1994 Application for Amends to Licenses DPR-53 & DPR-69, Revising TS Surveillance Test Interval from Monthly to Quarterly for Several Channel Functional Tests for RPS & ESFAS ML20058K2831993-12-0808 December 1993 Application for Amends to Licenses DPR-53 & DPR-69,revising TS Associated W/Content of Design Features ML20059L4051993-11-11011 November 1993 Application for Amends to Licenses DPR-53 & DPR-69,revising TSs by Relocating Tables of Response Time Limits for Reactor Protection Sys & ESFAS Instruments from TSs to Updated FSAR 1999-09-01
[Table view] |
Text
_
/N BALTIMORE GAS AND ELECTRIC CH ARLES CENTER . P. O. BOX 1475. BALTIMORE, MARYLAND 21203 ARTHUR E. LUNDvALL. JR.
v.cc pacs.oc a g gg' gg su m ,
U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, DC 20555 ATTENTION: Mr. Robert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Request for Amendment Gentlemen:
The Baltimore Gas and Electric Company hereby requests an amendment for its operating license DPR-53 and DPR-69 for Calvert Cliffs Units 1 and 2, respectively, with the submittal of the following proposed change to the Technical Specification (TS).
TECHNICAL SPECIFICATION CHANGE (BG&E FCR 82-99)
Replace pages 3/41-21 and 3/41-22 with the attached pages.
DISCUSSION AND SAFETY EVALUATION The following excerpt from the NRC Letter of February 8,1982,is still applicable.
"Each control rod drive mechanism at Calvert Cliffs Units 1 and 2 is Of provided with a reed switch system which provides positive indication of control rod insertion status. The reed switch CEA position indication system L, utilizes a series of magnetically actuated reed swtiches, spaced at 2-inch w 4I6Cil -
intervals along the CEA housing and arranged with precision resistors in a voltage divider network, to provide voltage signals proportional to CEA g y po.ob position. These signals are displayed in bar chart form by a cathode ray tube r (CRT) on the main control board. A logic package associated with the CRT provides redundant alarm functions. A backup readout is provided which can be utilized to read the output of any reed switch voltage divider. The collection of position indicating reed switches for CEA are refered to as a reed switch position indicating channel. In addition to the position indicating reed switches placed at 2-inch intervals, additional reed switches are located at the " full out" and " full in" CEA positions. These reed switches provide 8207010171 820621 PDR ADOCK 05000317 P PDR
I j /
?
l Mr. Robert A. Clark June 21,1982 Page 2 1
verification of full-out/ full-in status on a core mimic which is located on the main control panel. At the present time, TS 3.1.3.3 allows " credit" for the l full-out or full-in reed switches. Upon failure of up to one position
, indicating reed switch channel per CEA group, TS 3.1.3.3 allows power operation to continue provided that the positions of the associated CEAs are periodically verified via the full-out or full-in reed switches.
The Basis for TS 3.1.3.3. states, in part, "The CEA " Full In" and " Full Out" limits provide an additional i independent means for determining the CEA positions when the i CEAs are at either their fully inserted or fully withdrawn positions. Therefore, the ACTION statements applicable to j inoperable CEA position indicators permit continued operations l when the positions of CEAs with inoperable position indicators i
can be verified by the " Full In" or " Full Out" limits."
1 Startup of the reactor with inoperable reed switch position indicating l channel (s) is prohibited, however, since the requirements of TS 3.0.4*. are l
applicable to TS 3.1.3.3."
l During the 1982 Unit 1 outage a second reed switch stack was installed to provide position indication at 1.5 inch intervals. The same modification will be performed on the U-2 system during the upcoming outage. At present the Unit 2 system is accurately described by the above paragraph.
This submittal would provide exemption from TS 3.0.4 allowing plant startup with inoperable position indication channel (s). It accomplishes this by restructuring action statement b so that it addresses two different situations. Section b.1 remains unchanged in content and will apply to any situtation other than plant startup. Section b.2 is a rephrasing of the material in what is existing action statement b.4 and is applicable to position indication failures oaly during a plant startup. This distinction is made so that a plant startup will .not be prohibited by a limited loss of position indication. The restructuring of the TS was found necessary in order to eliminate confusion over which action statement and which times were applicable. The safety evaluation of these changes yields the following supportive statements:
- 1. The original TS allows six hours to reduce power to 70% of rated thermal -
power and four hours to establish a " full out" position indication for the effected rod. The Basis indicates this is to ensure compliance with CEA alignment and insertion limits, and to ensure proper rod block circuit operation. These items in turn ensure local burnup, peaking factors, and shutdown margin are within design limits.
l l - - - , , ~ . . _ _ , , . , , _ _ _ _ . _ _ _ _ _ - . _ _ _ _ _ . _ - _ _ _ _ _ , _ _ _ _ ,
Mr. Robert A. Clark June 21,1982 Page 3 -
During a plant startup, flux levels are lower than those at power and, as actions of the proposed TS must be completed prior to 70% power, would never be as high as those possible for situations action statement b.1 ,
addresses. Therefore, the requirement of ten hours to obtain full out indication is consistent with current safety analysis.
- 2. Transition between modes presents neither a significant increase in risk to the health and safety of the public nor a conflict with current safety analysis. The change in primary parameters during the transition is not large enough in magnitude or duration to effect peaking factors and local burnup.
The short duration for loss of position indication and the limited scope of this loss is acceptable for ensuring SDM has not decreased since the last accurate indication.
In conclusion, this requested change conflicts with no existing safety analysis and poses no significant increase in the risk to the health and safety of the public.
SAFETY COMMITTEE REVIEW This proposed change to the Technical Specifications has been reviewed by our Plant Operations and Safety and Off-Site Safety Review Committees, and they have concluded that implementation of this change will not result in an undue risk to the health and safety of the public.
FEE DETERMINATION We have determined, pursuant to 10 CFR Part 170, Paragraph 170.22, that this Amendment request consists of Class Ill and I amendment for Calvert Cliffs Unit No.1 &
2, respectively, and accordingly, we are including BG&E Check No. A049160 in the amount of $4,400.00 to cover the fee for this request.
BALTIMORE GAS AND ELECTRIC COMPANY
, "R By: / / h 4t/m /41-----
Vice Presiden - Supply l
cc: 3. A. Biddison, Esquire G. F. Trowbridge, Esquire D. H. Jatte R. E. Architzel
Mr. Robert A. Clark June 21,1982 Page 4 STATE OF MARYLAND :
- TO WIT:
CITY OF BALTIMORE :
Arthur E. Lundvall, Jr., being duly sworn states that he is Vice President of the Baltimore Gas and Electric Company, a corporation of the State of Maryland; that he provides the foregoing response for the purposes therein set forth; that the statements made are true and correct to the best of his knowledge,information, and belief; and that he was authorized to provide the response on behalf of sa' Corporatio .
WITNESS my Hand and Notarial Seal: vLCU!b
- b4.0 Notary Public My Commission Expires: 4f / / k